Skip to content
Sign in

Post

Impact Silver

You’re reading hobbers’s reply in this thread.Jump to it

Prez3.6 rating from 242 members26.4K ptsRate

Announces Record Silver Production and Earnings

April 15, 2009
IMPACT Silver Announces Record Silver Production and Earnings
VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 15, 2009) - IMPACT Silver Corp. ("the Company" or "IMPACT") (TSX VENTURE:IPT) is pleased to announce record silver production of 635,668 ounces, up 82% from 348,949 ounces in 2007. Gross revenues for the fiscal year were $8,907,958, up 23% from $7,250,077 in 2007. These higher revenues were due to increased silver, lead and zinc production which more than offset lower realized prices (net of smelter costs) for silver, lead and zinc. Average mill throughput during the year ended December 31, 2008 was 280 tpd (tonnes per day), up from 274 tpd during 2007. By year end, production was primarily from the high grade mines of Chivo and San Ramon.

At December 31, 2008, metal prices had declined by about 7% for silver, 40% for zinc, and 20% for lead from prices prevailing at the beginning of the year. As a result of the dramatic decline in zinc prices, the Company stopped shipping and began stockpiling its zinc concentrate production at the end of October.

---------------------------------------------------------------------
Year Ended December 31            2008            2007       % Change
---------------------------------------------------------------------
Revenue                    $ 8,907,958      $ 7,250,077            23%
---------------------------------------------------------------------
Mine Operating Earnings    $ 2,187,124      $ 2,070,931             6%
---------------------------------------------------------------------
Net Income                 $   662,100      $   286,727           131%
---------------------------------------------------------------------
Earnings Per Share         $      0.01      $      0.01
---------------------------------------------------------------------

---------------------------------------------------------------------
Cash and Cash Equivalents  $ 5,433,480     $ 10,144,831
---------------------------------------------------------------------
Working Capital            $ 7,281,243     $ 11,349,373
---------------------------------------------------------------------
IMPACT's financial position at December 31, 2008 remained strong with $5.4 million in cash and cash equivalents (December 31, 2007 - $10.1 million) and net working capital of $7.3 million (December 31, 2007 - $11.3 million). The decrease in cash and cash equivalents is primarily due to the Company's investment in exploration expenditures and resource property costs of $5.4 million and property, plant and equipment acquisitions of $1.5 million. These cash outflows were offset by positive cash flows from operations of $1.7 million during 2008 (2007 - $1.8 million). Cash flows from operations before changes in non cash working capital were $2.2 million during 2008 (2007 - $1.9 million).

Production for the three months and year ended December 31:

---------------------------------------------------------------------------
                        Three months ended               Year ended
                   --------------------------------------------------------
                    Dec 31,  Dec 31,             Dec 31,   Dec 31,
                      2008     2007  % Change      2008      2007  % Change
                   --------------------------------------------------------
Total tonnes (t)
 produced           26,343   24,349        +8%  102,426    99,918        +2%
Tonnes produced
 per day               286      265        +8%      280       274        +2%
Silver
 production (oz)   213,876  103,772      +106%  635,668   348,949       +82%
Lead
 production (t)        257      153       +68%      813       601       +35%
Zinc
 production (t)        300      259       +16%    1,053       976        +8%
Revenue per
 production
 tonne sold         $86.03   $86.67        -1%   $89.89    $72.56       +24%
Direct costs
 per tonne
 produced           $56.82   $44.05       +29%   $54.80    $44.15       +24%
---------------------------------------------------------------------------
Early in 2008 the Company made a heavy commitment in accelerating its exploration and development program. This resulted in extensive drill programs at Capire/Aurora as well as the recently announced results at Noche Buena and Carlos Pacheco veins in the Noche Buena Camp. Further drilling was conducted in the la Virgen Valley Camp, home of the high grade El Chivo and San Ramon mines. As a result of the success of these programs the Company anticipates that exploration expenditures for 2009 will be moderated and funds will be focused on new mine development.

The Company intends to further increase throughput at its current Guadalupe mill to ultimately reach its rated capacity of 500 tpd. This involves some additional expenditure for underground equipment, certain equipment replacements and upgrades in the plant and expansion of the tailings dam (now begun). The process of finding, permitting, developing mines and production stopes takes an intensive contribution of resources of manpower, equipment and time.

IMPACT Silver Corp. is a silver focused mining and exploration company operating in Mexico with a producing silver operation at the Royal Mines of Zacualpan, the 200-square-kilometer advanced Mamatla Silver District and a portfolio of projects with a producing mill at Zacatecas.

On behalf of the Directors of IMPACT Silver Corp.,

Frederick W. Davidson, President, CEO

Join the conversation about Impact Silver.

Reply

Replies

  1. It looks like IPT will have to break above 60-61 cents to rise above the downtrend line since July of last year.

    http://stockcharts.com/h-sc/ui?s=ipt...

