Skip to content
Sign in

Post

The Canadian Chrome Company Inc.

You’re reading rj’s reply in this thread.Jump to it

Prez3.3 rating from 219 members7.4K ptsRate

Future

Well, if September has been given as a date there is a reason. Perhaps instead of spending cash on exploration of B.H. they intend to pursue development of the patented process, so that it can be shown to be commercially viable. Six months seems a reasonable time for this.

If the necessary tests go as hoped, money should be available from then, while the claims will also be secured. By September we will be getting close to time for next winter's winter roads, and permits for them - good for getting out larger bulk samples.

Being on the smaller exchange will mean less expense while markets generally continue to be 'difficult'.

The whole easement appeal & counter-appeal thing should have played out by that time also. In any case KWG could begin on their pipeline, whether CLF wins or KWG wins doesn't matter for this. If CLF wins, and a new interpretation of the laws that gives any company the right to build infrastructure anywhere they choose is established, that means no permission from other parties (such as CLF) is needed for KWG to build their transport infrastructure - good for the goose, good for the gander, right? If KWG wins, then they have priority over the route by long established law. Subject to environmental assessments and permits etc.

Sign in to ask the company to answer this.

Join the conversation about The Canadian Chrome Company Inc.

Reply

Replies

  1. I don't think the patent process can be shown to be commercially viable until bulk samples can be brought out of the Ring. So they may be forced to wait for the road to be built to finalize that part of the process. Of course, other steps in the patent process can probably happen in the meantime. A bit part of the patent process is waiting for the patent office to study an application. In other words, hurry up and wait.

      1. Great discussion (and very much civil) on KWG leaving the Venture Exchange and much thanks to Grease Monkie for sharing his call from Bruce last night. I seem to recall that way back when it was mentioned they would have to have around 12 or 20 tons to do the proper sampling for KWG's new Patent Process. I could be out in those exact amounts as it was some time ago. Just the fact that our "Insiders" seem to be buying even at these low prices is surely a good sign for the shares and you certainly have to be an Eternal Optimist to stay with KWG while the very long wait to redemption continues. Keep up the lively discussion folks, as we are all learning as we go. rj

        1. Well, a single cargo plane can carry that (several tons). Then again testing of the process might usefully be done on ore from somewhere else. If for example a South African company is interested in using the method the ore could come from there.

          Koper Lake is still frozen and a usable place to land planes, and in summer there is the airstrip used in previous years. Enough for a test will be available somehow. Since the ore lies well below the surface drill cores seem a likely way to get material. How much they have on hand I don't know, and whether they might use material from Big Daddy cores as well as from more recent drilling is another question.

          If the share price goes down I hope I can scrape together cash to buy more, which doesn't look likely at present. Maybe before September at least.

          The way things are shaping up in the ROF generally we have a long wait before things move, but the Patented Process could well begin to bring licence fees or other benefits in a comparatively short time.

  2. http://www.tbnewswatch.com/News/366796/Patent_office_decision_may_help_KWG_to_cut_chromite_production_costs_in_half

    By Jamie Smith, tbnewswatch.com

    THUNDER BAY -- Mining is an expensive industry.

    Just ask KWG Resources, which received good news from the U.S. Patent Office's International Searching Authority earlier this month. The office found that KWG's process for using natural gas and an accelerant, rather than a standard electric arc furnace, to process chromite is a novel one.

    Vice-president of exploration and development Moe Lavigne said the idea could cut costs by more than half for its proposed operation. It could also have the potential to license the process to mines around the world but it hasn't had the chance to get the process out of the lab yet.

    "We haven't tested it on chromites from around the world yet but we suspect that it'll be applicable to any chromite deposit on the planet," he said.

    Typically an electric furnace needs to burn at around 1,700 C in order to separate chromite, made of chromium, iron and oxygen. KWG's process could do the same using natural gas at 1,200 C. That saves energy costs but also equipment costs by burning at a lower temperature.

    "At 1,700 C just about everything melts," Lavigne said.

    The footprint for the plant is also about a quarter of the size of an electric furnace like the one proposed by once KWG senior partner Cliffs Natural Resources. Electricity prices means a typical plant would likely be built in Quebec or Manitoba where prices are cheaper but natural gas is the same price across the country.

    "Natural gas allows us to build the plant anywhere there is natural gas," he said.

    KWG wants to build a pilot plant, possibly near Nakina where its proposed facility would one day also be built, in order to test the idea with between 10 and 100 tonnes of chromite from its Black Horse deposit in the Ring of Fire.

    That's a $20 million test at a time when the stock market isn't interested in mining. Lavigne said companies with good projects are looking to Europe for capital.