Here's a chart of famous HP/HT wells. I obviously added the Mako-6 to it, using the bottomhole pressure and temperature. These figures will be obviously lower in the Szolnok formation.


Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. I've added the Szolnok to this chart. There is a HUGE jump in pressure below 4500m, so as long as the wells are above that, the maximum pressure is 7000 PSI, with a temperature of 175 degrees C. I got the data from the 2006 Scotia report.







    1. The Exxon first well was clearly quite an eye opener.The fact they lost it at the bottom and had to turn to key Falcon staff to avert a disaster only further highlights the size of the challenge and relatively how well previously Falcon's own 'mercenary army' had performed.I am not too surprised therefore that after investigation Exxon have decided to change some of their crew.

      The prize is huge,almost mind boggling in its enormity.Such a prize however does not normally come served on a tray.But those who love the buzz on this one,keep biting the nails and make sure everything else is tightly crossed and thank God that science is on our side

      1. The Exxon first well was clearly quite an eye opener.The fact they lost it at the bottom and had to turn to key Falcon staff to avert a disaster only further highlights the size of the challenge and relatively how well previously Falcon's own 'mercenary army' had performed.I am not too surprised therefore that after investigation Exxon have decided to change some of their crew

        Hi BtoB,

        I am new here even attended a couple of AGM's in Vancouve, I live close.

        A question if I may, in your above comment above are you talking about Exxon's

        Mindszent (SP) donut hole well?

        I am not clear on how many wells are and will be drilled on Falcon lands in this phase? and update would be great

        Thanks

    2. Thank you again Lanman for providing the data that places a couple of key Mako wells in context with other basins.

      Now, going forward on the thoughts expressed earlier, there are some key issues to to contend with and they are connected to each other. ONE issue is that we still have the CO2 and H2S (did I get it right?, if not please feel free to put the correct lettering) to contend with. Within a threshold they have to be removed to make the natural gas comercial, this adds cost to an already expensive process. TWO, at higher temperatures and pressures these gases would be even more damaging to the equipment and piping, thus adding greater costs and possibly pushing the deeper sections over the un-economic precipice. THREE if as you say staying shallower than 4500 m is better, and if going deeper is not feasible due to the issues expressed above, then we would loose a significant amount of possible reserves. So we are not potentially as rich as we thought, we would not be able to exploit as much ground as we dreamed, and would further explain why XOM in its infinite wisdom decided to stay in the Szolnok and leave for now, if not for ever, the deeper section. FOUR There is in all this an explanation as to why MOL is interested in unitizing their ground to FO's. We understand XOM's intention, it makes sense for them to treat the whole thing as one. It still does not make sense for FO. Most of the pools of exploitable gas will be either in one or the other ground, unlikely to overlap all along the basin.



      db


      1. Been watching the board a while and thought I'd jump on in. I work in the oil and gas industry and may be able to answer a few questions. Hope this may help.

        To your question #1: Almost all NG produced has to be processed. The upcoming tests of these wells will give data on gas composition and flow rates. Whether existing facilities can handle Falcons production or if upgrades need to be done is another cost factor. Along with drawdown and liquid production, gas composition and flow rates will determine processing costs and the viability of these wells. Both CO2 and H2S are corrosive to pipelines and process equipment and these two gasses vary substantially from well to well. There can also be a variance in the same zone from pool to pool. High CO2 and H2S content can be dealt with but it can be expensive ie: lined pipe, chemical corrosion programs etc.

        Question #2: At extreme temps there is a de-rating of pressurized equipment. This obviously will come into play with the Mako-6 illustrated on the posted graph. Again, It can be dealt with but at huge expense

        Question#3: My guess would be the reason for drilling only to the Szolnok is that they have high expectations for that specific zone. If they don't need to spend huge money to go deep to make viable production, why do it? No one says they can't go deep later. Later on, budgets would be a lot fatter if there were existing production in the area. Meanwhile, Falcon would not technically lose any reserves. I don't know the politics involved with a production license in Hungary but in the area I work in it generally is a 3 year period where the company has to fullfill a minimum drilling commitment. If the commitment isnt met, the land goes back to the land sale. What Falcons production licence specifies is anyones guess. They may lose mineral rights to certain zones if they are not exploited or it may just be a general production licence.

        Question#4: A little politics and concessions were made...enough said. As far as the overlapping of specific pools go, it is very possible. Seismic and test drills (wildcats) do a lot to help map out potential plays but it is an inexact science. Time will tell where the sweet spots are in a pool or if there are multiple pools with production potential

        1. There are a lot of examples of HPHT wells, and a lot of examples of tight gas, but what we have is HPHT Tight gas, something that is somewhat rare these days. Fortunately, the Mako trough isn't the only example, a lot of work is currently going on in Saudi Arabia



          Title

          First Application of High Density Fracturing Fluid to Stimulate a High Pressure & High Temperature Tight Gas producer Sandstone Formation of Saudi Arabia

          Authors

          K. Bartko, C. Arocha, and T.S. Mukherjee, Saudi Aramco, and L. Sierra, J. Terracina, and P. Lord, Halliburton

          Source

          SPE Hydraulic Fracturing Technology Conference, 19-21 January 2009, The Woodlands, Texas

          Copyright

          2009. Society of Petroleum Engineers

          Preview

          Abstract



          Recently Saudi Aramco and international companies started an aggressive gas exploration campaign in tight gas sandstone formations. In most of the cases the prospective tight gas producing zones were discovered at a depth below 20,000 feet where the stress and temperature are extremely high and the reservoir permeability conditions are low; being necessary in all cases to fracture stimulate each horizon to define the fluid and evaluate productivity.

