VEEP3.1 rating from 17 members783 ptsRate

Any thoughts?

I don’t normally post on this forum, but seeing as we are neighbors I would like to get your opinions of a note I found on SH. Basically it says about 40% of the Redstone calculation is “inferred” and does not demonstrate economic viability. This did come as a bit of a shock as I allways thought Redstone was a real good property. I did verify this information from the Redstone pre-feasibility report of January 11, 2010. Any thoughts or comments because I am considering buying but this makes me cautious.

Cheers EBF

Join the conversation about Liberty Mines Inc.

Reply

Replies

  1. EBF Whaler provided us with a very interesting shortcut:

    http://www.osc.gov.on.ca/en/SecuritiesLaw_rule_20051223_43-101_mineral-projects.jsp

    If you read Page 3 Part 2 you will find the requirements applicable to all disclosure. It is very interesting reading and you will find reference to the disclosure statements. . You may even find some statements re your own ISM investment. Obviously though you need to do your own dd.

    From our Technical report the scope of the report are as follows: As per page ii "During May 2009, Liberty commissioned SRD Consulting (Canada) Inc. ("SRK") to prepare a fully updated National Instrument 43-101 Technical Report including resource and reserve estimates for the Redstone project. Liberty is currently producing ore from the Redstone mine and processing it at their on-site nickel concentrator. This Independent Technical Report describes the current status of all aspects of the project and presents the Life-of Mine Plan."

    I recommend you do your own DD and make your own choice accordingly.

    1. Table ii.Redstone Mineral Reserve Statement, SRK Consulting Dec 31, 2009 (p. V)

      Classification

      Zone

      Quantity

      Tonnage

      Grade

      Contained Metal

      Ni%

      (tonnes)

      (lbs)

      Proven

      Above 1600L

      57,100

      1.37

      780

      1,719,000

      Proven

      Below 1600L

      5,800

      1.21

      70

      154,000

      Proven

      Sub Total

      62,900

      1.35

      850

      1,873,000

      Probable

      Above 1600L

      54,200

      0.70

      379

      836,000

      Probable

      Below 1600L

      142,800

      1.04

      1,483

      3,269,000

      Probable

      Sub Total

      197,000

      0.95

      1,862

      4,105,000

      Proven/Probable

      Total

      1.04

      2,712

      5,978,000

      Note last row has to be adjusted. (Tables don't convert too well)

      Project Economics (p 5)

      The mine plan was incorporated into a financial model to determine the Life of Mine (“LOM”) economics at the study nickel price of US$7.00 per pound.

      LoM NSR revenue based on plant feed of 259.9kt at 1.04% Ni is estimated at $29.8 million.LoM costs are estimated at $18.5 million for operating and $8.4 million for capital.Undescounted pre-tax LoM cash flow is estimated at $2.9 million, yielding an IRR of 116 percent and an NPV of $2.3 million at an 8 percent discount rate.

      The project economics are most sensitive to fluctuations in exchange rate between the Canadian and US dollars.

      Methodology (p 107)

      Economic viability was checked for mineable material based on the NSR formula (Ni price and exchange rate), and estimated site operating costs;

      A Lof M development and production schedule was generated for potentially economic stopes.An economic evaluation was performed on the entire schedule.The material in the LoM schedule includes proven and probable reserves.The mineral reserves exclude inferred mineral resources.

      +++++++++++++++++++++

      Aside:Sounds like economics has been applied to the whole reportand all our Mineral Reserve Statement.stimation Methodology

      1. Total planned mine production from Redstone is 259,900 tonnes at 1.04% Ni mined at an average production rate of 500 tonnes per day, five days per week from Jan 2010 through February 2012. (p 113)

        "Liberty drilled 688 drill holes from surface and underground to an average drill length of 82 metres. The underground drilling was fanned in multiple orientations and angles from four underground collar positions. These holes targeted massive sulphide intersections below historical and current workings, typically achieving drill intercepts within the range 250-800 metres below surface. The deepest Liberty hole from surface achieved a drill depth of 1,350 metres below surface. It is evident in Figure 16 (p50) that drilling at Redstone becomes sparse with depth. Drilling during 2007-2008 achieved intercepts in the depth range of 900 to 1,200 metres below surface, which addressed a gap in the historical database. It is the opinion of SRK that the drilling strategy and pattern have produced an adequate drill density to construct resource models for this style of mineralization."(p49)

