Skip to content
Sign in

Post

Noront Resources

You’re reading donypee’s reply in this thread.Jump to it

Prez3.7 rating from 288 members8.1K ptsRate

Don't want to burst our bubble, but..

I have completed below a model that denotes what value Rhodium, Osmium, Iridium and Ruthenium add to each tonne of ore.

I am making the assumption as per Glorieux's conversation with Richard yesterday.

He talked quite a bit about the PGE info. He explained that the ratios of PGE Rhodium, osmium, iridium and one other I always forget should follow the concentration of Platinum and Palladium. So wherever you find Palladium and Platinum, you should find the other PGM in direct propertion to the assays of hole number 5. He stated that we had enough PGE's to generate a mine just for this.

So, with this in mind, here is what I have calculated to be the value of the "IUM's" to be:

HOLE #5 (SECTION WHERE "IUM'S" WERE FOUND)
PT PD
30.2+15.95
46.15TOTAL GRAMS
RU OS IR RU
0.84+0.15+0.21+0.42
1.62TOTAL GRAMS
3.51%HOLE 5 % THAT "IUM'S" REPRESENT OF OTHER PT & PD

It is important to recogonize that this section of hole 5 is not representative of the entire ore body. the following denotes what I beleive to be our average weighted metal content.

AVERAGE
WEIGHTED "IUM'S"
METAL METAL
CONTENT CONTENT
1.0853CU
2.0749NI
1.0546PTX3.51% 0.04
3.8169PDX3.51% 0.13
0.3125AU
3.3866AG
0.0031RH
0.0006OS
0.0008IR
0.0016RU
2.92NI EQUIVALENT
TOTAL 0.17"IUM'S g/t

Of the total "IUM's" that were found in hole 5 (1.62 g/t) the following denotes what percentage each represents of the total and what is our expected "IUM" g/t on average.

EXPECTED "IUM" g/t ON AVERAGE
TOTAL g/t "IUM'S" 1.62
RU 0.8451.85%0.170.089
OS 0.159.26%0.170.016
IR 0.2112.96%0.170.022
RU 0.4225.93%0.170.044

So, with current metal prices (average between current bid & ask was used) our average "IUM" value per tonne is:

EXPECTED "IUM" g/t ON AVERAGE VALUE
CURRENT PRICE PER OUNCEPRICEPER
PER gTONNE
RU0.089$9,000.00 $289.39 $25.66
OS0.016$380.00 $12.22 $0.19
IR0.022$445.00 $14.31 $0.32
RU0.044$430.00 $13.83 $0.61
"IUM'S" TOTAL VALUE PER TONNE $26.78
5,000,000 MT VALUE $133,916,412.35

Quite frankly, I was hoping to determine that the "IUM's" would have added a more substantial valuation but I still wanted to share this info with the board.

Always open to comments,

Cheers,

Milsy1

Join the conversation about Noront Resources.

Reply

Replies

  1. Milsy1 - can you please recalculate what Rn meant by A PGM mine.

    The ore valuation would include PD, PT etc. + the ium's as viewd by a PGE mining company

        1. times $ 850 a ton ....and situ value is 40% x 134000000 shares .....i get$$ 22.00 a share is that right ???? hope so
          1. Have been following your forum for several weeks now. Am impressed with the general high quality of the postings. Bought NOT shares at about the time the last PP was announced at $4. Did my due diligence beforehand and would like to share it with you. Comments would be appreciated.

            Assumptions for DE1:

            9 [email protected]% Ni, 1.1% Cu, 1.6 g/t Pt, 4.0 g/t Pd, 0.2 g/t Au

            Density: 3.6 g/cc

            Mining Rate: 3500 t/day

            Capital Cost: $700M

            Reclamation Cost: $4M

            All Season Road to Pickel Lake: $150M (300km @ $500/km)

            Recoveries: 80% Ni, 75% Cu, 40% PGMs

            Operating Cost: $75/t

            Road Maintenance Cost: $1.4M/yr

            Metal Prices: Ni $10/lb, Cu $2.50/lb, Pt $1200/oz, Pd $300/oz

            Au $800/oz

            Working Capital: $10M

            Mining Life: 6 yrs

            # shares outstanding: 125M

            NPV(10%) = $1309M ->$10,47/sh at railhead

            If cost of road doubles then: NPV(10%) = $870M -> $6.96/sh

            Capital and operating costs based on experience at Xstrata's Raglan Mine in northern Quebec. Cost of all season road to Attawapiskat about the same. I believe that the assumptions made are very conservative.

