Surface work?

Can one of our mining savy fellows/ladies explain this statement? What does 'surface work' entail and does this mean that they can continue with the ramp after the freeze if they get the surface work completed in time?

Thanks. BK

QUOTE:

'Drilling is continuing and some surface trenching is contemplated before year-end.

Permitting for the underground exploration ramp is underway in anticipation that surface work can be completed before freeze-up.'

Join the conversation about Noront Resources.

Reply

Replies

  1. BK,

    Anytime mineralization is near surface (i.e. Windfall) it is worth stripping the overburden away so one can look at the structure, texture....of the deposit.

    The NR basically says that they will bring in a backhoe and dig down to bedrock to have a looksee.

    Rockaur

    1. Absolutely,

      "surface surveys are underway to provide 3D mapping of this occurrence, results of which will be used to facilitate a more detailed interpretation of the sulphide target."

      Since we are buried by muskeg we don't have outcrop but wait until they expose "the occurance". If it comes to surface and is big and beautiful (could happen) it will be very newsworthy.

      John

  2. BK,

    I understand that to mean the work on the portal for the ramp and setting-up the ancillary facilties need to handle/support putting in the ramp (e.g. ore storage/dumping, etc.).

    If you recall from my "Ramp" post on Shouse way back, procedures/process was outlined for the ramp based on information provided by my father (mmining engineer).

    There is more to starting the ramp than just digging... :-).

    Regards,

    B.

  3. It was my understanding that they could get the surface work done but if they don't have the ramp significantly under way to provide them with protection from the elements, they won't continue.  Comments?
  4. I have reread the NR nad maybe they just meant the drilling and trenching they have ongoing. The statment seems a little ambiguous... But whether its the drilling, trenching or ramp preparation, its all surface work that they will want to get done before winter.

    Regards,

    B.