Look what fancamp let go of -- another 2 billion dollar project.

Argex releases positive preliminary economic assessment study on the La Blache project

cnwgroup

Related Quotes

SymbolPriceChange ARGEF.PK
0.44 0.00
Chart for ARGEX MINING INC
{"s" : "argef.pk,rgx.v","k" : "a00,a50,b00,b60,c10,g00,h00,l10,p20,t10,v00","o" : "","j" : ""}
Press Release Source: ARGEX MINING INC. On Wednesday October 26, 2011, 7:30 am EDT

MONTREAL , Oct. 26, 2011 /CNW Telbec/ - Argex Mining Inc. ("Argex") is pleased to report that it has received the results of the preliminary economic assessment (PEA) completed on its 100%-owned La Blache project located on the North Shore of Quebec . The PEA study was completed by BBA Inc. of Montreal , Quebec with the collaboration of Met-Chem Canada Inc. and Genivar. The complete technical report will be filed on SEDAR and Argex's website within 45 days of this news release.

The La Blache PEA study includes the following highlights:

  • IRR (Pre-Tax): 32%;
  • NPV: $2.2 billion (using an 8% discount rate);
  • Payback period of 7 years - assuming a staged, modular plant construction;
  • Total operating cost (net of by-products) of $586 per tonne of TiO2 (averaged over the life of the mine);
  • Price per tonne of TiO2 (trailing 3 year average): $2,846 ($US/tonne);
  • Capital costs: $801 million ;
  • Timeline: 25 years;
  • Life of mine: 25+ years of mineral resources (in all categories);
  • Production profile: 195,000 tonnes of TiO2 at capacity;

"The La Blache operation outlined for this PEA represents extremely positive news for Argex and its shareholders. The high NPV, high IRR and high cash flows represent a significant validation of the economic viability of La Blache. Our results to date and this independent engineering study make a compelling case for expediting the La Blache project," said Roy Bonnell , President and Chief Executive Officer of Argex.

"I am very pleased at the progress the team has made on the La Blache project," Roy Bonnell added, "In less than 2 years, during a period of great market volatility, we have raised the required funds, completed the required drilling program, collaborated in the development of a unique proprietary extraction process, and delivered this positive scoping study."

The PEA study shows a net present value (NPV) of $ 2.2 billion at a cash flow discount rate of 8 per cent over a 25 year time period. The model is based on an initial production profile of 15,000 tonnes of titanium dioxide (TiO2) per year, which is subsequently scaled up to 195,000 tonnes per year. The internal rate of return (IRR) for the project is 32% (before tax).

Enrico Di Cesare, Chief Operating Officer and Vice-President of Technology of Argex, commented on the report as follows, "This study confirms the technological and economic viability of Argex's proprietary metallurgical process and clears the path towards the next step, the construction of an industrial-sized pilot plant."

"As a typical PEA is based on laboratory-scale metallurgical testing," added Mr. Di Cesare , "our study has gone well beyond what is normally expected as we have operated the mini-plant continuously since February 2011 . This should permit us to fast-track our feasibility-stage studies."

Argex's proprietary technology allows the production of high-purity TiO2 directly from the run-of-mine material, and the TiO2 pigment produced has achieved brightness results that are in line with or superior to some of the major TiO2 industry producers.

The study assumes a three-year trailing average price for TiO2 of $2,846 per tonne. In a recent market report by Credit Suisse dated October 13, 2011 , the current price for TiO2 now exceeds $3,740 per tonne. As reported in the August 31, 2011 news release by Argex, the updated price forecast by Ti Insight LLC for high-quality titanium dioxide (TiO2) pigment will exceed $6,000 per tonne in 2015 for all global sales regions.

