Liberty Issues Clarifications

EDMONTON, ALBERTA--(Marketwire - Oct. 14, 2008) - As a result of reviews by the Alberta and British Columbia Securities Commissions, Liberty Mines Inc. (TSX:LBE) ("Liberty" or the "Company") is issuing the following news release to clarify its disclosure.

Drilling required for a mineral reserve estimate and an updated mineral resource estimate for the Redstone mine has been ongoing since the winter of 2006 until April 2008. As stated in press releases dated from September 7, 2006 to May 10, 2007, Liberty intended to have enough drilling completed by that time to produce a technical report stating a mineral reserve. All drill results were not available when the mineral resource technical report was being prepared in June 2007. Further drill results were reported in the October 10, 2007 and January 29, 2008 press releases and drilling continued until April 2008. Liberty has undertaken to have a NI 43-101 compliant technical report for the Redstone mine completed in approximately six months which will include a reserve estimate based on completed drilling and an updated resource estimate.

The Company has not yet attained the status of a producing issuer defined in NI 43-101 as an issuer which has gross revenues of at least $30 million from the most recently completed fiscal year, and at least $90 million gross revenue in the aggregate over the last three fiscal years, as disclosed in the annual audited financial statements. Independent Qualified Persons are therefore required to construct the Company's technical reports until that status is attained. Part of the McWatters feasibility study was written by a Qualified Person who was an employee of the Company. To remedy this situation, Liberty has undertaken to have an updated technical report for the McWatters mine reviewed by independent Qualified Persons completed in approximately six months.

The 2006 annual presentation contained a slide which stated a potential resource at the Redstone mine of 2 million tonnes or more grading 2.3% Ni based on additional mineralization that was suggested by the geophysics performed by Inco known as the "Inco anomaly". Drilling to date has verified that a significant part of the anomaly is nickel bearing. The technical report of January 30, 2006 by G.A. Harron for Starfire Minerals Inc. stated an historical inferred resource of 1,709,000 tonnes grading 2.44% Ni for the Redstone mine as declared in the Timmins Nickel 1991 annual report. From the dimensions of the Inco anomaly, the potential mineralized zone was extrapolated to a range of 1.7 million to 2 million tonnes or more. The key assumptions, parameters and methods used to estimate the historical mineral resource of 1.7 million tonnes are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI 43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon.

At the June 2008 annual meeting, an updated model was used which included the mineralized zone only in the basic Redstone channel with no additional allowance relative to the Inco anomaly and no allowance for a resource below the 508m level to the 700m level; drilling had not been completed at the time for that section of the mine and to date still remains to be done. Hence an estimate of 1 million tonnes was stated and the full qualifying language as above should have been reported.

The resource estimate for the Redstone mine was released in the August 23, 2007 technical report based on drilling to the 508m level which stated a measured resource of 274,000 tonnes grading 2.64% nickel and an indicated resource of 145,000 tonnes grading 1.70% nickel. Approximately 77,000 tonnes of the resource have been depleted by mining since August 23, 2007, mostly from the measured part of the resource.

The 2007 Annual Information Form ("AIF") contained an estimate of the mine life of the Redstone mine after a shaft is completed to the 1120m level. That statement was unsupported by a technical report containing a study of the mine reserves and production rate and should not have been included in the AIF.

In the February 23, 2007 news release an historical "reserve" was incorrectly disclosed. The historical resource was stated in the Qualifying Report for the Redstone mine by G.A. Harron on October 15, 2003 as an indicated resource of 49,400 tonnes grading 3.90% Ni (undiluted) over an average width of 1.4m above the 229m level, and inferred resources in the 229 to 335m interval were calculated to be 104,150 tonnes grading 4.19% Ni (undiluted). An economic study and a plan to mine the resource were not completed to reclassify the resource estimate as a reserve.

References to historical resources at the Groves, Sothman and Langmuir 2 projects have been mentioned in previous news releases and on the Liberty website. The disclosures did not meet all requirements under NI 43-101 disclosure for historical resources, and are restated as follows:

The Groves deposit contains an historical mineral resource of 500,000 tons (Canadian Mines Handbook, 1957) of 1.5% combined copper ("Cu") plus nickel ("Ni") above the 45.7m level in two separate zones. The Ni/Cu ratio was reported to be approximately 0.94 which gives an estimate of 0.77% Cu and 0.73% Ni in the resource. The resource category of the historical estimate was not identified and no comparison of the estimate can therefore be made to the accepted categories. The key assumptions, parameters and methods used to estimate the mineral resource are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon;

The Sothman deposit contains an historical mineral resource of 350,000 tons grading 0.89% Ni (0.5% Ni cut-off) or 190,000 tons at 1.24% Ni (1% Ni cut-off) (Falconbridge Nickel 1971). The resource category of the historical estimate was not identified and no comparison of the estimate can therefore be made to the accepted categories. The key assumptions, parameters and methods used to estimate the mineral resource are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon.