    We may need to see base metals recover in order to get that tailwind to support the stock and sustain buying. Keep in mind that IPT has been stockpiling zinc cons since the smelter is paying so little for it. If zinc prices recover, and that could happen since China has been an aggressive buyer and stockpiles are in decline, then the extra revenue generated by the zinc concentrate sales may be enough to create a very strong quarter for IPT.

    Lets also keep in mind that IPT is currently mining silver-rich zones but they have lead-zinc rich ore feed that they could run in bulk tonnage very quickly when the prices rebound. The Gallega Mine has some veins of greater than 10m width with higher base metals content. Its lower grade overall but very low cost to mine since so much tonnage can be extracted with minimal dilution or development expense, and its less than 100m from the processing plant. So any improvement in the base metals is going to make the operating results much stronger for IPT. If they can sustain the increased production levels to near capacity at 500tpd, then IPT could easily become a $1 stock again.

    cheers!

    mike

    Personal disclosure: IPT is a paid advertiser on my website and I own shares.

    1. Hi Coach, I hope IPT gets some notice pretty soon. It's really been a gem that keeps on shining no matter what. Glad I have a bit of it and and keep on adding when funds permit, which isn't often nowadays.

      I can't get anything to line up properly when copying/pasting, so the link has the chart, etc.

      --------------

      May 26 2009 - IMPACT Silver Corp. (“IMPACT” TSX.V - IPT) is pleased to announce record quarterly silver production of 229,710 ounces, up 7% from 213,876 ounces in the prior quarter (ending December 31, 2008). Gross revenues for the quarter were $1,457,000 down 34% from $2,221,000 in the prior quarter. Average mill throughput during the quarter was 329 tpd (tonnes per day), up from 286 tpd in the prior quarter. Higher throughput and higher average silver grades allowed IMPACT’s mining operations to be cash flow positive amidst a lower metal price environment.

      http://www.kitco.com/pr/2074/a.....1...

      1. Click the URL to get the numbers in the tables lined up properly.

        ----------------------

        Impact Silver drills five metres of 227.8 g/t Au at Nido

        2009-05-27 18:11 ET - News Release

        Mr. Frederick Davidson reports

        IMPACT ANNOUNCES TWO NEW SILVER DISCOVERIES

        Impact Silver Corp. has recently received assays from two newly discovered silver areas found during continuing exploration in the Royal mines of the Zacualpan silver and gold district of central Mexico.

        The Nido de Oro area is located 4.5 kilometres due west of Impact's Guadalupe processing plant.

        FIRST DRILL HOLE FROM THE NIDO DE ORO AREA (HORQUETA VEIN)

        Drill hole From To Intersection True width Silver Gold Lead Zinc

        (m) (m) (m) (m) (g/t) (g/t) (%) (%)

        Z09-13 85.4 91.6 6.2 5.0 227.8 2.20 1.18 3.71

        Including 85.4 87.9 2.5 2.0 342.9 5.22 1.24 4.08

        This main northeasterly dipping Horqueta vein has been traced on surface for 1.9 kilometres and a series of southwesterly dipping veins, including the Armadillo and Nido de Oro veins, have been found 50 metres to the west. Surface samples from hand trenching of the Horqueta vein over a 550-metre length have returned values up to 639 grams per tonne silver and 0.5 g/t gold over a 0.9-metre width. The Armadillo vein has been mapped and sampled in historical underground workings over a 100-metre strike length and has returned values up to 679 g/t silver and 1.4 g/t gold over a width of 0.5 metre. The Horqueta vein mineralization is open for expansion to the north and additional drill pads have been constructed for further drilling.

        The Las Aguilas area is located 4.2 kilometres southwest of Impact's Guadalupe processing plant. It is host to a series of southwesterly dipping veins that are partially exposed in historical underground workings and in outcrops where rock chip samples returned up to 287 g/t silver and 3.25 g/t gold.

        LAS AGUILAS

        Drill hole From To Intersection True width Silver Gold Lead Zinc

        (m) (m) (m) (m) (g/t) (g/t) (%) (%)

        Z09-07 27.75 30.5 0.75 0.74 239.0 0.06 0.08 0.13

        Z09-07 42.53 45.83 3.30 3.29 236.3 0.08 0.23 0.41

        Z09-07 51.26 51.79 0.53 0.52 2,040.0 0.36 1.42 2.23

        Z09-08 46.00 46.55 0.55 0.54 362.0 0.23 0.14 0.56

        Both of these holes at Las Aguilas were drilled on Section 2050N, with hole Z09-08 undercutting hole Z09-07 by 50 metres. Upon review of the geological cross-sections, is it evident that hole Z09-08 only intersected the first vein and should have been drilled deeper. Phase two drilling is scheduled to test the northern extent of the mineralization where several old workings are located.

        Wojtek Jakubowski, PGeo, and Brian Hall, PGeo, qualified persons under the meaning of Canadian National Instrument 43-101, are responsible for the technical content of this news release.

  2. Good results for Impact with increased production and revenues in a very difficult market. An improvement in commodity prices, mill throughput increasing to 500 tpd., add some gold to the mix and this should all bode well for this efficiently managed company.

    bc