Skip to content
Sign in

Liberty Gold Corp.

$LGD · TSX

Unclaimed AGORACOM Hub
L

Liberty Gold Corp.

  • CanadaTSX:LGD
  • United StatesOTCQX:LGDTF

Liberty Gold Corp. is a U.S.-focused gold development company whose 100%-owned flagship asset is the Black Pine oxide gold project in southern Idaho, within the Great Basin.

Company facts

Exchange
TSX
Symbol
LGD
Secondary symbol
LGDTF
Industry
Metals & Minerals

Company overview

TSX: LGDOTCQX: LGDTF

Liberty Gold Corp.

Advancing Black Pine oxide gold project, Idaho

100%-owned Black Pine gold project.2026 feasibility study complete.Permitting and engineering underway.

Liberty Gold Corp. is a U.S.-focused gold development company. Its 100%-owned Black Pine project in southern Idaho is a planned 16-year open-pit, run-of-mine heap-leach operation. The 2026 feasibility study outlines 4.04 Moz of probable reserves and has been followed by detailed engineering and federal/state permitting.

US$28.6M
Cash (Q3 2026)
US$35.3M
Working cap.
US$87.9M
Total assets
4.04 Moz
Prob. reserves

Developing Black Pine oxide gold, Idaho.

The company

A U.S.-focused gold developer.

Developing Black Pine

  • 100%-owned Black Pine project in Idaho.
  • 2026 feasibility study completed.
  • Detailed engineering and permitting underway.

The company is a U.S.-focused gold development company. It completed a feasibility study in 2026 for a 16-year open-pit, run-of-mine heap-leach operation at Black Pine and is advancing detailed engineering and federal/state permitting ahead of a potential construction decision.

The projects

Current and past assets.

Projects

Idaho, USA

Black Pine Gold Project

100%-owned oxide gold project in southern Idaho. 2026 feasibility study outlines a 16-year open-pit, run-of-mine heap-leach operation with probable reserves of 4.04 Moz gold.

2026 drilling

Black Pine Exploration

2026 drilling extended oxide mineralization 200 m x 400 m north at Rangefront; targeting 25-35 Mt of inferred material for upgrade.

Divested

TV Tower

Turkish gold project sold; final staged payment of US$2.6 million received in October 2026.

The numbers

Key financial metrics.

Financial and feasibility numbers

Latest financial position and feasibility economics.

US$28.6M

Cash and cash equivalents at September 30, 2026.

US$411M

Initial capital estimated in the 2026 Black Pine feasibility study.

US$2.4B

After-tax NPV(5%) at US$3,250/oz gold from the feasibility study.

60.5%

After-tax IRR at US$3,250/oz gold from the feasibility study.

Feasibility study figures are at US$3,250/oz gold; cash figure from Q3 2026 report.

The last 12 months

Recent milestones.

The last 12 months

  1. Nov 2026
    • Board appointment. Craig Dudra appointed to board, effective December 1, 2026.
  2. Oct 2026

    • Detailed engineering started. Detailed engineering commenced with M3 Engineering and NewFields, and fabrication capacity secured for long-lead equipment.
  3. Oct 2026

    • Black Pine drill results. Initial 2026 drilling defined a 200 m x 400 m northern extension at Rangefront.
  4. Oct 2026

    • TV Tower payment received. Final staged payment of US$2.6 million received from sale of TV Tower project.
  5. Sep 2026

    • Feasibility study filed. NI 43-101 technical report for the Black Pine feasibility study filed.
  6. Sep 2026

    • Feasibility study announced. Black Pine feasibility study outlined a US$2.4B after-tax NPV(5%) and 60% after-tax IRR at US$3,250/oz gold.
What's next

Company-stated plans.

What's next

  1. Through late 2027

    • Advance toward construction decision. Continue advancing Black Pine toward a potential construction decision through detailed engineering, procurement, financing and execution readiness.Planned
  2. 2028

    • First gold targeted 2028. Company plans first gold in 2028.Planned
  3. Ongoing

    • Resource classification upgrade. Target approximately 25 to 35 million tonnes of inferred material above resource cutoff for resource classification upgrade at Black Pine.Planned
Things to know

Things to know

  • Feasibility study does not replace Mine Plan of Operations for permitting.
  • Company provides NI 43-101 disclosure, not SEC Regulation S-K Subpart 1300.
  • Initial capex US$411.4M vs. cash US$28.6M at Sept 30, 2026.
  • Federal/state permitting under FAST-41; MPO deemed administratively complete Nov 2025.
Leadership

Who runs the company

  • Jonathan Gilligan, President, CEO & Director
  • Joanna Bailey, CFO & Corporate Secretary
  • Greg Etter, Non-Executive Independent Chairman

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.