      2. ...although Liberty could use their partners smelter back East, i guess we will see no interruption with our mine plan as we continue using Xstrata for smelting. I guess having two 43-101 favourable reports and a third in the works LBE has jumped over alot of hurdles and will continue to increase production. Looking around Liberty"s land claims i see the Hart ,Groves and McAra adding decades to this mining plan and supporting their producing infrastucture. Traps7

          1. .i also am cheering for a settlement. I guess inreguards for LBE to continue shipping to Xstrata we save transportation cost and our 43-101 mining plan continues as reported.. Traps7

            1. Replying to @traps7

              ..talk to a friend last wk and he mentioned he observed the huge trucks hauling ore from the McWaters over to the Red Stone mine. I see our new director has an impressive list of mining expierence along with DR. Nash i feel confident LBE will become cash flow positive ..Traps7

              1. Replying to @traps7

                Good news to hear that trucks are hauling ore. Did you notice on the company web site under Hart proj that Hart is now showing that it is open at depth and mineralization has been found at 550m. Resource calculation was to 460m.

                1. Replying to @Wanderer5

                  Wanderer5, nice to see the up-date on the Hart project. I see these wide mining wds will allow long hole drilling and the ore body open in all directions. I guess this project will supply the mill with rich feed once production starts..Traps7

                  1. Replying to @traps7

                    Traps when you say wds - do you mean widths? Its nice to see mineralization where they thought the dyke was. We will find out more when they drill more. It would be nice to add mineralization to the resource.

                    I found it interesting about the monorail system for Redstone. I would think it would be rare to find an approx $3 million system for a mine that would be done in 2012. They must be certain there is much more to our mine then what this 43-101 can talk about.

                    The monorail system has not been ordered yet so it is not a given. As you get deeper in a mine - what are the day to day temperatures like? If it is -20degrees C what would it be like inside? Conversely if it is a balmy 20 degrees C outside what would a mine temperature be like at say 600 m or 1000m?

                    1. Replying to @Wanderer5

                      Wanderer,

                      The temperature underground stays pretty moderate and gets a bit warmer with depth. There is a lot of ventilation pumped in so the temp is not as affected by the warmth of the ground as you might expect. On the other hand, I have been to quite a quite warm area at the 6300 foot level where ventilation wasn't as good, but it is not hot.

                      In the hot summer, it is actually kind of cool down there.

                      In hard rock mining, 600m and 1000m are really that deep.

                      Cheers,

                      Bluenoser

                  2. Replying to @traps7

                    Examination of previous programs on the McWatters Property revealed further information

                    than previously announced with respect to the results of vertical drill hole M-02-01 (press release:

                    April 25, 2002). Every second assay was reported when it was indicated that 160.6 feet assayed 0.11

                    g/t platinum, 0.42 g/t Palladium and 1.7% Nickel.

                    These above assays do not reflect the complete

                    mineralized section of 312 feet. The weighted average assay over a mineralized core length of

                    312 feet (138.6 feet to 450.6 feet) was: 0.11g/t platinum, 0.28 g/t palladium and 1.43% nickel.

                    Anomalous values of copper and cobalt were also located.

                    Also, within the hole a new zone of

                    1. Replying to @traps7

                      ...i guess once our gravity circuit is installed and we capture the Platinum and palladium we could see a reflection of our ni cost come down. I see more drilling could add yrs of mine life and a lower ni cost going forward. Traps7

                      1. Replying to @traps7

                        Liberty Mines arranges extra credit for McWatters

                        2010-02-08 08:28 ET - News Release

                        Dr. Gary Nash reports

                        LIBERTY ARRANGES ADDITIONAL CREDIT FACILITY WITH JILIN JIEN NICKEL

                        Liberty Mines Inc. has arranged an additional $4.5-million credit facility with Jilin Jien Nickel Industry Co., Ltd. (JJNICL) of China. The funds are to provide working capital and to complete additional development of the McWatters and Redstone nickel mines near Timmins, Ont. The principal bears interest at 8 per cent on the unpaid balance and will be payable in full with interest by Oct. 17, 2010, which date will be extended if the price of nickel averages less than the current $8 (U.S.) per pound. Liberty may, at its option, prepay at any time all or any portion of the principal amount outstanding or any interest owing without notice or penalty provided that any such prepayment shall be applied firstly to interest and then to the payment of principal.

