Skip to content
Sign in

Fury Gold Mines Limited

$FURY · TSX

Unclaimed AGORACOM Hub

Fury Gold Mines Limited

  • CanadaTSX:FURY

Fury Gold Mines Limited is a Canadian gold exploration company with four material projects: Eau Claire, Sakami and Éléonore South in the Eeyou Istchee James Bay region of Quebec, and Committee Bay in the Kitikmeot region of Nunavut.

Company facts

Exchange
TSX
Symbol
FURY
Industry
Metals & Minerals

Company overview

TSX: FURY

Fury Gold Mines Limited

Canadian gold explorer advancing four projects in Quebec and Nunavut

Eau Claire PEA: C$554M NPV5%.Committee Bay drilling underway.Sakami resource 825,000 oz Au.

Fury Gold Mines is a Canadian gold exploration company with four projects in the Eeyou Istchee James Bay region of Quebec and the Kitikmeot region of Nunavut. It is advancing Eau Claire through drilling and pre-feasibility, and completed a 2025 PEA outlining an 11-year mine life. The company has no mining revenue and is funded by recent flow-through financing.

C$5.8M
Cash
C$43.7M
Securities
C$7.8M
Net loss
190.1M
Shares out

Four gold projects in Quebec and Nunavut.

The company

Canadian gold exploration company

Fury Gold Mines Limited

  • Four projects: Eau Claire, Committee Bay, Sakami, Éléonore South.
  • Exploration-stage with no mining revenue.
  • Common shares trade on TSX and NYSE American under FURY.

Fury is an expenditure-based junior resource exploration issuer. It reports no mineral reserves and states its mineral resources have not been demonstrated to be economic at a pre-feasibility level.

The projects

Four material gold projects

Quebec

Eau Claire

100%-owned. 2025 PEA: 11-year mine life, 834,000 oz recovered, AISC $1,140/oz, initial capex C$217M. 2026 winter drill program: 10,000 m.

Nunavut

Committee Bay

Over 235,000 hectares. Three Bluffs deposit: 524,000 oz indicated at 7.85 g/t gold, 720,000 oz inferred at 7.64 g/t gold. 2026 drill program: ~5,000 m.

Quebec

Sakami

14,250 hectares. Initial inferred resource at La Pointe Extension: 23.9 Mt grading 1.07 g/t gold for 825,000 oz. Open in all directions. Heliborne MT survey completed Aug 2026.

Quebec

Éléonore South

Near Dhilmar's Éléonore mine. 27,000 m drilled in 172 holes. Intercepts: 53.25 m of 4.22 g/t gold, 1.0 m of 294 g/t gold. No work planned in 2026.

The numbers

Financial snapshot as of September 30, 2026

Fury reports no mining revenue and funds exploration through equity raises. The latest financing was a C$18.0 million brokered flow-through financing in 2025.

C$5.8M

Cash as of September 30, 2026

C$43.7M

Marketable securities as of September 30, 2026

C$7.8M

Net loss for the three months ended September 30, 2026

190.1M

Common shares outstanding as of September 30, 2026, up from 151.6M at December 31, 2024

Q3 2026 financials from SEC filing.

The last 12 months

Recent drilling and corporate milestones

  1. Nov 2026
    • Eau Claire drilling expands mineralization. Hole 26EC-134 returned seven mineralized intervals over 103 m, including 9.81 g/t gold over 2.99 m; Phase 2 program at 59 holes, 28,075 m.
  2. Nov 2026

    • Committee Bay wide intervals. Hole 26TB158 intersected 3.88 g/t gold over 17.82 m, including 18.78 g/t gold over 3.30 m; all five holes hit Three Bluffs shear zone.
  3. Oct 2026

    • High-grade at Eau Claire. Hole 26EC-131 intersected 14.95 g/t gold over 4.25 m true width, 60 m up-dip from historical hole.
  4. Jul 2026

    • Drilling resumes after wildfire. Exploration resumed at Eau Claire after a precautionary suspension due to a nearby wildfire; no material impact on Phase 2 program.
  5. Jul 2026

    • Committee Bay drilling starts. 2026 drill program commenced with approximately 5,000 m of diamond drilling at Three Bluffs and Antler.
What's next

Company-planned milestones

  1. Coming months

    • Updated Eau Claire resource. The company expects an updated mineral resource estimate for Eau Claire, integral to the ongoing pre-feasibility study.Planned
  2. 2027

    • Eau Claire PFS and resource. The next Eau Claire mineral resource update will be associated with the pre-feasibility study in 2027.Planned
  3. Next two years

    • Eau Claire environmental baselines. Environmental baseline studies will be carried out over the next two years to support a future environmental impact assessment.Planned
Things to know

Key considerations

  • No mineral reserves; resources not demonstrated economic.
  • Wildfire evacuation in July 2026, no material impact.
  • Share count rose from 151.6M to 190.1M in 2026.
  • Ability to raise capital listed as a risk factor.
  • Exploration-stage issuer with no mining revenue.
Leadership

Who runs the company

  • Forrester A. Clark, Chief Executive Officer
  • Phil van Staden, Chief Financial Officer
  • Brian Christie, Chair of the Board

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.