Toreador has a nice timeline for their Tompa well that gives an idea of what we could expect to see. Of course we have the advantage that the pipeline should be in place by the time flow testing starts. This well is located to the west of the Mako Trough. It's a HP/HT tight gas well similar to the Foldeak-1.

Join the conversation about Falcon Oil and Gas Ltd.

Reply

Replies

  1. Toreador Makes Significant Progress in Reducing Debt in Q1
    Toreador Resources Corp.
    |

    Monday, May 11, 2009

    Toreador announced first quarter 2009 financial results. Craig McKenzie, President and CEO of Toreador, said, "Despite the current challenging environment, we have improved the performance of the Company's operations and have significantly reduced costs and debt. The delivery of our 2009 strategic platform is on track, and we will continue to pursue any and all steps to enhance shareholder value."

    Revenues for the first quarter 2009 were $3.4 million compared to $8.9 million in the same period last year, a decrease primarily due to the decline in the average price received for our French oil production and a general decrease in oil production.
    Operating expenses for the first quarter 2009 were $8.9 million compared to $8.2 million in the first quarter of 2008, an increase primarily due to costs associated with the relocation of our headquarters from Dallas, Texas to Paris, France. Operating expenses for the first quarter of 2009 include, in part, $1.7 million of costs associated with various administrative, relocation and severance expenses related to the relocation of our headquarters, $0.8 million of costs related to the resignation of Toreador's former CEO and $0.29 million in stock compensation. Excluding these items from total general and administrative expenses, the overall general and administrative expenses for the first quarter of 2009 decreased from $3.2 million to $2.2 million, a 31% decrease compared to the first quarter of 2008.

    Lease operating expenses for the first quarter 2009 were $1.8 million, a slight decrease compared to $1.9 million in the first quarter of 2008. This decrease is primarily due to the currency effect due to the strengthening of the U. S. Dollar compared to Euro in the first quarter of 2009.

    Depreciation, depletion and amortization expense for the first quarter 2009 was $1.7 million compared to $1.2 million in the first quarter of 2008. This increase is due primarily to the reduction in proved reserves at December 31, 2008, as a result of the $34.29 per barrel year-end oil price used for the reserves evaluation.

    In the first quarter of 2009 the Company recorded a loss from discontinued operations of $4.7 million as compared to a loss of $3.4 million for the comparable period of 2008. The primary reasons for the increase are 1) for the quarter ended March 31, 2008 we recorded depreciation, depletion and amortization expense of $5.7 million while in the comparable period in 2009 there was no depreciation, depletion and amortization expenses recorded since Turkey is accounted for as a discontinued operation; 2) for the quarter ended March 31, 2009, we recorded an impairment of oil and natural gas properties in Turkey of $5.3 million due to the 25% reduction in the posted price of natural gas that was announced by the Prime Minister of Turkey on May 1, 2009; 3) in the first quarter of 2009 Toreador recorded $4.9 million in additional compensation and interest expense associated with the payoff of the credit facility with the International Finance Corporation; 4) in connection with Toreador farming out or selling all of its working interests in Romania and closing its office there, Toreador recorded a gain on the sale of property of $5.8 million for the first quarter of 2009, which had previously been recorded on the balance sheet as "Other comprehensive income"; 5) the Company recorded revenue minus lease operating expense of $1.1 million in the first quarter of 2009 due to the sale to Petrol Ofisi of a 26.75% interest in the South Akcakoca Sub-Basin, as compared to $3.6 million in the comparable period of 2008; and 6) exploration expenses, general and administrative expense, other income and expense and income tax expenses totaled $1.4 million for the three months ended March 31, 2009, as compared to $1.2 million for the comparable period in 2008.

    As a result of the above, for the three months ended March 31, 2009, the Company reported a loss available to common shares of $10.9 million, or $0.54 per diluted share, compared to a loss available to common shares of $4.4 million in the first quarter of 2008, or $0.22 per diluted share.

    Diluted weighted average shares outstanding in the first quarter of 2009 were 20.1 million, compared to 19.7 million diluted weighted average shares outstanding in the first quarter of 2008.