            Have been involved in the mining industry for over 38 years.

              1. Replying to @PM

                Degrees In Geology and an MBA and presently semi-retired minerals consultant specializing in base metal, precious metal and diamond properties
                  1. Replying to @johndefur

                    The only other discrepancy is th Shares outstanding, I believe we are at 135M fully diluted. Otherwise, great post. I truly hope you will continue to bless us with your presence. That was the best first post I have seen to date. Welcome!

                    Glorieux

                    1. Replying to @Francis Dube

                      One of the financial analyst reports had an estimate of the road construction. I think it was much less that GEO stated.

                      Does anyone know where that report went?

                1. Replying to @geoprof

                  Fantastic geoprof - welcome aboard! Do you have any comments about a critical ore value taht would confirm a economical mine? Also would you agree that this value can be reached by the area play and not necessarily by NOT alone.

                  Many thanks,

                  PM

                  1. Replying to @PM

                    In the Abitibi greenstone belt, volcanic cycles have been recognized with ultramafic/komatiitic flows at the base grading upwards to more felsic volcanics at the top. At the base are Ni deposits such as Alexo, Dundonald, Sothman,Texmont, Redstone, Langmuir, etc associated with the ultramafics and Cu/Zn deposits such as the Potter and Kidd Creek associated with the upper felsic volcanics. Are we seeing the same in the McFaulds Lake area? Who knows right now, but maybe worth considering.
                    1. Replying to @geoprof

                      I think a call to Neil Novak with NOT and alo with SPQ along with the teriffic geo pros on this forum could help you there, but my question was how many dollars do we need in the ground, to confirm a mine in this location, and given the geology/assumptions so far. At one point we agreed that $10 billion was the magic number. Do you have an opinion on how much ore we need to prove up to confirm an economic mine?

                      Many thanks,

                      PM

                    2. Replying to @geoprof

                      Actually...you might get a good chuckle out of some of the wild  possible Geo theories I have proposed...everybody, including the area players and their Geologist have been describing possible theories for Genesis...and btw the "meteor Impact" one is not just my theory, many area players are leaning, and like it, hoewver NO conclusive theory has yet emerged... Prof. Mundel has questioned as to the source of the Sulfur...My only response was a possible felsification as the source of the retention of the Sulfur...

                      As far as your possible theory...from the research I have done on McFaulds, there is only 1 and only mention of Komatiites...and it was just a like a btw...so that will be different....there are Mafic and Felsic flows...in addition another major difference is the presence of PGEs and Chromium in substantial amounts in the area...

                      However the existance of MMS and VMS is an interesting one, especially the VMS Cu/Zn occuring near the Felsic end...however there are some differing views as to whether these VMS at McFaulds are tru VMS?, or ?

                      anything you can add would be appreciated....I'm going out for dinner, been couped up all day...

                      JD*

                       

            1. Replying to @geoprof

              the Biggest question I would have would be the "road'...Debeers and Ont Gov are building all season road to their Victor Mine some 70 Kms from NOT's DE...so those road costs are way off...epcially if the Ont.Gove chips in like with Victor...

              The next Biggest is the price of the Metals ...way off!!! even at todays prices ...by the time NOT is ready to mine, 3 to 5 years or so these Metals prices will be far far higher...In my view one needs to add at least 50% to your prices...

              Also as tonnage increases over the next 3 to 5 years for the entire Ring of Fire, costs should come down accordingly, and thus reserves values should increase substantially...

              as alway IMCO

              JD*

              1. Replying to @johndefur

                "The next Biggest is the price of the Metals ...way off!!! even at todays prices ...by the time NOT is ready to mine, 3 to 5 years or so these Metals prices will be far far higher...In my view one needs to add at least 50% to your prices..."

                That's why he said his quotes were very conservative. 

              2. Replying to @johndefur

                Please give me your source of info re cost sharing between Ont Gov't and Debeers re all season road to Victor Mine. My sources, which include MNDM, have not indicated that this arrangement exists. Winter roads maybe, but not all season.

                With respect to my assumptions, I did indicate that I felt that they were "very conservative". I hope that you a right, however, and my calculations are way low.

                 Thanks for the comments.