          The extreme stress and temperature conditions are actually one of the main challenges to perform fracture stimulations on this type of formation, this because the fracturing fluid needs to be stable, induce minimum damage and have good proppant transport capabilities at high temperature conditions.

          As a part of the referenced exploration activity in the first quarter of 2008 Saudi Aramco has the challenge to perform a proppant fracture stimulation in a deep tight gas on shore sandstone formation where the temperature and stress conditions (375° F and 1.1 psi/ft at 20,000 feet) exceeded the working pressure capability of the available equipment and the existing fracturing fluids application limits. To answer the referenced challenges and knowing that 20,000 psi fracturing equipment is not available in the area an extensive laboratory evaluation was done to design a new high density fracturing fluid. After a lengthy laboratory evaluation, we were able to select a regional supplier for the 1.48 specific gravity (12.3 lb/gal) heavy brine used as the base fluid and prepare a user friendly cross linked fluid for the referenced field application. The new fluid system was successfully mixed and pumped in the field enabled the treatment of the well through lower surface treating pressure with conventional 15,000 psi equipment, lower horsepower requirements, and a safer work environment.

          The paper summarizes the well conditions, extensive fluid qualification testing, procedures, and specially learned lessons during the referenced first field application of the new fracturing fluid system.

          Introduction

          As Saudi Arabia increases their demand for natural gas inside the Kingdom, ongoing reservoir targets are moving increasingly to more challenging reservoirs which exhibit low permeability of <0.01 md. Reservoir pressure ranges from low or can be extremely high (11-13,000 psi) and the high temperature makes obtaining reservoir data increasingly difficult due to tool limitations. Two particular formations which have recently received attention is the Sarah and Mid Qusaiba formation. These two reservoirs have been penetrated over 25 times in Ghawar and western Rub' Al Khali areas by Saudi Aramco and the International Oil Companies. Reservoir quality is typically moderate to poor (5-15% porosity); natural fractures are thought to significantly enhance deliverability in wells. Recently hydraulic fracturing was included in the testing of these formations which resulted in short term rates of 3-5 mmscfd.

          Hydraulic fracturing these formations are increasingly challenging due to mechanical limitations on the completion assembly and surface equipment. Maximum surface pressure limitations of 15,000 psi with a maximum bottom hole pressure limitation required the use of 12.3 lb/gal sodium bromide (Nabr) brine. Heavy brines have been successful in the deep Gulf of Mexico frac packing however they have never been applied to a tight gas reservoir. Development of this fluid was targeted to local material resources, fluid stability at 375º F temperature, proppant transport capability, and minimal formation damage. The new fluid was extensively tested to ensure it would perform as required in the field.

      2. I think I can add a little to what Senior said.

        >ONE issue is that we still have the CO2 and H2S (did I get it right?, if not please feel free to put the correct lettering) to contend with.

        Well they certainly need to prepare for it anyway, which they apparently have. The levels of H2S they encountered earlier were quite low, and IF they stay that way, then obviously it will have to be removed. The cost should be very minimal at the reported levels. I certainly don't think it's anything to loose any sleep over that's for sure.

        >if as you say staying shallower than 4500 m is better, and if going deeper is not feasible due to the issues expressed above, then we would loose a significant amount of possible reserves.

        Well if there is so much 'easy' gas that it will take them 50 years to extract it all, then I don't think it matters if we loose out on the 'hard to get' gas

        > There is in all this an explanation as to why MOL is interested in unitizing their ground to FO's.

        I've pointed out a few times now that the mining act states that if an accumulation is covered by multiple owners, then they have to unitize. They've followed all the other rules up to now, I don't see why this would be any different.



      3. From what I and others have gleaned DB, the source of H2S has successfully been identified. This problem may well not now repeat itself. As a consequence the fears you raise in the first 2 points simply fall away.

        The point you raise in Point 3 is wrong in 2 ways. Exxon have not said they are restricting their work to the Szolnok. In fact most observers believe they are at the very least very very interested indeed in the Upper Endrod....Moreover as for your (therefore erroneous) comment that "our take" would have to be substantially cut if the target was Szolnok only, IMHO the experts, Scotia, would tell you go back and read their Report again.

        As for Point 4, I am sorry but three wrongs simply added together cannot possibly conjure up a Mol strategy. Nor in fact do the 3 wrongs in any way whatsoever contribute to anyone else 's raison d'etre for an unitisation strategy

        1. Nor in fact do the 3 wrongs in any way whatsoever contribute to anyone else 's raison d'etre for an unitisation strategy

          ...3 bases full and a ball over the wall is a grand slam...so glad to be part of this one in a million company...like that one that was all but done but somehow found a way to create value for its shareholders...tremendous value...and lucky for us the same bloke started that company as well...wonder how one says it wont be long now in czech...nice to have mrSenior join us...mrdirtyboots...just a question out of curiousity...do you thing exxon will bring value to fo...and 2ndly...do you want fo to increase in value...gofo and g'day

        2. >Moreover as for your (therefore erroneous) comment that "our take" would have to be substantially cut if the target was Szolnok only, IMHO the experts, Scotia, would tell you go back and read their Report again.

          As you can see in this Scotia table, the Szolnok is the richest zone.



  2. Great but scary chart Lanman - Thank you as this puts the technological challenge in better perspective. Are there methods of cooling the downhole temperature when they are trying to test as I am thinking that the extra "cold" beers I am drinking of late, as the share price drops a penny a day, won't be quite enough to do the trick!!

    In looking at your chart and following the great posts about new developments in working with HTHP wells, it becomes a lot clearer that Ian McQueen's comments about not giving up on Falcon on only one or two test wells becomes more important. However, if we don't have some decent results from those first test wells, I am trying to prepare myself mentally to not have a heart attack when I see the very swift reaction in the stock price. Regards Paul