    FINANCIAL, OPERATIONAL AND STRATEGIC UPDATE

    The Company has taken the following proactive steps in the first quarter of 2009 in line with its 2009 strategic platform:

    • The elimination of a significant portion of the Company's debt through the repayment and retirement of the Company's credit facility and the repurchase of a portion of its outstanding Convertible Senior Notes due 2025, both as described further below. In the first quarter, net debt was $43.4 million, which is a reduction of 49% from year-end 2008.
    • The completion of the sale of a 26.75% interest in the South Akcakoca Sub-Basin (SASB) project, located in the Black Sea offshore Turkey, to Petrol Ofisi for $55 million, of which $50 million in proceeds from the sale was paid at closing and the remaining $5 million is payable by Petrol Ofisi on September 1, 2009. A portion of the net proceeds of the sale to Petrol Ofisi sale was used to fully repay and retire the credit facility with International Finance Corporation.
    • The repurchase in the open market of $16.7 million face value of our 5% Convertible Senior Notes due 2025 at a purchase price of $12.7 million. This repurchase will result in a gain of $3.3 million on the early extinguishment of debt, which will be recorded in the second quarter of 2009. After adjusting for the retirement of these notes, the Company's debt to equity ratio will be 1.76 to 1.
    • The announcement of administrative priorities including, the relocation of the corporate headquarters from Dallas, Texas to Paris, France and the appointment of Craig M. McKenzie as President and Chief Executive Officer.
    • The retention of Stellar Energy Advisors, based in London, UK, to manage an open bid process to sell Toreador's remaining assets in Turkey, including its 10% interest in the SASB, in addition to the onshore production, and 2.2 million net acres in exploration licenses that are currently held. All revenues and expenses associated with our Turkish operation for the three months ended March 31, 2009 have been included in discontinued operations and have been adjusted for 2008 to conform to the 2009 presentation.
    • Continued development of the Company's Hungarian assets. As announced on April 14, 2009, the Balotaszallas-E-1 ("THL Ba-E-1") well, which is located in the Tompa Block in Hungary, has reached its final total measured depth of 3,620 meters and successfully encountered the target geologic horizon as a 560 meter over-pressured section of predominantly thin, inter-bedded layers comprising siltstones, shale, and sandstones with some interspersed conglomerates. The fracing program is expected to be completed before the end of May 2009 and results by mid-June 2009.
    • As announced on April 14, 2009, the completion of the Cendere 22 development well in the southeast of Turkey, which reached a total depth of 2,871 meters encountering 21 stands of pure oil during a drill stem test and is currently on production.
    • The continued expectation that Toreador and its partners HEMA Energy and Sherritt International Oil and Gas Limited will spud its Durusu-1 exploration well in the Black Sea before the end of May 2009. The Durusu-1 well will target both the Danisman and Osmancik formations with planned total depth of 2,500 meters subsea.
    • The retention of Gaffney, Cline & Associates, an international oil and gas sector advisory firm, to manage all future reserves verifications.
    • The adoption of a share buyback program for the repurchase of up to one million common shares of Toreador that may be repurchased in the open market at any time over the next 12 months. As of March 31, 2009, no shares of Toreador common stock have been repurchased pursuant to the share buyback program.

    http://www.rigzone.com/news/article....

    1. "The fracing program is expected to be completed before the end of May 2009 and results by mid-June 2009."

      I would have thought they would have said "preliminary results", since the plan seems to be long term flow testing over several months.

      In any case, the other play I'm keeping an eye on strickly out of interest is the Warro gas field. They recently fraced Western Australias first tight gas well. On May 4th they announced that testing had started, and requested a trading halt for 2 days. No word from them since.

      May 4 2009

      TRANSERV REQUEST FOR TRADING HALT

      The Directors of Transerv request that the company’s securities are immediately placed in a voluntary trading halt for the next 2 days. The company requests this trading halt pending an announcement on initial results from the gas flow testing program on the Warro 3 well.





      1. >In any case, the other play I'm keeping an eye on strickly out of interest is the Warro gas field. They recently fraced Western Australias first tight gas well. On May 4th they announced that testing had started, and requested a trading halt for 2 days. No word from them since.

