X sections - mineralized peridotite
Hi Guys,
Here's the mineralized peridotite to look at over the weekend
Have a Merry Xmas and Happy New Year
Rockaur

Join the conversation about Noront Resources.
ReplyYou’re reading bravekind’s reply in this thread.Jump to it
Hi Guys,
Here's the mineralized peridotite to look at over the weekend
Have a Merry Xmas and Happy New Year
Rockaur

Join the conversation about Noront Resources.
ReplyI am new to the board but have been a shareholder for awhile. I have tried to stay focused on the technical attributes of the DE 1 deposit as it will be the benchmark that the other anomalies when drilled will be measured against as well as the DE 1 deposit is still open to the south and to depth.
I have been working on benchmarking the DE 1 deposit to determine target size for a stand alone high grade operation to determine the % probability of success and the required range of drilling to outline this "theoritical" tonnage level.
I have used sectional methods based on company limited info to come up with a current approximate volume in the range of 800,000 to 950,000 cubic meters for DE 1 as it stands today. Using company info it appears the average grade of DE1 is in the order of 3% Ni equivalent.
I appreciate your technical posts and was wondering if you have a theoritical approximate volume for the 3 D model in cubic meters for comparison purposes only.
I will share my opinion and findings as I develop the model.
Thanks in advance.