The Langmuir 2 main deposit contains an historical mineral inferred resource of 255,000 tons grading 1.20% Ni (G.A Harron qualifying report for Starfire Minerals Inc. January 30, 2006). The key assumptions, parameters and methods used to estimate the mineral resource are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon.

This news release was prepared by Dr. Gary Nash PhD (Physics), the President, Chief Executive Officer and a Director of the Company, and Mr. William Randall MSc (Geology) Vice President of Exploration. Mr. Randall is acting as the Qualified Person as defined under NI 43-101.

About Liberty Mines Inc.

Liberty Mines Inc. is a producer of nickel and is focused on the exploration, development and production of nickel, copper, cobalt and platinum group metals from its properties in Ontario, Canada.

Join the conversation about Liberty Mines Inc.

Reply

Replies

  1. Does anyone have an idea why this "clarification" would be issued by Liberty at this time, both on Marketwire and on Sedar at the same time? Is there any significance to the release other than as a clarification?



    Bill

    1. here's an answer

      "EDMONTON, ALBERTA--(Marketwire - Oct. 14, 2008) - As a result of reviews by the Alberta and British Columbia Securities Commissions, Liberty Mines Inc. (TSX:LBE) ("Liberty" or the "Company") is issuing the following news release to clarify its disclosure."

      1. ..waiting for a return call from the Red stone,.from the release, it says we did not qualify as a producing CO because we haven't met the $ 30 m threshold according to 43-101.The Red stone also used forward information to complete 43-101 reports with out numbers to back up their totals.The numbers look good if we can prove them up, but in the mean time we are unsure,Traps7

        1. I just talked to Gary. Someone or something raised some questions about our company. The most important question was based on our production status. Although William Randall is qualified to do a Ni43-101 we had not had enough production to generate an inhouse technical report. To remedy the problem "Liberty has undertaken to have an updated technical report for the McWatters mine reviewed by independent Qualified Persons completed in approximately six months."

          This release has nothing to do with our financing. That we should find out about by the end of the week.

          I'm holding onto our shares. Why, because Lbe is a good company and I believe we will get the financing to advance McWatters.

          1. for better or worse i'm hanging in there with yah wanderer. maybe we'll end up having a good cry over this and maybe not..................................

              1. Replying to @Wanderer5

                I have a couple questions.

                1) Isn't this NR essentially answering what may seem as "redflags" to any investor looking over the company and doing a little DD on their own?

                2) Why does this come out now in the week that I expected there was goiong to be a financing closing?

                3) Is it possible that some of the folks buying into this latest financing asked questions?

                1. Replying to @whaler

                  I hope that anyone looking at those redflags really look into the questions for their own sakes. Investment decisions are based on each person's dd. My decision is my own. Yours is yours.

              2. Replying to @Wanderer5

                I just read the release this morning and it seems that someone has likely asked these questions which are being clarified.

                Does this essentially become a "to-do" list for LBE? 6 months to do?

                If these are issues asked by the potential financiers, might there be some "subject to's" or "conditionals" wrt the financing closing?

                "Liberty Mines announced on Sept. 29 that it had arranged up to $32 million in financing, comprised to senior secured notes and share purchase warrants. One of the conditions of the financing was receipt of all regulatory approvals."

                Here's an article out an hour ago on the matter, from which the paragraph above is taken.

                "Liberty Mines Says Previously Announced Resource Estimates Have To Be Redone"

                http://www.resourceinvestor.com/pebb...



                October 14, 2008 - 5:49 PM EDT


                EDMONTON, ALBERTA--(Marketwire - Oct. 14, 2008) - As a result of reviews by the Alberta and British Columbia Securities Commissions, Liberty Mines Inc. (TSX:LBE) ("Liberty" or the "Company") is issuing the following news release to clarify its disclosure.

