NR Started fracing
NR started fracing just recieved NR from InvestorLine account
Too Happy
Join the conversation about Falcon Oil and Gas Ltd.
ReplyYou’re reading sandy9’s reply in this thread.Jump to it
NR started fracing just recieved NR from InvestorLine account
Too Happy
Join the conversation about Falcon Oil and Gas Ltd.
Reply
|
Each of the four planned fractures will be evaluated for flowback rates directly after the operation. Once these fracture stimulations have been completed, ExxonMobil expects to enter into a test period.
What exactly does the above mean? Thought we were waiting on test results that were currently underway. I am not educated on this industry like others on the board so please evaluate the NR for me please. Especially in regards to timing of actual results/news that would move us up or down. Dramatically :) Thanks.
>What exactly does the above mean?
Actually, after fracing comes the most critical part of the completion. Tha following abstact should give you an idea.
There are no test results on the way right now.
After they have perforated the well, they are now going to frac it, which simply means to pump a lot of liquids at high pressure rates into the well to extend the existing rock fractures which will - if successful - increase the production rate and unlock/improve the potential of the well. after the liquids are recovered XOM will test the well and flow it for some time to gather data.
there is definetly a learning curve attached to it, so they might go back into the well for more fracs or for whatever reasons, shut the well down or - worst case - abandon it.
an easy explanation has been posted at the Mako Trough Blog: http://makotrough.blogspot.com/2008/12/hydraulic-fracturing-easy-process.html
for the timelines: just watch the chart, you'll probably see exactly what happens on the ground, but we are talking serveral days if not weeks before XOM releases any data.
as the rumors turned out to be true and todays chart prior to an official news release, everyone should think about the tight-management-no-more-leaks-scenarios that have been promoted by some people around here in the past. it is pretty obvious that the leaks are wide open as the szolnok fractures soon will be...
ph
"Each of the four planned fractures will be evaluated for flowback rates directly after the operation. Once these fracture stimulations have been completed, ExxonMobil expects to enter into a test period."
Does anyone have a good guesstimate of what kind of flows we could expect from a four fracture well stimulation if the results are fairly positive?? With the sloznok having gas charged sands through almost 1000 feet, would this 4 fracture test only be in one very small area of the sloznok? I realize there isn't allot of clarity to clearly answer my question, but it seems that 4 fractures would only be a good start and that any full fracture across many zones all up and down the sloznok will have a much better indication of how successful each sloznok well could be. Nice to hear of action on the well and some nice moves on the stock price. Regards Paul
Replying to @falcon4
>XOM is not going to release a lot of details.
I agree, Exxon won't say much. That's why I like to keep an eye on what their contractors have to say. Sometimes their comments can be quite interesting. For example, we know from pictures that Schlumberger was doing the work on the Hod-1. On July 18th equipment was being set up. On July 24th, Schlumberger had their Q2 conference call, and was asked about Unconventional gas outside of North America.
Wagar Syed - Tristone Capital
Okay, and then on [unconventional] gas outside of North America, what are you seeing in terms of activity and how do you -- when do you think it’s going to become a material business?
Andrew F. Gould
Well, I think that there’s no one answer. For example, you can see already that a lot of the coal bed methane work in Australia is already being tendered. If you are talking about shale gas, North America type, the cost of development overseas is going to be very different from what it is in North America. And the chief reason is because North America already has the most developed oil field service infrastructure in the world and therefore rigs, frac fleets, water carriers, all the rest -- and the availability of water for this business is something that’s very well understood, whereas that is -- with perhaps the possible exception of Germany and Austria, that is not at all the case overseas and therefore we think it will happen but we don’t think it’s something that’s going to spread everywhere very fast. If it does start reasonably quickly, we think it’s probably going to be in Eastern Europe.
Let's not forget: Every formation is unique and therefore XOM needs to learn as much as possible about the formation before they will be able to set up a standard procedure for the fracs. This will take some time as we are in a very early stage here... it could indeed turn out that the set up fracjobs are already enough to flow the well at a interesting level, but we'll see about that.
Phil
PS: I have just added another Video explaining the Fracturing Process to the Mako Blog. Unfortunately I wasn't able to post it here.
Replying to @ihszh
>Any guesses as to how long before fracture stimulation and testing yields useful information? Are we talking days, weeks, months?
A few months ago I mentioned the Warro gas well in Australia several times. The entire reason for doing so was to provide a perfect example of the timelines involved, and the possible problems that can be encountered a long the way. If you read through their news releases from March 31st onwards, all of your questions will probably be answered.
http://www.transerv.com.au/index.php?option=com_content&view=article&id=51&Itemid=54
Replying to @lanman1
Thanks Lanman for the the link to Transerv.com and the reality check. If we follow anything close to this process - the 60 to 90 day rule is back in play!!
The Warro timeline from the first fracture stimulation to the first real flow results shows that testing this first well is very lengthy and complex procedure. In re-reading the Warro 3 results over the past spring and summer it becomes quite a bit clearer how the work done on this first appraisal well may define the work that will proceed with other wells that get drilled at a later date if this one is even moderately successful. Regards Paul
Replying to @ihszh
As far as I know XOM is currently fracturing wells at Piceance within only three days*, but I don't think that's anywhere near realistic at this stage in the Mako Trough. Again, there is a learning curve regarding the formation and reservoir characteristics and they won't develop a standard procedure on one of the first wells. There is yet to be learned a lot more about the formation and XOM is in no hurry here anyways.
