Skip to content
Sign in

Highway 50 Gold Corp.

$HWY · TSX-V

Unclaimed AGORACOM Hub

Highway 50 Gold Corp.

  • CanadaTSXV:HWY

Highway 50 Gold Corp. is a mineral exploration stage company whose exploration work is focused on north-central Nevada, where it is applying a model of deep crustal architecture to the search for Carlin-type gold deposits.

Company facts

Exchange
TSX-V
Symbol
HWY
Industry
Metals & Minerals

Company overview

TSX-V: HWY

Highway 50 Gold Corp.

Searching for Carlin-type gold in Nevada

Drilling at Gold Knob, Nevada.51.82 m @ 0.60 g/t Au discovery.C$2.4M raised in March 2026.

Highway 50 Gold Corp. is a mineral exploration company focused on north-central Nevada, applying a deep crustal architecture model to Carlin-type gold deposits. Its flagship 2026 Phase I drill program at the 100%-owned Gold Knob project produced a discovery intercept in September 2026.

C$2.4M
Raised Mar 2026
5,000 m
Phase I drill
51.82 m
Discovery
205
Claims staked

Focused on the Gold Knob project in Nevada.

The company

Nevada-focused gold explorer

  • Mineral exploration stage company focused on north-central Nevada.
  • Applies deep crustal architecture model to Carlin-type gold deposits.
  • Led by team with 35 years of Nevada exploration experience.

The company's flagship activity is the 2026 Phase I drill program at its 100%-owned Gold Knob project, which produced a discovery intercept in September 2026.

The projects

100% owned, Nevada

Gold Knob

Mineralization in Upper-plate Valmy and Lower-plate Comus rocks, similar to Turquoise Ridge district.

Other projects

Johnson Canyon, Golden Brew, Quito North

Additional Nevada gold projects; Quito North land position expanded in October 2025.

The numbers

C$2.4M

Gross proceeds from upsized non-brokered private placement completed March 13, 2026.

5,000 m

Planned Phase I drill program at Gold Knob: 10 to 15 holes, announced June 18, 2026.

51.82 m

Discovery intercept in hole GK-26-9A grading 0.60 g/t Au, September 14, 2026.

205

Additional claims staked around the Gold Knob discovery area, September 14, 2026.

All figures as reported by the company in 2026 press releases.

The last 12 months

  1. Sep 2026
    • Gold Knob discovery announced. Hole GK-26-9A intersected 51.82 m grading 0.60 g/t Au; 205 claims staked.
  2. Jul 2026

    • Director appointed. Allister Avard joined the board and received options on 100,000 shares at C$0.47.
  3. Jun 2026

    • Drill program began. Company started 5,000 m Phase I drill program at Gold Knob.
  4. Apr 2026

    • Director resignation. Peter Schloo resigned from the board, effective immediately.
  5. Mar 2026

    • Board changes and grants. Brian D. Edgar and Peter Schloo appointed; Edwin Rees resigned; options and RSUs granted.
  6. Mar 2026

    • Private placement closed. Upsized offering raised C$2.4M via 6.035M units at C$0.40 each.
What's next

  1. Ongoing

    • Company says drilling is ongoing at Gold Knob with assays pending for follow-up holes.Planned
  2. Phase I program

    • Program planned to offset known gold mineralization and test interpretation of a major gold system at depth.Planned
Things to know

  • March units: one share + one warrant at C$0.50, four-month hold.
  • Grants: 1.811M options at C$0.47, 1.545M RSUs.
Leadership

Who runs the company

  • Gordon P. Leask, P.Eng. – President, CEO and Director
  • Scott Davis, CPA, CGA – CFO
  • John M. Leask, P.Eng. – Director and Chair of Technical Committee

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.