                Drilling required for a mineral reserve estimate and an updated mineral resource estimate for the Redstone mine has been ongoing since the winter of 2006 until April 2008. As stated in press releases dated from September 7, 2006 to May 10, 2007, Liberty intended to have enough drilling completed by that time to produce a technical report stating a mineral reserve. All drill results were not available when the mineral resource technical report was being prepared in June 2007. Further drill results were reported in the October 10, 2007 and January 29, 2008 press releases and drilling continued until April 2008. Liberty has undertaken to have a NI 43-101 compliant technical report for the Redstone mine completed in approximately six months which will include a reserve estimate based on completed drilling and an updated resource estimate.

                The Company has not yet attained the status of a producing issuer defined in NI 43-101 as an issuer which has gross revenues of at least $30 million from the most recently completed fiscal year, and at least $90 million gross revenue in the aggregate over the last three fiscal years, as disclosed in the annual audited financial statements. Independent Qualified Persons are therefore required to construct the Company's technical reports until that status is attained. Part of the McWatters feasibility study was written by a Qualified Person who was an employee of the Company. To remedy this situation, Liberty has undertaken to have an updated technical report for the McWatters mine reviewed by independent Qualified Persons completed in approximately six months.

                The 2006 annual presentation contained a slide which stated a potential resource at the Redstone mine of 2 million tonnes or more grading 2.3% Ni based on additional mineralization that was suggested by the geophysics performed by Inco known as the "Inco anomaly". Drilling to date has verified that a significant part of the anomaly is nickel bearing. The technical report of January 30, 2006 by G.A. Harron for Starfire Minerals Inc. stated an historical inferred resource of 1,709,000 tonnes grading 2.44% Ni for the Redstone mine as declared in the Timmins Nickel 1991 annual report. From the dimensions of the Inco anomaly, the potential mineralized zone was extrapolated to a range of 1.7 million to 2 million tonnes or more. The key assumptions, parameters and methods used to estimate the historical mineral resource of 1.7 million tonnes are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI 43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon.

                At the June 2008 annual meeting, an updated model was used which included the mineralized zone only in the basic Redstone channel with no additional allowance relative to the Inco anomaly and no allowance for a resource below the 508m level to the 700m level; drilling had not been completed at the time for that section of the mine and to date still remains to be done. Hence an estimate of 1 million tonnes was stated and the full qualifying language as above should have been reported.

                The resource estimate for the Redstone mine was released in the August 23, 2007 technical report based on drilling to the 508m level which stated a measured resource of 274,000 tonnes grading 2.64% nickel and an indicated resource of 145,000 tonnes grading 1.70% nickel. Approximately 77,000 tonnes of the resource have been depleted by mining since August 23, 2007, mostly from the measured part of the resource.

                The 2007 Annual Information Form ("AIF") contained an estimate of the mine life of the Redstone mine after a shaft is completed to the 1120m level. That statement was unsupported by a technical report containing a study of the mine reserves and production rate and should not have been included in the AIF.

                In the February 23, 2007 news release an historical "reserve" was incorrectly disclosed. The historical resource was stated in the Qualifying Report for the Redstone mine by G.A. Harron on October 15, 2003 as an indicated resource of 49,400 tonnes grading 3.90% Ni (undiluted) over an average width of 1.4m above the 229m level, and inferred resources in the 229 to 335m interval were calculated to be 104,150 tonnes grading 4.19% Ni (undiluted). An economic study and a plan to mine the resource were not completed to reclassify the resource estimate as a reserve.

                References to historical resources at the Groves, Sothman and Langmuir 2 projects have been mentioned in previous news releases and on the Liberty website. The disclosures did not meet all requirements under NI 43-101 disclosure for historical resources, and are restated as follows:

                The Groves deposit contains an historical mineral resource of 500,000 tons (Canadian Mines Handbook, 1957) of 1.5% combined copper ("Cu") plus nickel ("Ni") above the 45.7m level in two separate zones. The Ni/Cu ratio was reported to be approximately 0.94 which gives an estimate of 0.77% Cu and 0.73% Ni in the resource. The resource category of the historical estimate was not identified and no comparison of the estimate can therefore be made to the accepted categories. The key assumptions, parameters and methods used to estimate the mineral resource are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon;

                The Sothman deposit contains an historical mineral resource of 350,000 tons grading 0.89% Ni (0.5% Ni cut-off) or 190,000 tons at 1.24% Ni (1% Ni cut-off) (Falconbridge Nickel 1971). The resource category of the historical estimate was not identified and no comparison of the estimate can therefore be made to the accepted categories. The key assumptions, parameters and methods used to estimate the mineral resource are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon.