        Maybe they cant decide who should release the information :)

        "Alcoa of Australia is funding the evaluation program in return for a 65% interest in the project while unlisted private company Latent holds a 25% stake. Transerv owns the remaining 10%."

        1. >Maybe they cant decide who should release the information :)

          No, they just hadn't updated their website yet.

          The rates look good considering they are still flowing back. Notice how the full flow test will take upwards of 2 months.



          WARRO 3 – UPDATE ON FLOW TESTING

          Flow testing of the Warro 3 well commenced Saturday, 2 May and has continued for 9 days, with the full flow testing program expected to take up to 60 days. The well is flowing substantial quantities of both natural gas and frac fluids. As
          planned, the Operator has undertaken various activities to assist the cleanup of the well bore, including nitrogen lift and varying the choke.
          A gas flow rate of two million one hundred thousand cubic feet per day (2.1mmcfp/d) at a well head pressure of 325 psi was achieved when the choke was opened to 58/64ths, without the assistance of nitrogen. The fluid flow rate at this time was 1,565 barrels per day. Throughout the testing period the gas flow rate and well head pressure have been steadily increasing, and the ratio of fluids to gas steadily decreasing, indicating that the well is cleaning up.

          Commentary

          The results to date are encouraging and in line with expectations, albeit recovery of the frac fluids is taking time. It is important to note that the potential gas flow rate is expected to be significantly higher once the recovery of frac fluids
          ceases, as this inhibits gas flow. Further, the well has demonstrated an ability to flow gas to surface without the assistance of nitrogen lift notwithstanding the presence of the frac fluids.

          The Operator‘s pre‐well planning allowed for up to 3 to 4 weeks to clean up the well and this now appears a reasonable estimate. Until the frac fluids stop flowing back and the well cleans up, it is difficult to estimate the likely stabilised initial
          gas flow rate of the well.

          1. >The rates look good considering they are still flowing back. Notice how the full flow test will take upwards of 2 months.

            Yes, it takes time that's for sure. I guess we are in for a long hot summer before we get results on flow rates from Földeák-1. Still, it would be nice to get step-by-step information on the progression of the well completion.

            1. Replying to @solyomtwo

              >Still, it would be nice to get step-by-step information on the progression of the well completion.

              As long as they explain the results. Transerv seems to be very good at providing updates, so we can keep an eye on this to see how much the flow increases as the well cleans up. It wil also be interesting to see how good Schlumberger is at predicting flows.

              --------------------------

              The reservoir simulation work by Schlumberger indicated that if the Warro wells are successfully stimulated by hydraulic fracturing using the appropriate frac fluids
              and proppant, an initial flow rate of between 5 and 7 MMscf/d could be achieved from vertical wells. These wells could recover approximately 6 Bcf over a 20 year production life. For horizontal wells the simulated production
              from a well drilled with a 600 metre lateral section and with four stimulations is projected to be between 15 and 29 MMscf/d. These wells could recover between 26 and 42 Bcf over a 20 year production life. Decline rates for both well types are modeled to be hyperbolic, being 25 to 30% per year over the first 10 years.

              1. Replying to @lanman1

                > It wil also be interesting to see how good Schlumberger is at predicting flows.

                .....an initial flow rate of between 5 and 7 MMscf/d could be achieved from vertical wells.

                This would be produced from approximetly 280 meters of pay zone.

                "Warro-3 was drilled to a total depth of 4280m, and wireline logs indicated it had intersected a potential 280m net gas pay zone that had better porosity and gas saturation than expected."

                The Szolnok pay zone is at least three times larger, so a 15-20 MMscf/d would have to be a reasonable expectation :)

                1. Replying to @solyomtwo

                  >The Szolnok pay zone is at least three times larger, so a 15-20 MMscf/d would have to be a reasonable expectation :)

                  The pressures are much higher in the Mako Trough as well. According to Darcy's law, flows are directly proportional to the pressure.

                  Porosity is about the same. It's ~9% in the Warro-3. Permeability is 0.1 to .001 mD, also very similar to what I suspect they have in the Mako Trough.

                  This also sounds familiar, doesn't it?

