Road v railway

Correct me if I'm wrong, please, but I believe a road would be less cost-effective in view of the tonnage expected to move from the McFaulds area with several mines operating.

4,000 tons per day was one projected production level for the former FWR property alone, to supply a smelter. Now if we add to that at least one other chromite mine, producing to export lump ore to China - then some tonnage from NOT, probably a multi-metal concentrate.

If all of that goes by truck you are going to have an extremely busy road. With the distances involved each truck could not possibly do more than 1 load per day + empty return. Ok maybe running non-stop 24hrs with relays of drivers. What size of truck are they contemplating here - 50 tons? Bigger would need a very substantial road.

Such a road would have to run along the KWG staked route, as we have been told this is the only feasible semi-dry line, requiring less fill to get by the swamps.

Certainly winter roads can carry big tonnage at less cost, but do they intend to stockpile through the summer then?Or is the road temporary until production actully overloads the road?

Thoughts please

Sign in to ask the company to answer this.

Join the conversation about The Canadian Chrome Company Inc.

Reply

Replies

  1. To my (limited) knowledge, only Cliffs has expressed a clear view on the road vs rail problem. From the Cliffs February 2011 'base case' scenario (summary):

    "The 'base case' includes the following major inter-related components:

    • An open pit chromite mine with associated housing and other proposed infrastructure located at the site. The mine may transition to underground mining in 10 to 15 years after mining begins. Further testing and mine planning is required to determine the timing of a transition to underground mining.
    • An ore processing facility to produceconcentrate and associated load-out facility located at the mine site.
    • An integrated transportation system to link all project components. This transportation system will include a permanent all-season road to allow the movement of people, equipment, supplies, lump ore and concentrate to and from the proposed mine site and the existing Ontario rail infrastructure. The evaluation to date has included a comparison of road and rail options within several transportation corridors. The northern extension of Road 643 from Nakina has been identified as a realistic and viable option. Accordingly, an all-weather road in this corridor was included in the 'base case.'
    • A ferrochrome production facility (FPF) utilizing closed electric arc furnaces to manufacture ferrochrome. The availability of a large, reliable, long-term and cost-competitive supply of electricity is a requirement for the FPF. Current estimates of the furnace requirements are approximately 300 MW. The Company has identified only a few places in Northern Ontario where this power requirement can be met. A brownfield site within the City of Greater Sudbury was identified as the 'base case' location for the FPF. Cliffs has plans to continue to meet with other northern municipalities, including Thunder Bay, Greenstone and Timmins, to continue discussing the potential of locating the FPF in their community."

    Understood: "No road!"

    Eager to hear what's the clear view of the government on this topic. In June maybe? The most speculative asset KWG holds at this moment is its Rights of way and claims over the railroad bed! The odds are very high, here. Just imagine a public announcement this summer stating that the federal and Ontario government have finally agreed on a railway to be built ASAP on the KWG staked route! I can foresee Frank Smeenk in the background, behind the two Ministers, showing his widest smile!

    As per Frank Smeenk's own words, KWG litterally invited Cliffs in the Ring of Fire, and have them use their greenies for a 'serve yourself' shares, options and warrants buffet. Frank is now looking back and wonder... Did I shake hands with my hangman...?

    GLTA.

    BaBe.

    1. I think everyone has to take a look at any new rail line installation. Trains do not grow track in the direction of their destination. It is big work and requires access on both sides of the track for compaction, movement of equipment and manpower, etc.

      Whether it is an all season road , or rail or power that claims to get the infrastructure rush started is not really that important. It will all happen, they will all take the route staked by KWG (esker materials for road bed and rail construction) and it will all complete simultaneously.

      I suspect that we will hear of a late fall start and that all utilites are firing all their guns at once. With enough coincident activity and urgency, we may see a four lane into McFaulds just to cover the construction scar and claim minimum enviro footprint.

      Aafab

      1. Interesting that the McCormack valutation (June 2010) applied a 25-40 MM$ value for the RR RoW, "based on on 10% of the potential cost savings from the contemplated route versus an alternative route".

        As for the Broad Oak valuation:


        "The Broad Oak Valuation was of the potential cash flow from the Big Daddy Chromite Deposit and determined that a 30% interest in the indicated and inferred resources presently identified at the Big Daddy deposit, if mined as a pit and sold into export markets as lump ore, has a NPV of between US$140.7 million and US$300.1 million based on a discount rate of 8% at lump ore prices of US$300/tonne and US$350/tonne, with the mid-range of US$325/tonne yielding a US$220 million NPV. The significant cost assumption incorporated in Broad Oak's DCF model is that the entire US$1.7 billion projected cost of construction of a railroad to ship lump ores to export market ports is borne by the mining of only the presently identified and assumed open-pittable resources providing a life-of-mine of 15 years. KWG believes that this railroad will serve a new mining district expected to develop at its northern terminus and thus have a useful life that would permit its cost to be amortized over very many decades. Nevertheless, the Broad Oak Valuation indicates that the Big Daddy interest alone has a net present value, calculated on this basis, of from US$0.17 to US$0.36 per KWG share, with the mid-range yielding US$0.27 per share."

        Is it to say that the Rairoad would had a chance to be made first only if non-open pit BD is developped first???

        GLTA.

        BaBe.

  2. If you want an example of how a nothern road can be built, you need only look to what Quebec did in the early 70s to open up the James Bay Hydro projects. During a period when there were no environmental assessments requried and little obligation to consult on aboriginal issues, they built a 620km road from Matagami to Radisson in only 420 days. It was built to accomodate heavy vehicles up to 500 tons. I have driven that road, and its great. http://www.jamesbayroad.com/index.html

    While the topography may be different on the eastern side of James Bay, it still serves as an example of what can be done when there is the political will. When talking to KWG at PDAC, they argued that their route was the only viable option, and that heavy vehicles needed to truck ore on a season road would destroy it.

    The 'duty to consult' on aboriginal issues is now firmly embedded in law and I would think that their preferences on road vs rail are going to be on the negoatiation table. Is there a consensus yet?

    1. Is it not safe to say for a road or rail plan KWG has the best route? Does KWG's value in staking the esker change because they plan a road vs a rail?

      I would assume because it's the most feasible route, some would argu the only route, that no matter what way the government/cliffs/natives decide to go (rail or road) we are still a takeover target because we own the best possible route for either transportation and not to mention 28% of BD and CC/DDI

      comments welcome

        1. Tha last 2% requires them to spend 2.5mil on BD before the deadline (1 April 2012) which can easily be done with a cheque to Cliffs (fait accompli) based on what PR at KWG has told me.