Skip to content
Sign in

Post

Montello Resources

You’re reading duncanmcl’s reply in this thread.Jump to it

Prez3.7 rating from 53 members9.7K ptsRate

Regarding the latest SPECTACULAR news release.............

No need to worry,

· they just fractured the reservoir a little too vigorously and damaged the wellbore a teeny bit causing nitrogen to escape up-hole all the way to the surface (lucky it wasn’t combustible gas)

· the well flowed mud filtrate and drilling fluid of no value (lucky it wasn’t marketable oil, gas or condensate or they’d have to interrupt their holidays to negotiate a sales agreement or two)

· they just want 3 or 4 more weeks for the pressure to build up (after all, it’s vacation time !)

· they haven’t got a well plan for #1, #3 etc. etc. (too busy dreaming up promotions ?)

· the Pincher Creek pipeline hearing has been postponed just a little longer (for the umpteenth time)

· While we’re waiting on the next exciting NR, they’ve kindly furnished us with reading material about the Chattanooga Shale and all the other companies that are successfully producing from it (zzzzzzzzzzzzzzzzzzzz)

Wishing everybody a safe and happy holiday and a prosperous New Year (including Corker and Brownie and uncle Phil Emrich and all…………...)

Keep smiling,

The new, improved, optimistic Mergatroyd.

Join the conversation about Montello Resources.

Reply

Replies

  1. at least we were informed now and not left in the dark waiting and wondering when the completion will be done,,,with information a person can make their decisions whether to hold, buy, or sell,,,

    wow! only 5 more days,,,Feliz Natal e bon ano novo!



    SunSeeker

    1. A perforation in the context of oil wells, refers to a hole punched in the casing or liner of an oil well to connect it to the reservoir. In cased hole completions, the well will be drilled down past the section of the formation desired for production and will have casing or a liner run in separating the formation from the well bore. The final stage of the completion will involve running in perforating guns, a string of shaped charges, down to the desired depth and firing them to perforate the casing or liner. A typical perforating gun can carry many dozens of charges.

      Commonly, perforation guns are run on E-line as it is traditional to use electrical signals from the surface to fire the guns. In more highly deviated wells, coiled tubing may be used. Newer technologies allow the guns to be run on slickline. No communication with the surface is possible with slickline. Instead, a mechanism on the gun arms the charges upon reaching a certain temperature and pressure. A timer will then fire them following a set interval.

      The benefit of this strategy is greater deal of control of the well. Casing the bottom of the hole allows the well to be completed without having to worry about reservoir fluids. It also allows precise selection of where in the formation production will be and to be able to seal off perforations, which are no longer useful or counterproductive, through cementing or straddling.

      The disadvantage is that perforating can lead to "skin damage", where debris from the perforations can hinder productivity of the well. In order to mitigate this, perforating is commonly done underbalanced (lower pressure in the well bore than in the formation) as the higher formation pressure will caused a surge of fluids into the well at the point of perforating, hopefully carrying the debris with it. Other methods of stimulation such as acidising and proppant fracturing are often required to overcome this damage and bring the well up to its full potential.

  2. was waiting for the sp to hit .015 to load up but the news of the skindamage caught me off guard.hope the last 4 weeks were not wasted.lots of time yet to buy cheap.what is the procedure for repairing skin damage?