                  "Schlumberger noted that Warro reservoir characteristics are more favourable than those of Jonah in a number of important areas: the thicknesses of the Warro pay intervals are greater, more laterally continuous and have higher permeability than in Jonah. "

                  "....But they're not as good as the Mako Trough" :)

                  They are flaring the Warro-3 into a flare pit.











                    1. Replying to @lanman1



                      I thought Darcy's Law looked simple enough, until I came across this :)

                      Definition of an Unconventional Gas Reservoir

                      In the 1970s, the United States government defined a tight gas reservoir as one in which the expected value of permeability to gas flow would be less than 0.1 md. This definition was a political definition that has been used to determine which wellswould receive federal or state tax credits for producing gas from tight reservoirs.

                      Actually, the definition of a tight gas reservoir is a function of many physical and economic factors. The following equation, known as Darcy’s Law, relates these physical factors.’

                      The above equation clearly shows that the flow rate, q, is a function of permeability k; net pay thickness h; reservoir pressure p ; flowing pressure pwf; formation volume factor and gas viscosity evaluated at the average pressure, !μ ; drainage area re; wellbore radius rw; and skin factor s. Thus, to choose a single value of permeability to define “tight gas or unconventional gas” is of limited significance. In deep, high-pressure, thick reservoirs, commercial completions can be achieved when the formation permeability to gas is in the microdarcy range (0.001 md). In shallow, low-pressure, thin reservoirs, permeabilities of several millidarcies might be required to produce the gas at economic flow rates, even after a successful fracture treatment.

                      One way to define unconventional gas is as “natural gas that cannot be produced at economic flow rates nor in economic volumes of natural gas unless the well is stimulated by a large hydraulic fracture treatment, a horizontal wellbore, or by using multilateral wellbores or some other technique to expose more of the reservoir to the wellbore.”

                      So what is a typical unconventional gas reservoir? The answer is that there are no “typical” unconventional gas reservoirs. An unconventional gas reservoir can be deep or shallow; high pressure or low pressure; high temperature or low temperature; blanket or lenticular; homogeneous or naturally fractured; and containing a single layer or multiple layers. The optimum drilling, completion, and stimulation methods for each well are a function of the reservoir characteristics and the economic situation. Unconventional gas reservoirs in south Texas may have reservoir properties that are significantly different from those in South America or the Middle East. The costs to drill, complete, and stimulate these wells, as well as the gas price and the gas market affect how tight-gas reservoirs are developed.



                      1. Replying to @solyomtwo

                        >I thought Darcy's Law looked simple enough, until I came across this :)

                        The only thing you need to understand in the Oil & Gas business is Murphy's law :)



                        1. Replying to @lanman1


                          I understand that law quit well :)

                          I never had a slice of bread,
                          Particularly large and wide,
                          That did not fall upon the floor,
                          And always on the buttered side.

                  1. Replying to @lanman1

                    WARRO 3 – FLOW TESTING UPDATE 2


                    The Warro 3 flow testing program is continuing to recover substantial quantities of natural gas and fluids during the well clean up operation.
                    The coiled tubing was removed from the well bore on Thursday, as the coil tubing unit was due to be released to another location. Removal of the coiled tubing increases the volume of the well bore, and therefore the volume of water in the
                    well bore, and was expected to cause a significant drop in the gas flow rate and well head pressure.

                    Upon recommencement of the flow testing on Friday the well flowed gas at an average rate of two million three hundred thousand cubic feet per day (2.3mmcfp/d), with a well head pressure of 240 psi, and the choke opened to 58/64ths. This was a significantly better gas flow than anticipated. Also, the fluid flow rate has declined to 750 barrels per day.
                    The well was shut in on Saturday for static pressure testing, expected to take a few days, with flow testing to recommence thereafter.

                    Commentary


                    The well has now demonstrated an ability to flow gas to surface without the assistance of coiled tubing and/or nitrogen lift. It is important to note that the potential gas flow rate is significantly higher once the recovery of fluids from the
                    reservoir ceases, as this inhibits gas flow. The well performance to date continues to be in line with expectations, albeit the well clean up process continues to take time.