I'd say probably a couple of weeks before they release any data, but WTFDIK (and would of cause be pleased to see results earlier than that...)
ph
* Refering to http://www.dallasnews.com/sharedcontent/dws/bus/stories/DN-exxon_26bus.ART.State.Edition1.3cf4b5d.html
Replying to @ph2
> I have just added another Video explaining the Fracturing Process to the Mako Blog. Unfortunately I wasn't able to post it here.
Ok Phil, I have found the video on YouTube.
http://www.youtube.com/watch?v=8gvxFBvHRUY&feature=PlayList&p=1B1EEE51D952361F&playnext=1&playnext_from=PL&index=6
Replying to @solyomtwo
THanks for the Link John.
Pleasantly surprised with the NR and glad to see a relatively small uptick on the SP. My prediction was revised from 15Sep to 15Oct for Volume and price volatility and i missed it by a couple of days. We are now in full gear for a repeat of UPL history.
Hickory Hick Hick Hick........
Replying to @Luxembourg
>My prediction was revised from 15 Sep to 15 Oct for Volume and price volatility and i missed it by a couple of days...
You must have a Chrystal Ball Lux...lol
>We are now in full gear for a repeat of UPL history...
Tick Tock..Tick Tock...;)
Replying to @solyomtwo
Things are going well today now that we got the cap off at .50! Hopefully it will continue as we build towards the BIG BANG!!
Soly and PH thanks for the fracing info.
And Soly, please take the weekend off and go watch some football. Be it on the pitch or on the field! :)
Go Rockies! Go Broncos! Go Longhorns! From Texas :)
Replying to @Deal or No Deal
...a day of firsts...we hit three par four greens off the tee...the putts didnt dop but tap in birds are nice...and a news release that didnt make the sp go down...yet:)...maybe just maybe this mako thing might pay off...gofo and g'day
Replying to @pipedreimr
I'm still here with all my shares, cause i like the szolnok fundamentals.
and of course its about a kilometer thick. Exxon will figure it out in due
time. They are the best, right :)
Replying to @solyomtwo
From Falcon:
"Each of the four planned fractures will be evaluated for flowback rates directly after the operation."
From Transerv releases on the Warro well:
March 31, " The full fracture stimulation program will comprise 5 separate fracture jobs"
April 21, " The frac program achieved seven fracture stimulation stages"
Note the difference between a "fracture job" and a "fracture stage". It's not clear if Exxon is doing 4 frac jobs or 4 frac stages on the F1.
Replying to @lanman1
" Each of the four planned fractures will be evaluated for flowback rates directly after the operation."
This most likely means that they will do one frac JOB, which consists of many STAGES, after which they will flow it back and do a short test. They will then do another frac job, which will consist of more stages....and then test those stages. This process will be repeated 4 times. After all 4 frac jobs are finished, they will do a long term flow test on everything.
"Once these fracture stimulations have been completed, ExxonMobil expects to enter into a test period"
On the Warro well, they didn't test after each frac job.
It took them 4 weeks to flow back the warro well, so if Exxon flows back each frac separately, it could be about 4 months before they actually start the long term flow testing.
Replying to @lanman1
This is from Stephen Keenihan, managing director of Latent Petroleum (operator of Warro)
"We originally designed the well so we would frac a zone, produce it for a while, and then move onto the next zone. Unfortunately, when we took the standby costs of all the crews into the equation we knew it was going to be prohibitively expensive. We knew we would have an issue trying to determine what each of the zones was producing if they were co-mingled but it was a risk we had to take"
So it looks to me like Exxon is doing things the right way, even though it's a lot more expensive. Between each frac job the crews have to hang around, or pack up and head back to Scotland, Germany, or whereever they came from.
Replying to @lanman1
"So it looks to me like Exxon is doing things the right way, even though it's a lot more expensive."
Exxon certainly sounds like the right partner to be involved with our Bird as it will take deep pockets and patience to do the testing right. I hope we hear that it is "stages" they will be doing at each of the four separate fracture stimulations as the flow rates would be potentially quite a bit higher. This kind of time line may require Exxon to sign up for next stage of the agreement before the final flow testing is complete, which would also be very good news and another $75 million in operating capital. Many thanks for taking the time to do this analysis and interpretations of the news release as it gives us all a better look at how this Foldeak-1 well test could evolve. Regards Paul
Replying to @notes6
"This kind of time line may require Exxon to sign up for next stage of the agreement before the final flow testing is complete"
We all look at Stage 2 as being an "opt-in" point. In reality, I believe it's more of an 'opt-out' point. What I mean is that I think Exxon has planned on staying until at least 2012, but stage 2 is there 'just in case' they want out earlier for some reason.