                1. Replying to @geoprof

                  Actually, I read about the "road" on the Debeers Victor mine web page...quite the infrastructure being build up there...also why wouldn't the Ont Gov chip in like debeers Victor....after all look at all the NEW Jobs that will be created...I would think it would be in the Ont Gov. Interest to see as many mines operatiing in Ontario as possible....apparently each new mine racks in some $50 Million into their treasury....
                2. Replying to @geoprof

                   

                  market is going to close soon,

                  how about our active members play a game,each come up with a best and worst scenario for this three month forcast..

                  I may start first:

                  worst ..buyout for Cad 7.00 ..poison pill does not work..

                  best.....find the DE1 has formed bridges extending to PRB and fnc areas...

                  please join ... 

                   

                   

              3. Replying to @johndefur

                I'm just getting caught up on these posts and am tracking this road issue for the umteenth time.

                I don't know who chipped in for the Victor Road but I can tell you this. At my meetings here in Thunder Bay we are already discussing the reserves and the access we will have to the many reserves for health care. We have been discussing this for years. The reserves up North are in Thunder Bays catchment area. It is the largest in Canada i believe with scattered communities. I have been a volunteer in the city since my retirement in 2000. The money is already being discussed for a road in the back rooms here. There will be one big push by the Ministry of Health I can gaurantee that, not to mention tourism and virtually every other department. This is bigger than the NOT hit now because lives are at stake. We now have a reason/excuse for not moving forward.

                The terrain is the same to Victor and DE. One or 2 phone calls to the right person and you have the cost per kilometer of the road to Victor.

                Lets not forget that mrjack works at Victor. He lives down the street from me and he is heavily invested here. Same terrain. Road should cost the same. Unfortunately he can't post here anymore due to an argument with MJ.

                I still don't understand why the board continues to want to discuss non issues such as this.

                What has happened with this area so far is very little. Granted Nemis is in a hurry and doing things right through jv to cover ground but we are in infancy relatively speaking. This is day one of the rest of your lives. Lets get more than June and Johnny up there turning. Lets get a dozen turning with the labs backed up, then we'll return to the road. Or it will be in the hands of the major who buys!!!....Don

                1. Replying to @donypee

                  Don, loved reading the rant with respect to roads. All too true from my experience. Soft bashing or practical business practice - either can account for the continued recursive behavoiur of many. Stems from ideological dogma and all that blinkered business kind of stuff as well as Pseudo Academic Fraiser Insdtitute nonsense. It is not bad to revisit some common issues. Government has to do it on an almost continueous basis. Too bagdBig Business can't learn or refuses to learn from Government.

                  IOf (and I feel confident) Noront and a few of the others come up good or even big on another Anomaly in the next few months then it would be well worth while for all the area players to get together and sign a pact commiting to contract to Goods and Services providers willing to setablish permanent bases in the immediate "Ring of Fire" area. This would cut down greatly on costs to all, both Exploresr and Technical Support Services. The Goods and Services Camp Group could rent out the constructed facilities to the likes of an Assay Lab, Transport Operator(s), Geo-Technical Provider(s), Drilling Contractor(s), Caterers, and so on. Something like what happened (and very quickly and effectively) during the Klondike Gold Rush but with advanced planing and cooperative coordination built in from the Get Go. Difference being is that the JBL Rush will last for 100 years plus. Those planing to continue through next year will have to setablish most of the facilities this coming summer anyway and Noront will have to expant their already existing facilities. Who can do all this for there Explorers and allow them to focus on the Exploration???

                  Wonder why I think of such things?

                  EFFICIENCY!!! COST REDUCTION, ENVIRONMENTAL QUALITY CONTROL, BEST RETURN ON INVESTMENT DOLLARS. REDUCED EGOTISTICAL MANIPULATION, etc.

                  Old Joe 

                    1. Replying to @donypee

                      Peter wrote apiece in todays paper about a coming shortage of allCommodities, world wide demand very high !! ( should be good for us )
                          1. Replying to @mark555

                            I think Hodson did a great job of outlining/listing many of the events past recent and upcoming that had been posted/discussed on this great forum ...The Inflation effect on upcomiing mining project is striking indeed...And Major Miners are/will NOT give away their Minerals on the Cheap, as in the past, since they know/realize that these HUGE deposits will very hard to find indeed, let alone the inflated costs of bringing them into production..