                    The full Warro 3 flow testing program commenced on May 2 and is expected to take up to 60 days. The Company will continue to provide regular progress updates.

                    1. Replying to @lanman1

                      I like this part:

                      "This was a significantly better gas flow than anticipated."

                      This is okay too:

                      "The well performance to date continues to be in line with expectations,"

                      1. Replying to @BrunerFan

                        >"This was a significantly better gas flow than anticipated."

                        >"The well performance to date continues to be in line with expectations,"

                        Well we know the well is still cleaning up, but they did say this prior to drilling:

                        "Schlumberger reported that vertical wells into the Warro Field are expected to yield in excess of 6 Bcf each with an initial rate >6.5 MMcf/d"

                        It's easy for them to say they expect the rates to increase. The question is, will they? It will be interesting (and educational) to see just how much the flow rate changes, and how close Schlumberger comes with their estimates.

















                      2. Replying to @BrunerFan

                        Sounds like great news to these old ears. Anyone have any information on summer schedules for testing other wells? Hopefully this will be a very busy summer for the good folk at Falcon.

                        Doc

                    2. Replying to @lanman1

                      Here's my favorite line from the Warro release: "The Company will continue to provide regular progress updates." Hope we get the same approach from XOM/FO.

                      Also, pretty it's crazy that Friday's 30% rise in Falcon occured within the context of less than $2 million total value traded. It takes very little flow to move this stock up (or down).

                      Turn and run,

                      Giant Hogweed







                2. Replying to @solyomtwo

                  Thanks for the prediction concerning the expected flow rate in the Szolnok pay zone. I'm probably not the only owner of FO shares who is totally lost in the technical jargon of gas production. Please help this nomenclature challenged reader with a translation of 15-20 MMscf/d. I believe this is a significant flow rate per/day indication. How would this translate to actual revenue at today's gas prices? I assume that you feel that this result,if it occurs, would be excellent. Thanks for your continuing most valuable and appreciated information.

                  Doc


                  1. Replying to @drandres

                    > Please help this nomenclature challenged reader with a translation of 15-20 MMscf/d

                    15 mmscf/d - 20 mmscf/d is 15 to 20 million standard cubic feet per day.

                    Gas is usually priced in units of 1000 standard cubic feet. For example, $7 per mcf

                    15 mmscf/day = $7 X 15 X 1000 = $105,000.00 per day

                    20 mmscf/day = $140,000.00 per day

                    If a well cost $12 million to drill and complete, and was flowing at 20 mmcf/day, it would only take 114 days to pay for the well.

                    Of course $7.00 is the selling price of the gas in this example, not the profit (netback), and the flow rate will decline dramatically within the first year, so this is a simplistic example.

                    I don't think I've made any mathematical errors. If anyone sees anything wrong with the above, please feel free to speak up.




                    1. Replying to @lanman1

                      This from another company in Hungary I follow. Royalty and Opex may (will) be different but average price for Q4 and 2008 is nothing to sneeze at.

                      Hungarian gas results:
                      Q4 - Avg. Price - $19.61 - Royalty - $0 Opex - $4.60 - Net-back - $14.95
                      2008 - Avg. Price - $17.37 - Royalty - $1.21 - Opex - $4 .24 - Netback - $11.92
                  2. Replying to @drandres

                    > I assume that you feel that this result,if it occurs, would be excellent.

                    Your assumption is right, anything above 15 MMscf/d I would consider it as an excellent flow rate. However, I wouldn't seriously consider revenues based on today's depressed prices. I would rather speculate in terms of NG prices in 2012 and beyond. The reason being that full-scale production will not start until 2011 the earliest, but I would rather expect it in 2012.

                    1. Replying to @solyomtwo

                      I dont think Solly we need be depressed by today's prices.Rates so far this year have held above $10 and the latest Macquarie Report,even with its downgrade still expects a long term price above $10.In fact I read the other day a Report that concluded that he gas price would continue to outperform oil as the former is set to benefit from the switch from coal to gas fired power stations in Germany and the UK

                      1. Replying to @4modric



                        Other than NG prices, the fast pace of advancement in unconventional exploitation technology will have the most influence on the KPI