X sections - mineralized peridotite
Hi Guys,
Here's the mineralized peridotite to look at over the weekend
Have a Merry Xmas and Happy New Year
Rockaur

Join the conversation about Noront Resources.
ReplyHi Guys,
Here's the mineralized peridotite to look at over the weekend
Have a Merry Xmas and Happy New Year
Rockaur

Join the conversation about Noront Resources.
ReplyI am new to the board but have been a shareholder for awhile. I have tried to stay focused on the technical attributes of the DE 1 deposit as it will be the benchmark that the other anomalies when drilled will be measured against as well as the DE 1 deposit is still open to the south and to depth.
I have been working on benchmarking the DE 1 deposit to determine target size for a stand alone high grade operation to determine the % probability of success and the required range of drilling to outline this "theoritical" tonnage level.
I have used sectional methods based on company limited info to come up with a current approximate volume in the range of 800,000 to 950,000 cubic meters for DE 1 as it stands today. Using company info it appears the average grade of DE1 is in the order of 3% Ni equivalent.
I appreciate your technical posts and was wondering if you have a theoritical approximate volume for the 3 D model in cubic meters for comparison purposes only.
I will share my opinion and findings as I develop the model.
Thanks in advance.