                The Langmuir 2 main deposit contains an historical mineral inferred resource of 255,000 tons grading 1.20% Ni (G.A Harron qualifying report for Starfire Minerals Inc. January 30, 2006). The key assumptions, parameters and methods used to estimate the mineral resource are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon.

                This news release was prepared by Dr. Gary Nash PhD (Physics), the President, Chief Executive Officer and a Director of the Company, and Mr. William Randall MSc (Geology) Vice President of Exploration. Mr. Randall is acting as the Qualified Person as defined under NI 43-101.

                About Liberty Mines Inc.

                Liberty Mines Inc. is a producer of nickel and is focused on the exploration, development and production of nickel, copper, cobalt and platinum group metals from its properties in Ontario, Canada.

                CAUTIONARY STATEMENT

                No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This News Release includes certain "forward looking statements". All statements other than statements of historical fact in this release, including without limitation, statements regarding potential mineralization and reserves, exploration results, and future plans and objectives of Liberty, are forward looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Liberty's expectations are exploration risks, commodity prices, assumed startup and operating costs detailed herein and from time to time in the filings made by Liberty with securities regulators.


                FOR FURTHER INFORMATION PLEASE CONTACT:

                Liberty Mines Inc.
                Dr. Gary Nash, PhD (Physics)
                President & CEO
                (416) 238-9736
                (780) 437-7898 (FAX)
                Email: [email protected]

                1. Replying to @whaler

                  ...timing is never good for a negative news release, but if were going to come clean , then it might as well be at the bottom. My self just stepping into Liberty, feel confident that what i read on sedar to support the drill core is how i make my judgements. DR. Nash knows how to pinch every penny twice and has already shown his leadership, with the amount of ore Liberty controls , will defiantly support a higher share price. Traps7

                  1. Replying to @traps7

                    I agree with you Traps. McWatters will continue on and in 6 mths time we will see a new 3rd party technical report. This will not affect our financing.

                2. Replying to @whaler

                  Whaler, from that story, I am more concerned about the final 2 paragraphs:

                  "Liberty Mines announced on Sept. 29 that it had arranged up to $32 million in financing, comprised to senior secured notes and share purchase warrants. One of the conditions of the financing was receipt of all regulatory approvals.

                  The offering had been scheduled to close by Oct. 15."

                  This situation is troubling, and has to undermine confidence in the company and management. I don't like it, even if the result of the study 6 months from now confirms previous figures, we have 6 months now of people being unsure of what is in the ground, and at least 6 months of uncertainty of what LBE announces is true or not.

                  Adding this on to the economic climate we are in and the low Ni prices is very scary.

                  I will be holding my breath until the 15th to see if this financing goes through or not.

                  Fingers crossed,

                  Bluenoser

                  1. Replying to @bluenoser

                    Given the clarifying news release, I am surprised that the volume was only 64k. That is good, we didn't see a panic sell. I think people are not concerned that it will affect financing.

                    If we close this financing, we have the cash to get to full production and I will be no more concerned than I was yesterday. But if we don't....

                    So far, this clarification only represents a need to clean up some sloppy business, and there is nothing in there to suggest that the drill results or anything else are not true.

                    I am hoping that this clarification was sent out as a prerequisite for the financing being approved, and we will follow up with an announcement on the financing very shortly.

                    Fingers crossed,

                    Bluenoser

                    1. Replying to @bluenoser

                      ...drill results are usually not salted, as was the case with BREX. Reports, such as a ni 43=101 are carried out by most companies own qualified geologist and a third party will verify the numbers and do a site visit. Liberty may have been relying on older ni-43-101 reports that were out dated, but the ore still sits there. Timing could be on our side, as in 6 months we will have nearing 1500 tons a day with a new 43-101 and 6 months of new drill core to announce. ,,ps.Bluenoser,. shipping any Lobster this way,, please,. Traps7

                      1. Replying to @traps7

                        Traps,

                        As a result of reviews by the Alberta and British Columbia Securities Commissions, Liberty Mines Inc. report there is a phrase below you should read before accepting any targets or speculating on timelines.

