Skip to content
Sign in

Post

Montello Resources

You’re reading duncanmcl’s reply in this thread.Jump to it

VEEP3.2 rating from 25 members2.1K ptsRate

nagging thoughts

I had to go over some previous NR's as too many thoughts have been nagging at me. Am I reading too much into this? With no news in such a long time the mind is running wild.

Calgary, Alberta November 14th, 2007 Montello Resources Ltd. ("Montello") (TSX Venture Exchange Symbol "MEO") as to a 55% interest, Austin Developments Corp. (AUL on the TSXV) as to a 40% interest and Great Northern Oilsands Inc. (OTC: Pink Symbol "GNNS:PK") as to a 5% interest, announces that the John Bowen #2 Well ("the Test Well") has now been drilled to a total depth of 9,580 feet after having reached what is believed to be the Pre-Cambrian basement after circulating granite samples to surface. The hole is being conditioned and Haliburton has been contracted to handle the logging of the Test Well.

Does anyone know what date Halliburton was to begin logging?

Calgary, Alberta: November 21st, 2007 Montello Resources Ltd. ("Montello") (TSX Venture Exchange Symbol "MEO") announces that Montello as to 55%, Austin Developments Corp. (AUL on the TSXV) as to 40% and Great Northern Oilsands Inc. (OTC: Pink Symbol "GNNS:PK") as to a 5% interest have cased the John Bowen # 2 Well in Morgan County, Tennessee, to 9,557 feet.

1 week after 14 Nov NR the hole is cased.

Calgary, Alberta December 17th, 2007 Montello Resources Ltd. ("Montello") (TSX Venture Exchange Symbol "MEO") announces that logging and evaluation of the John Bowen #2 Well has been deferred until at least mid January, 2008.

Logistical issues have made the delay the only practical choice. Scheduling after US Thanksgiving with travel time to and from the location; length of time to complete drilling, casing and cementing; initial aborted efforts to run open hole logs when open hole logging tools got stuck twice (following recommendations by Halliburton and our own geo-scientists to run cased hole logs); release of the rig to accommodate logging and evaluation; the December 14th acquisition by Park Place Energy of Great Northern Oilsands Inc.'s 5% interest; and the requirement to issue the last Supplemental AFE all contributed to the delay.

This is what I find interesting…logging postponed due to;

1 - length of time to complete drilling, casing and cementing

Casing was completed by 21 November almost 1 month before the NR postponing the logging

2 - initial aborted efforts to run open hole logs when open hole logging tools got stuck twice (following recommendations by Halliburton and our own geo-scientists to run cased hole logs)

Sounds like Halliburton was already on-site prior to the hole being cased

3 - Scheduling after US Thanksgiving with travel time to and from the location

See #2, if Halliburton was already on-site before the hole was cased, what travel time is there? And the hole was cased at least 1 week prior to the American Thanksgiving on 27 November. How much time is needed for logging?

Thoughts and constructive comments are appreciated as always.

SunSeeker

Join the conversation about Montello Resources.

Reply

Replies

  1. Dude,

    Infer some logging was done before the tools got stuck. Cuttings and mud samples were scrutinized every few feet on the way to basement. The only news issued acknowledges encountering hydrocarbon bearing zones albeit only traces of the stuff we're looking for so far. Nearby wells are so replete with treasure (oil & gas) that they've flowed uncontrollably when punctured (like a balloon under pressure) despite being drilled by experienced companies & crews. What would you do, announce to all the world what you know ? or get your hands on every available nearby lease, secure advantageous financing in the middle of a credit crunch and continue planning additional drilling. Finding the resource is just the first step. Exploiting the resource is another matter and takes every bit as much business expertise of a different kind to execute effectively. I think we are lucky to have a longer term, deep thinker in Bill C. Note that there's been no substantial insider selling reported. I'm sitting tight although I do admit dropping a half a valium from time to time.

    Good luck and happy Friday.

  2. Hi Sunseeker...

    I doubt Halliburton was ever on site ready to log...the advice on closed hole logging could have been given over the phone, based on Montello's description of the on-site situation. Or it could have been given by someone from Halliburton who was on site and who's job was to evaluate HOW the hole should be logged. But in the press releases nothing implies that Halliburton was on site, WITH EQUIPMENT, ready to log.

    I've been told, and also read here that once equipment is in place it will take about 30 hours to log JB#2.

    I share your nervousness and frustration though.

    El Joro

    1. You may be right about Halliburton - but someone did some open hole logging and got stuck in the hole according to previous NR.