The PEA is preliminary in nature and it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions reached in the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Key Parameters & Assumptions
IRR (Pre-Tax) = 32%
NPV (undiscounted) = $8.1 Billion
NPV (at 5% discount rate) = $3.5 Billion
NPV (at 8% discount rate) = $2.2 Billion
NPV (at 10% discount rate) = $1.6 Billion
Payback = 7 years
Exchange Rate ($US:$CDN) = 1.00
TiO2 Price = $2,846.00 ($US/mt)
Iron Oxide Briquettes = $135.00 ($US/mt)
Hydrometallurgical Plant Recoveries: TiO2 (87%); Fe (90%); V (90%)
Capital Costs
(in millions of U.S. dollars)
Mine = $22.8 Million
Hydrometallurgical Plant = $778.6 Million
Operating Costs
(in U.S. dollars per tonne of TiO2)
Average Operating Cost (Net of by-products) = $586 ($US/tonne TiO2)

The in-pit mineral resources calculated by BBA Inc. using a 11.76% Ti-equivalent cut-off grade, total 7.8 million tonnes grading 10.69% Ti, 41.92% Fe and 0.24% V in the measured category, 16.9 million tonnes grading 10.69% Ti, 41.95% Fe and 0.24% V in the indicated category, with an additional 4.7 million tonnes grading 10.67% Ti, 41.76% and 0.25% V in the inferred category. The mineral resource estimate was completed by Met-Chem and reported in the Argex news release dated May 18, 2011 .

The technical information disclosed in this news release has been reviewed and approved by Murray Brown , P.Eng. and Patrice Live, P.Eng., independent Qualified Persons for BBA Inc. and André Laferrière, P.Geo., Qualified Person for Argex as defined by National Instrument 43-101 for the Standards of Disclosure for Mineral Projects.

About Argex Mining

Join the conversation about Fancamp Exploration.

Reply

Replies

  1. You can’t have your cake and eat it. If it weren’t for such things as Argex,
    the money we have for such things as Magpie wouldn’t exist.
    Would you have preferred massive dilution instead?

    The complaint we hear on this Message Hub, over and over again, is our plate is too full as it is.
    We should focus our attention on what really counts and not be spreading ourselves too thin.
    Well, if we had kept Argex, where would the money have come from to exploit it?

    Many times on this Message Hub I’ve read outraged investors complain
    we’ve been idly standing by while everybody’s racing past us.
    Well, if we hadn’t the funds to get anything done, what would the outcry have
    been had we been stalled in the middle of the highway, with no gas in the tank?

    The irony is, so far as Argex is concerned, indeed we’ve kept a huge chunk of the cake.
    Keeping 4% of the company, plus securing an option for 50% of the NSR is not exactly
    “letting go” (as you put it). If ever there was a case of having cake and eating it, this is it.

    If that weren’t enough, on the subject of titanium, Magpie has many times more of it than Argex.
    1. Fani, are you short FNC or something? I understand your frustration here but this incessant complaining isn't helping anything. In fact, it's starting to seem less like complaining and more like bashing! You've got to realize that sometimes investors read forums like this before buying a stock. Do you think they're gonna wanna buy after reading your posts? Even if retail buying isn't what's gonna get us over a buck, it couldn't hurt.

      Forget about La Blache. We have more than enough already. I know that this sp is ridiculous but please try to be less destructive and more constructive. Thanks.

      1. It's a good one sellers are drying up sp is climbing slowly and the chart is looking good I see .35-.40 soon there isn't much left at .275 would be nice to see it taken out will see how this last hour plays out!
        1. Good news from Europe looks like they are sorting things out if this is the case look for a rebound in iron ore and copper stocks as they were pummeled FNC should get to that .40 mark very soon I see volume has increased in chm substantially in last 20 mins they should turn green soon also I believe rgx was selling on news watch for it to green tomorrow things may finally heat up again soon!
  2. What is your point/

    Shall we cry over spilt milk or attend to what we have?

    Your action plan?

    FNC owns shares in RGX 2 year lock up still

    1. every hear of the old adage - history repeats itself.

      well a bad deal happened twice.

      you think Peter is capable of "screwing" up another time or two? I do.

      So I don't cry over spilt milk... i just cringe - and worry that Peter will NEVER unlock value because he is incapable.

      we had this discussion at this time last year prior to the AGM -

      what's changed??? More shares - lower stock price.... Now that's progress.

      I know - tell me about all the wonderful things that are on the come -- but haven't happened... and when they do how great an impact it will have ....

      Just keep them on their toes.