                        "The key assumptions, parameters and methods used to estimate the historical mineral resource of 1.7 million tonnes are unknown. The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI 43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon."

                        At this point all targets and forecast must be viewed thru the lense of this report.

                        Wolfie

                        1. Replying to @wolfie

                          Wolfie.....yes, we are left in limbo, and things could get ugly here pretty fast if the financing does not come through, add to that, this negative release at a time the sky is falling is what presents buying opportunities. One, has to realize that at this time Liberty is a crap shoot, but, if one has a two yr time frame and deep pockets , then the risk reward could be worth it.. one mans opinion. Traps7

                3. Replying to @whaler

                  "The Company has not yet attained the status of a producing issuer defined in NI 43-101 as an issuer which has gross revenues of at least $30 million from the most recently completed fiscal year, and at least $90 million gross revenue in the aggregate over the last three fiscal years, as disclosed in the annual audited financial statements. Independent Qualified Persons are therefore required to construct the Company's technical reports until that status is attained. Part of the McWatters feasibility study was written by a Qualified Person who was an employee of the Company. To remedy this situation, Liberty has undertaken to have an updated technical report for the McWatters mine reviewed by independent Qualified Persons completed in approximately six months."

                  So how does or will this delay affect what was the proposed working schedule for the McWatters Mine? Is the feasiblity study any less after today's clarification of facts? The link below is the recent update.

                  http://app.quotemedia.com/quotetools...

                  Particularly,

                  "EDMONTON, ALBERTA--(Marketwire - Sept. 15, 2008) - Liberty Mines Inc. ("Liberty or the Corporation") (TSX:LBE) is pleased to announce that pre-production has commenced at the McWatters nickel mine from the 65m level. Development of the sills from the upper levels at 65m and 100m while the ramp is continued to the 130m level will provide 200-600 tonnes per day ("t/d") of pre-production ore with an average of 400 t/d during the fourth quarter ("Q4") of 2008. Production from the mine will increase up to 1400 t/d in Q1 2009. By early Q2 2009, production may be increased to 1600-1700 t/d as the ore body can be mined at a higher production rate using long hole stoping. Ore will be concentrated at Liberty's Redstone nickel concentrator, located 9.5 km west at the Redstone Mine site.

                  Blue, I have to agree with you on the fact that for this to be NI 43-101 compliant there are regulations and guides in place. These same strict requirements are what makes the operations and resources compliant so that the outside world/investment/institutional types can relate and go ahead as it meets a requirement one understands in the mining and investing world. It ends up being a pre-requisite as you know.

                  The crappy part is that there are many paragraphs in the clarification and each deals with something different in or about the operation, but most end with the same sentance regarding non-compliance to a NI 43-101 definition or verify classifications etc

                  Here's one example:

                  "The Company has not yet completed the work necessary to verify the classification of the resource and is not treating the resource figure as an NI43-101 defined resource verified by a Qualified Person at this time and therefore the resource figure should not be relied upon."

                  Does this put the brakes on the financing? Is the compliance issue an issue with the financing succeeding or going through? We do know that regulatory approval was "one of" the hurdles.

                  I would guess it's something for the money people to review and digest?

                  1. Replying to @whaler

                    Whaler,

                    That is the question. Does this put the brakes on the financing?

                    I don't know the answer, but if it does, it puts a lot of brakes on a lot of things.

                    As the financing was supposed to be complete on the 15th, I am nervous that we have not heard anything yet, and I will get more and more nervous as time goes on. And so will a lot of other people.

                    I hope and pray that we see an announcement tomorrow that the financing is in place.

                    Cheers,

                    Bluenoser

  2. ..just curious if anyone here heard of the nickel content of the INCO anomaly..

    The prospective 250mx450m anomaly discovered by INCO in late 2003 from a

    down-hole geophysical study of borehole 89-5 at the 4000 foot (1219m) level will

    then be drilled. “Many investors and analysts have been patiently waiting for us

    to drill the anomaly”, said Liberty’s President, Gary Nash. “A nice hit down there

    could add significant tonnage to the mine” he added.

  3. Interesting press release. Our PR26-08 re the financing para 4

    "The offering is scheduled to close by Oct 15, 2008 and is subject to certain conditions including, but not limited to, receipt of all required regulatory approvals."

    I just wonder if the marketwire is related to the regulatory approvals that would be needed to be worked on.

    Our closing price could e related to para 2 - the exercise price of $0.20.