                            One more I would add is Major Miners are NOT the only ones NOT wanting to give away their Natural Resources...The collective Globe as a whole has now become cognacent of both the shortage and the low value of these Natural Materials, especially when viewed theu the efect of the ever declining US$ and it's Hegemony...In my view, many of these foreign countries, just as theu did the last time the US$ and it's Hegemony were in peril, these foreign countries placed every kind of imaginable red tape and excuses in the way of these production developments, to keep these materials in their ground, in order to get as much as possible for them in the going/day currency fiat....just look at what happened to South Africa....most of their Gold is mostly mined OUT, at dirt cheap prices well below $300.00 US...So the SA Gov is only too glad to cut back on the Mines Electricity...a natural excuse...

                            This is probably the primary reason why I have been advocating Miners/Explorers in North America, especially Canada, since I believe the Canadians realiizethey have a World's treasure house of Natural Resources, and that will be the "Yellow Brick Road" to Canada's Economic Prosperity for the foreseable future...

                            Bring it on...We're waiting...

                            IMCO

                            JD*

                  1. Replying to @Old Joe

                    I agree this would make the most sence so somtimes that means it wont happen. I hope in this case Mr Nemis can bring all the parties together for the greater good (my wallet and yours) and get these roads built and all the DE's from one to 100 drilled and milled.

                    ricter

            2. Replying to @geoprof

              Nice post . Interesting read.

              Have no issues with the grades but not sure of the tonnage. The SG seems it may be on the low side but it comes down to how you split the massive sulphides etc.  

              Using your figure for tonnes why would you not model say a 2500 tpd operation with mine life of ten years?

              Your unit costs for an all season road is $500,000 per km. Is that right. If so not bad for this type of analysis. It really come down to the number of river crossings. Did you consider the fact that there is a winter road to Webequie and that  the gov't has upgraded this so some of the prep work has already been done so would lower costs. Did you look at coming from the south ie Martin Falls which is 115 km south of DE?

              Does your operating costs include smelter/refining charges?

              Anyway thanks for sharing and doing the work. Much appreciated. 

              1. Replying to @quiz

                Tough to get reliable figures on all season road construction in the lowlands. That's why I used two figures of $500K and $1M per km. The latter is a figure that I believe Debeers released quite a while ago, but has never been mentioned since for an "all seasons" road from Attawapiskat to the Victor Mine. The former is a figure from road construction in NE Manitoba to a First Nations community, however, the road maybe totally on the Precambrian Shield, and a lot less expensive than over the James Bay Lowlands. Its important to realize that, in my opinion, an "all season" road is a must. A "winter  only road"  would insert a high , and maybe unacceptable, degree of uncertainty re cash flows from the project. Winter roads are OK for the diamond mines in the NWT and Northern Ontario, but remember they are shipping out diamonds which may only amount to a few pound a year. Some have suggested the use of "air ships"; for transportation to remote areas such as this, but to date it only looks good on paper.

                My calculations were based on production of a concentrate at the mine site. I did not include any smelter/refining charges, however, I do not think that they would be a major impediment to mine development. Lets look at the deals that FNX and First Nickel have with Vale and Xstrata respectively. 

                1. Replying to @geoprof

                  Why is this road issue being brought up again? Anyone have nay ideas. Are we regurgitating already? Its only Saturday morning.

                  The road is a non issue. I don't care if there are 1000 geos on the boards. The government will cover costs anyway and the funds will come from multiple departments including the Health Ministry for the reserves. This is not a wall or an impediment. It is a non issue.

                  I say this again if you go from Pickle Lake a road is 100 klicks in with no major rivers if I recall right. If this turns out to be a VB we will see the Armstrong Highway extended due north right into the ring and the circle route will take us back south east to North Bay. Its time to open up the North. We, the Ministry of Health have had this issue in sight since I became a Nurse.

                  There is a large mine on the east shore Hudson's Bay. We discussed it on the board. We were discussing how they were getting their ore out and compared it to NOT and ROF. Many of you will recall this discussion. I believe their ore wound up in Sudbury....corrections are more than welcome...Don

                  1. Replying to @donypee

                    Maybe you should appreciate the fact that the geos and engineers on this site do discuss the issues and if you stand back and look at what they say you may learn something about how mines are permitted and the hurdles companies have to go thru.

                    I would assume then power is not an issue as well to you.

                    Having been involved in northern and remote road construction into mine sites. we have never dealt with the Ministry of Health for approval. Approval comes from MOE, MNDM, MNR as well as the feds get involved for river crossings etc. MNDM mandates working with the First Nations as well.