                        JJNICL has also provided $2.1-million of bridge loans to match receivables in the amount of 25 per cent of the value of monthly provisional payments due from Xstrata Nickel for concentrate shipments. Those holdbacks are due 3.5 months after the delivery month of the concentrate; the first of which since the October, 2009, shipments commenced, is to be received on Feb. 15, 2010. The total amount of short-term principal outstanding to JJNICL is approximately $11.2-million which is payable in tranches from March, 2010, to October, 2010, with some flexibility, as stated above, due to uncertainty of the price of nickel over the next several months.

                        1. Replying to @traps7

                          ...having this slush fund to draw from while waiting for Xstratas payment will help the every day to day operations. I see this as a sign from our partners as knowing LBE is well on its way to becoming cash flow positive. I see with these mill upgrades allowing 1800 tns aday helping to raise our cash flow as LBE can opperate Tax free for the short term while proving up more resources through the drill will help keep LBE in the driver seat. Traps7

                          1. Replying to @traps7

                            Our commitment to and the expectation from JJNICL, is to re-pay the money lent by it to Liberty as soon as possible; including the redemption of the preferred shares. By providing the funds needed to optimize our operations, JJNICL has enabled us to achieve this common goal. However, the timing of which does depend on the commodity price of nickel over the next year."............Traps7

                            1. Replying to @traps7

                              There are those that say why should we have borrowed more but even reading the 43-101s there were always capital plans laid out. They were always worked into the pricing of our cost already and our revenue. It is good we got the money made available that we could get McWatters going and then Hart. Redstone we have avail ore to work with until the cash gets flowing more readily.

                              1. Replying to @Wanderer5

                                Wanderer, any idea how much profit we can write off from our tax credits. I guess this avail ore at the Red Stone along with the ore coming from the Mc Watters will sure get the ball rolling. ...any idea when the Heart mine will see work . Thanx ..Traps7

                                1. Replying to @traps7

                                  Traps - p 124 of McWatters Ni43-101

                                  "At the time of printing, the amount of income tax payable for the duration of the McWatters project is anticipated to be zero."

                                  "No municipal taxes or other levies were considered in the current scope. Liberty has an impairment charge of about $30 million written off from 2008. As a result, Liberty anticipates that they will not be paying tax on the pre-tax cashflow at McWatters."

                                  1. Replying to @Wanderer5

                                    Wanderer, not sure if i am reading this right but i see 13 million as a net return so if this estimate is tax free thats great. I guess just thinking out loud and looking at the low cut ni % of each of the three levels then we could see much higher return with good mining. I also see this,(

                                    These above assays do not reflect the complete

                                    Anomalous values of copper and cobalt were also located.

                                    i guess we could get lucky and with the mill upgrade ( gravity circuit ) and capture these PM not mention in the report and realise a higher average ni % Gary will be on his way to repaying those prefereds..

                                    mineralized section of 312 feet. The weighted average assay over a mineralized core length of

                                    312 feet (138.6 feet to 450.6 feet) was: 0.11g/t platinum, 0.28 g/t palladium and 1.43% nickel.

                                    1. Replying to @traps7

                                      Traps I am going back to the PR dated 22 Dec 2009

                                      It says "Due to time constraints, this report does not optimize the "caved pit design" with the underground operation." "The pre-tax cash flow would be in the range of 15.2 million to $17.2 million."

                                      We know this report was $7 US nickel with the Cdn dollar at $0.90.

                                      I just cross my fingers. Liberty has assembled a good group of people who are working hard to make things happen for everyone. This report was considered conservative but that is good. Now it is just hard to wait.

  2. EBF, i guess if you have become cautious, then go with your gut feelings and take a wait and see approach until future work develops and see if your caution was answered.. I guess more drilling could raise this to a resource category and raise mine live. I guess looking at the big picture on the Web page, thier are alot of areas that require drilling that could bring us into the next decade..Traps7