Hey folks..........
Wishing you all a healthy and happy New Year. Hopefully better times ahead for all.
Whaler
Join the conversation about Liberty Mines Inc.
ReplyYou’re reading traps7’s reply in this thread.Jump to it
Wishing you all a healthy and happy New Year. Hopefully better times ahead for all.
Whaler
Join the conversation about Liberty Mines Inc.
ReplyI thought it was interesting that the focus of the information provided in the last news release was on cash flow rather than net earnings.Which was wise, as this is obviously the most important perspective at the present time with regards to Liberty’s immediate survival. Some individuals (SH) still seem to think that it’s unlikely J.J. will be repaid (wrong!).
The other thing that surprised me was the reported increase in tonnage to 872,000 @ 0.70% and the 2 year LoM.On the day of the release I quickly created the following little spreadsheet extrapolating the information in the release and doing some speculation.
The rest of my post is on SH, I gave up on trying to post tabular data here.
I wish everyone a happy and prosperous New Year!!!!
Bob
Buba Bob
I read your post on SH. Did you read Table 24 on page 86 of the Ni43-101? It shows the Economics of each Cut. The Left column is the Cut Name and Level, The Central partition refers to the economics, and finally the third part is reference the amount of Mineral Reserve and the grade. The Stope Net Revenue is Pre tax cash flow I believe but the report also states that there is no expectation of us having to pay tax because of our writedown last year.
If you xrefer to page 97 the LOM Production Schedule - you will see when each cut is planned for.
In your calculations, you have used the Indicated and Inferred resources from the Massive zone but have totally written off the 665,308 Tonnes of 0.72 % Ni from the disseminated zone.
The Production Rate is as detailed on p 86 17.4.9
If you reread Table 24 - 204,697Tonnes of Ni is contained in the Pit. Cross refer to page 66 Table 19. These resources were all screened as per $7 ni. Read the last paragraph - all resources had to comply with these cut - off requirements. If they were not compliant they were rejected from the resource. Again - read pages 79 - 80 Mineral Reserve Estimate - Methodology.
"Economics were applied to each stope's mineable material based on the NSR formula (Ni price and exchange rate), and mine operating costs including mining, milling, site administration and surface haulage to Redstone mill. Any stope that had a negative margin was deemed uneconomic and excluded from reserves: Page 81 reflects Net Smelter Return.
For these reasons I think some of your assumptions are wrong. Sincerely Wanderer.
Time again to top up your TFSA. O ne can either add $ 5000. of new money or transfer upto $ 5000. of equity of stock from your accounts. Money from a RRSP SD will be subject to the normal tax and shares are transfered at the days price, taking the high or low of that day. Money that was with drawen in 2009 can be added to this $ 5000. in 2010. Traps7
If you look at Table 22 you will see that they used different cut off grades for each zone
(Pit 0.25%, SLC/BH 0.54%, CF 0.63%)
As you can see; they are targeting the higher grade (1.91%) Cut and Fill lower zone first from 2009 Q4 to 2010 Q4.
The middle zone and grade (0.68%) SubLevel Caving/Blast Hole will be mined over the 2yr LoM and the open Pit zone (0.33%) will be exploited from March-October 2010.
In my previous post I used an average for the cost per tonne of $62.00 and a Net Smelter percentage of 72.6. The estimated cost for the open pit is $25.61 and $56.96 for the SubLevel Caving, this along with a calculated SRK Net Smelter percentage of 81.04% makes mining the lower grades economical. One thing I should point out is that I'm questioning SRK's calculation of Xstrata's Ni and Cu participation and MgO Penalty calculations. If anyone could valid their numbers in table 22 and fill me in, I would very much appreciated it, thanks.
The other major point; if metal prices remain at the current level we will generate 10.5M $Can in cash flow by the end of June 30, 2010. Which should be adequate to repay the J.J. loan due July 2010.
At the bottom of the spreadsheet the tpd (tonnes/day) indicate that there will be plenty of milling capacity to handle as much of Redstone's ore as they can bring to surface for the next six months. This could easily generate an equal amount of revenue @ 250tpd of 2.2% ore without having to use the third ball mill until Q3 2010.
So my concerns about the Hart project timelines are lessened, although I still hope that they are not complacent and make sure that all permits are obtained promptly.
Enjoy.
Sincerely
BubaBob
..nice to see our ni-43-101 get torn apart as there are so many ways under tax law, business , mining and not forgetting politices. I see we can operate tax free for a while and play with percentages all in while we count on Xstrata to confirm our numbers through smelting. I like the fact we are considering a gravity circuit to capture our platinum,paladium etc of PMs. I see we have near 3 gr in some areas and this could drop our cost / lb consideraly. I hope Management makes this a priority even if extra capital is required as pay back could come quickly. I would like management to take some risk and gamble our perspective cash flow and extend the Mc..drilling along with Mill upgrades and do some high grading. ..just one mans opinion. with out prejudice . Feng Shui East West, Traps7