Skip to content
Sign in

Post

Falcon Oil and Gas Ltd.

You’re reading solyomtwo’s reply in this thread.Jump to it

Prez3.5 rating from 18 members7.7K ptsRate

Anything new ?

THanks John for providing the links. I just browsed through them and could not detect anything material but a thoroughread tonight will. Noticed the clause about the negative effects if the company lost the CEO... (chuckle)... the great man feeling insecure ?

___________________________________

On the other side, noticed this on PHUN's 8k today...

Restructuring happening at PHUN where an appointed CFO has resigned after 2 months and the CEO's salary is reduced.

8K - 1May 2009

J. Chris Steinhauser resigned as the Chief Financial Officer of the registrant effective April 24, 2009. ...

......The registrant also announced that Charles B. Crowell, its Chief Executive Officer, agreed to a reduction of his annual salary to $270,000, effective April 1, 2009.

Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. I was just having another read of the MD&A. It appears that the unitization talks were slightly delayed.

    In December they said "The Parties shall commence discussions at a mutally agreed-upon time, but no later than April 1, 2009 and continue such discussions on a periodic basis...."

    In the Financials it says:

    "the parties have agreed to use reasonable efforts to combine their respective exploration licenses and mining plots to form one unit consisting of all or part of the Makó Trough, with discussions scheduled to commence in the second calendar quarter of 2009"

    They also used the "U" word in the MD&A :)

    "On December 8, 2008, the PDA was amended to provide that: (a) the parties shall use reasonable efforts to agree on unitizing their respective interests in all or a portion of the Makó Trough"

    This is also interesting:

    "ExxonMobil and MOL are evaluating the existing wellbores and determining their
    recommendations for the Appraisal Work Program"

    It's nice to know they are making recommendations for the Appraisal Work Program. One normally doesn't make recommendations for a program that you don't plan on doing.














    1. >I was just having another read of the MD&A. It appears that the unitization talks were slightly delayed.

      Looks like the lawyers trying to justify their existence :) I think they are haggling over the 100% owned lands. Let's hope MAB out lawyering MOL :)



  2. Well the S&P report was wrong, they don't have 40 employees, they have 42!

    Employees


    As at December 31, 2008, Falcon, Makó and TXM together employed a total of 40 full-time employees and consultants, of which 13 individuals operated from the Company’s headquarter offices in Denver, Colorado and 27 individuals were located in Hungary, supporting administrative operations in Budapest and field operations in Szeged. As at April 29, 2009, Falcon, Makó and TXM together employed a total of 42 full-time employees and consultants, of which 15 individuals operated from the Company’s headquarter offices in Denver, Colorado and 27 individuals were located in Hungary, supporting administrative operations in Budapest and field operations in Szeged. In addition to these employees, the Company also retains consultants and other highly skilled professionals as needed for the Hungary Project and other aspects of its operations. None of the Company’s employees are part of a collective bargaining unit. Management believes that its relations with its employees are good.

    -----------

    This is also the first time they've mentioned the 'pre-existing agreement' in regards to Exxon assigning half of their interest to MOL

    "Pursuant to a pre-existing agreement between ExxonMobil and MOL Oil
    and Gas Plc (“MOL”) and ExxonMobil’s rights under the PDA, ExxonMobil sold one-half of its interest in the Contract Area to MOL, effective April 10, 2008."







      1. >Thanks Lanman1. These numbers make much more sense than the one's being thrown around in our earlier discussions.

        42 employees sounds like way too many. But then again, it's apparently only costing them an additional $217.00 for 29 more people, or $7.50 per person/year. I think that's quite a bargain :)



        April 2008 Annual Information Form:

        As at December 31, 2007, Falcon and Mako together employed 11 full-time employees, no part-time employees and three full-time consultants. As at April 28, 2008, Falcon and Mako together employed 11 full-time employees, no part-time employees and three full-time consultants.

        2007 Payroll: 2,907,783

        April 2009 Annual Information Form:

        As at December 31, 2008, Falcon, Makó and TXM together employed a total of 40 full-time employees and consultants...


        2008 Payroll: 2,908,000

    1. Getting back to this:

      "27 individuals were located in Hungary, supporting administrative operations in Budapest and field operations in Szeged"

      I was just reviewing the Operating Agreement, and it would appear that if these employees are doing work in relation to the JV area, which they most likely are, then just about everything can be billed to the joint account, including office rent, as long as it was first approved by Exxon.

      The cost of services performed with the approval of Operator by the technical and professional staffs of the Non-Operators and the Affiliates of the respective Non-Operators, including the cost to such Affiliates and Non-Operators of their respective Secondees, shall be chargeable to the Joint Account. The individual rates shall include salaries and wages of such technical and professional personnel and Secondees, lost time, governmental assessments, and employee benefits. Costs (other than for Secondees) shall also include all support costs necessary for such technical and professional personnel to perform such services, such as, but not limited, to rent, utilities, support staff, drafting, telephone and other communication expenses, computer support, supplies, depreciation, and other reasonable expenses.




