Liberty Commences Open Pit Mining at McWatters
Liberty Mines Inc LBE
6/7/2010 8:00:00 AM
Edmonton, AB June 07, 2010

FSC / Press Release


Liberty Commences Open Pit Mining at McWatters

Edmonton, Alberta CANADA, June 07, 2010 /FSC/ - Liberty Mines Inc. (TSX: LBE), ("Liberty or the Company") is pleased to announce the commencement of the open pit part of the mining operations at the McWatters nickel mine. A detailed program has been established to regulate blasting in both the open pit and underground workings to ensure the safety of all employees. Pit blasts are scheduled at approximately 5:30 PM between shifts when all personnel have been cleared from the site to a designated point on the McWatters access road. Underground blasting cannot proceed until the pit crew has exited the pit.

About Liberty Mines Inc.

Liberty Mines Inc. is a producer of nickel and is focused on the exploration, development and production of nickel, copper, cobalt and platinum group metals from its properties in Ontario, Canada. It owns and operates the Redstone nickel concentrator near Timmins Ontario.

CAUTIONARY STATEMENT
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This News Release includes certain "forward looking statements". All statements other than statements of historical fact included in this release, without limitation, statements regarding future plans and objectives of Liberty, are forward looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Liberty's expectations are: exploration risks;commodity prices; regulatory approvals; receipt of mining permits and leases; equipment failures and shortage of supplies; and assumed startup and operating costs detailed herein and from time to time in the filings made by Liberty with securities regulators. Forward-looking statements speak only as of the date on which they are made. The Company undertakes no obligation to publicly update any such statement or reflect new information or the occurrence of future events or circumstances, except where required by securities regulations. Accordingly, readers should not place undue reliance on forward-looking statements.

For further information please contact:
Dr. Gary Nash, PhD (Physics), President & CEO
Phone (416) 238-9736 Fax 780-437-7898
e-mail: [email protected]


Press Release 10-10



Source: Liberty Mines Inc. (TSX: LBE) http:// www.libertymines.com
Maximum News Dissemination by Filing Services Canada Inc. *
www.usetdas.com

Join the conversation about Liberty Mines Inc.

Reply

Replies

  1. 17.4.9 Production Rate (pp86=87)

    McWatters Mine production rate as determined by SRK varies over the Life of

    mine (“LoM”) depending where the production is sourced.

    The upper portion of the mine from surface to the 45m level is to be mined by

    open pit and is scheduled to produce at an average rate of 1,400 tonnes per day

    starting in March 2010 with completion in October 2010. Total mine

    production scheduled from the pit is 245,000 tonnes at an average of 0.33%

    Ni.

    The sublevel cave/blasthole production rate averages 1,800 tonnes per day.

    Total ore production scheduled from sublevel cave/blasthole is 546,000 tonnes

    at 0.68% Ni.

    In cut and fill stopes with a single face the production rate is 280 tonnes per

    cycle while in a double face it is 560 tonnes per cycle. Total production

    scheduled from cut and fill is 81,000 tonnes at 1.91% Ni.

    Total planned mine production from McWatters is 872,000 tonnes at 0.70% Ni

    mined at an average production rate of 1,500 tonnes per day from December

    2009 through July 2011. Refer to Table 25.

    Table 25. Production Rates by Mining Method

    Tonnes

    Nominal Rate Mined

    Tonnes/Day

    Distribution

    %

    Pit

    245,378

    1400

    28

    SLC/BH

    545,597

    1800

    63

    CF

    80,925

    220

    9

    Total

    871,900

    1500

    100

    1. Thanks W5.

      If nickel can hold at around $8/lb then LBE is looking at around $107 million in nickel not including pmg credits. And yes, I know that doesn't all go to the bottom line. It is good to see LBE is going to increase revenue and isn't getting held up by delays like it was in the past.

      Will the market start to take notice?

      1. Mikey I don't know when the market will notice us. This will sound corny I suppose but it seems almost like a waiting game. Patient investors wait for those who lose patience. June 30 is the end of our second quarter and financials will be out mid Aug. Until now development has used up all our cash. It will be our third quarter that will be the most exciting. Patience is a virtue I suppose. Have you been watching some of the Volcano specials on TV lately. It is fascinating watching the magma flows and thinking about the whole Abitibi Greenbelt of which we are a part. The Nickel vein at the bottom of McWatters is like a hole in a hose. Where the magma exploded through the hole at the base and had a chemical reaction with the elements and formed McWatters. Interesting stuff. I don't explain it well but it is interesting stuff.