Heres why I think that:
"The four-year exploration program including appraisals is a key part of the program, which will really dictate whether the feasibility of future production can be established. Then a development pilot will test a certain amount of wells in order to put even more certainty until the large-scale development program can be carried out. "
"It's very important both for Exxon and MOL there are very clear exit points at the key stages of the operation. I.e., that the risks, of course, and mitigation of the risks can happen in different stages, depending on the maturity of the program."
ZOLTAN ALDOTT, EVP EXPLORATION & PRODUCTION, MOL GROUP, April 2008
So he's calling Stage 2 an 'exit' point, not an 'entry' point. I think there's a big difference.
Replying to @notes6
>Exxon to sign up for next stage of the agreement before the final flow testing is complete, which would also be very good news and another $75 million in operating capital. Paul, it seems for some reason this notion that the second payment worth $75 million dollars has stuck in your mind. Actually, the second payment is $50 million. “Second Payment. Within ten (10) business days after ExxonMobil has provided the Appraisal Option Notice, it shall pay to Falcon (or Falcon’s designee) the amount of US$50,000,000 (the “Second Payment”), by wire transfer to the account specified in Section 7, above.” Hopefully, in due time we get to the Development Phase and then Falcon will collect the third payment that’s worth $75 million dollars. Regards, John.
“Third Payment. Within ten (10) business days after ExxonMobil has provided Falcon with the Development Option Notice, ExxonMobil shall pay to Falcon (or its designee) the amount of US $75,000,000 (the “Third Payment”), by wire transfer to the account specified in Section 7, above.”
Replying to @solyomtwo
Thanks for clearing that up John as I must have looked at the third phase by mistake. Either amount will be nice to see showing up in Falcon's account as even Bruner shouldn't be able to spend the full amount on dancing girls and other office improvements :) Regards Paul
Replying to @solyomtwo
>Hopefully, in due time we get to the Development Phase and then Falcon will collect the third payment that’s worth $75 million dollars.
Actually the 3rd payment was reduced by 50% back in December. Falcon is to get $37.5 million and the other $37.5 has to be applied to the development costs.
The Third Payment (as defined in Section 14 of the PDA) shall be amended to be a payment to Falcon (or its designee) of the amount of US $37.5M (instead of US $75 M), which represents the payment by ExxonMobil Mako of US $18.75 and MOL of US $18.75M
One thing I just noticed, is that the money will be coming from Exxon and MOL. If I'm not mistaken, the first $25 M was paid fully by Exxon only.
It's also interesting that there appears to be 4 stages now, not 3. The Initial Work Program, the Appraisal Work Program, a Pre-Development Work Program, and a Development Work Program. Falcon gets the $37.5 if they proceed to the Pre-Development Work Program.
Replying to @lanman1
This is from Bruner in 2007:
Now once the testing stage is finished in these different wells, and we understand what each individual zone will contribute, we are able at that point to do multiple frac jobs and stages, for example like they do up at Pinedale, all at one time and not test each individual sequence. So that is going to be real big advantage in the future when we go into the exploitation phase. But right now we need to know what we have got. All of our strategic partners are going to want to have the same type of testing program that I have just described to you so they understand whenever we ramp up the operation to go into the exploitation phase what size drilling rigs we are going to need, what depths we are going to be drilling to and what we are going to be completing in. This is a process that unfortunately takes time and unfortunately will take more time in these 6 wells because of the fact that we have these minor amounts of H2S
So it looks to me like all the puzzle pieces fit together perfectly. Exxon still has a lot to learn before they can drill a well, apply their multi-zone frac technology, and put it into production right away. They are taking their time, and are fracing one zone at a time, regardless of the expense.
As far as the frac crews hanging around between frac jobs, well that's not the case if you have several wells on the go! I wonder if they did one frac job on the Hod-1, and while that well is cleaning up, they have moved over to the Foldeak-1. Once the first frac is finished on the Foldeak-1, they move back to the Hod-1. That would be the most logical and cost effective thing to do anyway.
Replying to @lanman1
I would like to toss in a different angle on this.
As far as we know, the test wells that they (we) are working with now are all deep vertical holes. By perfing, fracing, and flowing a number of stages (4 in this case) along the vertical payzone they are going to see the different characteristics of the payzone (homogeneous, natural fractures, sweet spots, dead spots, etc.).
I'm sure they would do a single stage, flow and test that stage for a few days, run a bridge plug, and then do the next stage further up the hole; repeating the process. Ultimately this may give them a better idea on where/if a horizontal leg (or multi-laterals) would be advantageous.
Once they determine where they are going to extract the gas from, I would imagine that the frac program would change to a one day, multi-stage frac, where they flow all the zones together.
I just had a conversation with another Falcon follower and asked him about only 4 fracs. His reply was that Exxon only performed 2 fracs on their well outside FO's shared land and that Exxon plans to test after each of the four fracs on this well. I see that as a positive in how they are trying to figure out how to pick this Giant Treasure chests lock. He expects to hear some news on the first test next week. So here we go .....
2 Happy
Hi,
If I recall correctly this well is only 1km from the pipeline at Mako 6 and they
already have a permit applied for to run the pipe. We might see gas flowing
in pipe in a couple of months. Once started it would take a couple of
weeks to run the pipe.
Long and Strong