Skip to content
Sign in

Post

Falcon Oil and Gas Ltd.

You’re reading lanman1’s reply in this thread.Jump to it

Treasurer2.1 rating from 21 members727 ptsRate

...will the unitization agreements have to be done prior to testing results...

...anyone have any experience with this type of negotiation...curious to see how the boyz work this deal out and when...gofo and g'day

Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. Pipe, this is from one of the papers I have on Unitization

    ""Before one can arrive at any kind of allocation formula, the relative economic values for the entire unit must be evaluated in detail. "



    So testing would seem to come first. Considering that they need to have their unitization talks before April 1st, the word "expidite" comes to mind here.









    1. the next 77 days should be interesting...in order to do this Exxon/Mol will have to test while drilling then right...if the well takes say 60 days...seems almost impossible after what we have waited for...but hey whats another 60 days...and least it cant say 60-90...unless there is a grace period of course...so do they need a rig to test...that would indicate they would have to have multiple rigs and if toreador had to put off do to lack of rig...maybe that post between pipe and lanman months and months ago was relevant...remember the one when we spoke of the equipment issue and how exxon has buildings with rigs sitting in them...you get the gist...funny how things come around...thanks again mrLanman...gofo and g'day

      1. >remember the one when we spoke of the equipment issue and how exxon has buildings with rigs sitting in them.

        According to Michael Lynch, there are only 50 land rigs in Europe. I have no idea how many of them would be capable of going to 4500 meters or so. In the long term though, they can just build more :)



        -----------------------

        Recent drilling campaigns in the natural gas shales of the U.S. have profoundly affected the domestic industry this last decade. Momentum is still building. Now that Exxon Mobil (XOM) has begun a similar campaign in southeastern Hungary, it is possible that it could spread throughout the EU. Certainly the natural gas shales exist. Will they prove to be as prolific as in the U.S? In the Exxon Mobil, announcement of April 14 regarding the joint venture with Hungary’s MOL for exploration in the Mako Trough, the company stated that they plan to continue the search elsewhere in Europe. This can only be good news for the beleaguered consumers. If XOM does it, Shell, BP, Eni, BASF, Total and GDF/Suez will not be far behind. So a significant discovery or multiple discoveries in Hungary could be the start of an extended boom. Inhibiting such fervor today is a severe shortage of drilling equipment. Today, fewer than 50 land rigs are running in Europe. Rig manufacturers however are always alert to new business opportunities. KCA Deutag with its manufacturing subsidiary, Bentec, would be in excellent geographic position to capitalize on a sustained campaign which could build to 500 rigs over the course of a decade. In the meanwhile, consumers will have to accept the higher prices and threats to security posed by the limited delivery capacity of both Algeria and Russia. The recently published BP Statistical Review of World Energy June 2008 reveals that natural gas production in the Netherlands, Russia and Algeria declined slightly in 2007. Norway’s production was up only marginally. Thus, far the immediate present, natural gas prices will go higher. But a major development of unconventional European resources could be a game changer. And liquefied natural gas (LNG) is gaining ground as well. The European natural gas situation is bleak, but it could be a lot worse.



        1. lanman, he says there are 50 land rigs running in Europe, not that there are only 50 land rigs in Europe. There is a difference.

          Pipe, anytime Exxon needs a rig it will have it. Contractors fall face first to give it to them because of the potential larger contract associated with everything they do. The same applies to any large company running multi-million or multi-billion dollar programmes.



          db

          1. >lanman, he says there are 50 land rigs running in Europe, not that there are only 50 land rigs in Europe. There is a difference.

            Yes, you are correct. The most popular rig counts come from Baker Hughes, and this

            is from their FAQ:

            To be counted as active a rig must be on location and be drilling or 'turning to the right'. A rig is considered active from the moment the well is "spudded" until it reaches target depth or "TD". Rigs that are in transit from one location to another, rigging up or being used in non-drilling activities such as workovers, completions or production testing, are NOT counted as active.

            It's hard to say how reliable these numbers are though, for Hungary they have:

            Nov: 5 oil, 0 gas

            Dec: 3 oil, 0 gas

            We had a Hungarian article on Dec 29 showing Exxon drilling away on the Hod well. I thought they were looking for gas ??? :)

            They show 101 active rigs for all of Europe in Dec 2008.