      1. "and the Affiliates of the respective Non-Operators, including the cost to such Affiliates and Non-Operators of their respective Secondees, shall be chargeable to the Joint Account. The individual rates shall include salaries and wages of such technical and professional personnel"



        Lanman, this coverage, that is chargeable to the Joint Account, appears to broad enough that you should be sending in a number of bills for your time. You have put in more time and effort into Falcon than probably any of the highly paid participants in the entire JV (and for that we are all very grateful). Regards Paul

        1. >Lanman, this coverage, that is chargeable to the Joint Account, appears to broad enough that you should be sending in a number of bills for your time.

          Falcon pays me with stock options. I have the option to buy up to 566,507,134 shares :)





      2. Your assumption must be right Lanman on this.A good slice of our payroll costs have surely been defrayed .Otherwise average cost per employee last year including expats working in Hungary is not even $75k

        I bet the payroll number relates almost entirely to the Denver office and the expats working in Hungary

        1. >Your assumption must be right Lanman on this.A good slice of our payroll costs have surely been defrayed .Otherwise average cost per employee last year including expats working in Hungary is not even $75k

          I can just imagine 27 people scrambling to minimize the Beetaloo basin maps when Rex walks into the Budapest office :)







  3. This is new:

    Petrohunter had previously drilled one well in 2007, the Shanandoah-1 well, which was suspended prior to reaching its intended total depth. It is intended that this well will be re-entered in 2009 to drill to the planned total depth.

    So we now know what part of the plan is for the Beetaloo....to finish drilling the Shanandoah-1 to it's original planned depth. So what was the planned depth?

    From PetroHunter in 2007:

    We spudded the Sweetpea Shenandoah No. 1 well on July 31, 2007 and drilled to 4,724 feet. Intermediate casing was run on September 15, 2007 and the well was then suspended with an intention to deepen the well to a depth of 9,580 feet.

    (9580 feet = 2920 meters)

    This is from an article about the Beetaloo:

    "Proterozoic sediments comprising the Roper Group, which are fairly well defined by seismic data in the Beetaloo Basin, reach 3000 m in thickness in the centre of the basin"

    So in other words, the plan for the Shanandoah-1 is to drill right to the bottom of the trough. The location of the Shanandoah-1 is also relatively close to the center of the basin.

    "In the centre of the basin only, the Moroak and Bessie Creek sandstones may include unconventional, indirect, underpressured, basin-centred gas accumulations."

    I would think it is safe to assume that the primary goal of the Shanandoah-1 is therefore to target, and thus prove the existance of, the BCGA.

    From Silvermans report:

    "Only 11 wells have been drilled in the entire basin. Total depths in the previous wells rarely exceeded 2000 m, though at least 3000 m of potentially prospective section is present."

    1. "In the centre of the basin only, the Moroak and Bessie Creek sandstones may include unconventional, indirect, underpressured, basin-centred gas accumulations."

      So then, if the planned depth is 2920 meters, how far down into the Roper Group we'll end up?

      1. >So then, if the planned depth is 2920 meters, how far down into the Roper Group we'll end up?



        The BCGA should be in the Bessie Creek Sandstone.

        "Finally, the Moroak and Bessie Creek sandstones offer a Basin Centered Gas Accumulation (BCGA) play at the center of the basin. It is an unconventional resource play characterized by a lack of a gas/water contact. Petrophysical analyses of several wells previously drilled in the basin demonstrate the presence of a BCGA in the basin."

        "The most likely estimates of recoverable gas in the Moroak and Bessie Creek Sandstones are calculated to be 11.2 and 17.5 trillion cubic feet (Tcf) respectively. These estimates are based on a well spacing of 160 acres and 10% recovery from a calculated most likely, in-place gas resource of 119 Tcf in the Moroak Sandstone and 174.9 Tcf in the Bessie Creek Sandstone. "

        In September 2007, Sweetpea drilled and cased one well the Shenandoah #1 to a total depth of 1,555 meters (4,740 feet) in the area covered by Exploration Permit (“EP”) 98 in the Beetaloo Basin. The test was a twin (50 meter distance) from the Balmain #1 well and was designed to test the Bessie Creek Formation at a depth of approximately 3,000 meters.


        Then again, they might just keep on drilling until they run out of money :)








        1. "The most likely estimates of recoverable gas in the Moroak and Bessie Creek Sandstones are calculated to be 11.2 and 17.5 trillion cubic feet (Tcf) respectively. These estimates are based on a well spacing of 160 acres and 10% recovery from a calculated most likely, in-place gas resource of 119 Tcf in the Moroak Sandstone and 174.9 Tcf in the Bessie Creek Sandstone. "

          To appreciate the sheer size of the Beetaloo Basin, you have to look at this cross section of its geology. The Beetaloo Basin stretches 200 km North to South.