Gensource Potash Corporation

$GSP · TSX-V

Unclaimed AGORACOM Hub

Gensource Potash Corporation

  • CanadaTSXV:GSP
  • United StatesOTC Pink:AGCCF

Gensource Potash Corporation is a fertilizer development company based in Saskatoon, Saskatchewan, that is developing potash production using a modular, selective solution-mining design on Crown mineral lands in south-central Saskatchewan.

Company facts

Exchange
TSX-V
Symbol
GSP
Secondary symbol
AGCCF
Industry
Metals & Minerals

Company overview

TSX-V: GSPPINK: AGCCF

Gensource Potash Corporation

Developing modular potash in Saskatchewan

Developing 500,000 t/a potash project80,000 acres Crown land in SaskatchewanNo final investment decision yet

Gensource Potash Corporation is a fertilizer development company based in Saskatoon, Saskatchewan. It is developing potash production using a modular, selective solution-mining design. Its flagship is the 100%-owned Tugaske Potash Project, planned at 500,000 tonnes per year, and the company is pre-construction with design and engineering funded by an ASEAN partner.

500K t/a
Planned capacity
250K t/a
Original design
324 km2
Land position
C$1.07M
Financing

Developing modular potash in Saskatchewan.

The company

Fertilizer development company based in Saskatoon, Saskatchewan.

Gensource at a glance

  • Developing modular, selective solution-mining potash production.
  • Flagship Tugaske Potash Project planned at 500,000 t/a.
  • Design and engineering funded by an ASEAN partner under exclusivity.

The company is pre-construction, with no final investment decision. It holds over 80,000 acres of Crown mineral lands in south-central Saskatchewan.

The projects

Key assets and production approach.

Projects

Flagship

Tugaske Potash Project

100%-owned potash project being engineered at an up-sized 500,000 t/a. Initial design near completion; 'not a development' decision extended.

Land position

Vanguard Area

Over 80,000 acres (~324 km2) of Crown mineral lands under leases KL244, KL245 and SMP 200, about 360 km north of US border.

Approach

Modular production model

Plans smaller, replicable potash modules of at least 250,000 t/a each, designed with no surface tailings or brine ponds.

The numbers

Key figures from company disclosures.

Figures

Financial and operating figures from the company's latest disclosures.

500K t/a

Planned capacity of the up-sized Tugaske Potash Project, as announced November 16, 2026.

80K acres

Crown mineral land position (approximately 324 square kilometers), as of March 2026.

C$1.07M

Gross proceeds from second tranche of private placement: 7,133,269 listed shares at C$0.15, April 29, 2026.

C$85.08/t

Estimated all-in operating cost for a single 250,000 t module (mining cost C$64.09/t), March 2026.

Figures from company disclosures on the dates indicated.

The last 12 months

Recent milestones

  1. Nov 2026
    • Design nearing completion. Initial design for the up-sized 500,000 t/a project was nearing completion and moving into optimization.
    • Environmental decision extended. The 'not a development' decision for the original 250,000 t/a project was confirmed valid and extended.
  2. Jul 2026

    • Technical Refresh 60% complete. Overall completion approximately 60%, with partner delegation scheduled to visit Tugaske site in mid-July.
  3. Apr 2026

    • Private placement tranche closed. Non-brokered private placement of 7,133,269 listed shares and warrants at C$0.15 for C$1,069,990.35.
  4. Mar 2026

    • Technical Update kicked off. Funded by ASEAN Partner, covering construction and operating cost estimates for minimum 500,000 t/y facility.
  5. Feb 2026

    • Exclusivity agreement executed. Agreement with ASEAN conglomerate for long-term supply and proposed investment structure to fully fund Tugaske.
What's next

Next steps

  1. Planned

    • Complete design and studies. Complete design optimization, feasibility study and NI 43-101 Technical Report.Planned
  2. Planned

    • Negotiate definitive agreements. Negotiate definitive agreements with ASEAN Partner toward a final investment decision and begin first mining cavern early in the new year.Planned
  3. Planned

    • Submit updated proposal. Submit updated Technical Project Proposal to Saskatchewan Ministry of Environment and formalize logistics and offtake agreements.Planned
Things to know

Key considerations

  • Definitive agreements with ASEAN Partner not yet executed; funding at project level.
  • No final investment or construction decision has been made for Tugaske.
  • Gensource is a TSX Venture Tier 2 company.
  • Existing HELM offtake covers original project; up-sized offtake under negotiation.
Leadership

Who runs the company

  • Mike Ferguson, President & CEO
  • Stephen Dyer, Chairman of the Board of Directors

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.