                    Having said all that, cost sharing will come from the companies in the ROF and they will petition the gov't for funding either for capital costs or maintenance but it comes down to liability issues.

                    Now when people say these things are issues they are not saying they are negative, all they are saying is that they have to be addressed and accounted for.

                    1. Replying to @quiz

                      I just jumped ahead. I am attempting to get caught up on my reading and responding. I responded then the thought struck me. I bet Quiz has a response. Scary. Sure enough here it is.

                      Don't think for a second that I don't appreciate Geos and engineers so long as they don't get too God-Like in their own minds and even more importantly they are who they say they are. It has been my experience many of you come and go while we remain. Some leave good memories and knowledge while others leave a sour taste in your mouth once they depart.

                      Now that the road issue has been deemed a non issue you come back at me with power? lol

                      One more thing. Don't go twisting my words. I did not say that the Ministry of Health approves anything. What I am saying is the Health Ministry is looking forward to the new road and will contribute. Every budget will be reassessed especially Health. We are already discussing it!!! Diabetes, addiction, suicide etc.. are our concern. We have been discussing this for years! This is our opening! We will get our road so save you geo jargon.

                      I don't immediately think that a post is negative. We pray for geos and engineers to help us with our questions. We are thankful for engineers.

                      Keep in mind that I became a Nurse at age 40 after 25 years in the bush, pipeline and construction. I returned to school at 40. I have a business diploma, Industrial Relations as well as nursing. I am 60 now and will be 61. My first job at 14 was on the Grand Rapids Dam in Northern Manitoba and that was when SIN cards were initiated. I owned a back hoe and a dump truck so don't think for a minute that Nurse means lilly white hands.

                      I have been involved in remote construction of roads in my past. Everyone in Northern Ontario in my age group has! Who do you think built or had a hand in building all of these highways you enjoy today? I know my friends and I from Thunder Bay got a lot of work building roads.

                      So go ahead Quiz. Discuss the issues with our new geo and we'll listen. I give you the perfect world.

                      Don

                  2. Replying to @donypee

                    Here is what the Wassermann report said about the road to McFualds:

                    The area is covered by marsh and limestone and there is little relief. A series of rivers and small lakes drain the landscape. An all season road is being constructed to the town of Marten Falls scheduled to be completed by October 2008. Once completed, a winter road can be built from Marten Falls to the Double Eagle project camp. Ground access to the project through Marten Falls will save considerable time. It takes seven hours to drive to Marten Falls from Thunder Bay compared to 20 hours to Webequie from Thunder Bay via Pickle Lake. A fuel depot and warehouse will be established in Marten Falls as part of the road building initiative.

                    PM

                    1. Replying to @PM


                      INSTITUTION SPECIFIC CONNECTIVITY
                      Band Administration Office Internet Connectivity TypeDial-in No Charge
                      Is that Internet Access available to Community Members ?
                      Health Centre LocationMarten Falls (Ogoki Post )
                      Connectivity StatusHigh-SpeedFacility TypeHealth Office
                      Number of SchoolNet Sites1
                      SchoolNet Internet Connectivity TypeN/A
                      Police Detachment LocationMartin Falls
                      Police Detachment Internet Access AvailabilityDial-in No Charge
                      Community Access Point available atnone available
                      Nearest Friendship Centre (FC)Thunderbird Friendship Centre
                      AddressP.O. Box 430, 301 Beamish Avenue WestCityGeraldton
                      Province/TerritoryOntarioDoes the FC have a CAP Site?
                      FC Internet Connectivity TypeNo Connection

                      GENERAL INTERNET CONNECTIVITY
                      Residential Internet Access AvailabilityDial-in No Charge
                      Percentage of Households that Subscribe to the Internet1-25
                      Percentage of Households that Subscribe to Satellite TV51-75
                      Expected Internet Availability by the end of 2007Dial-in No Charge
                      Other Significant Reserves for this First Nation
                      Reserve Name
                      Connectivity Related Information
                      Reserve Name
                      Connectivity Related Information

                      JRID : 00461
                      1. Replying to @jackwho

                        Someone posted a link to the winter road map a while back - can someone help jackwho? I don't remeber the poster.
                  3. Replying to @donypee

                    Don, I agree" and would add for comment:

                    "The government will cover costs anyway and the funds will come from multiple departments"

                    I have been feeling for some time that an expanded or new port + rail link somewhere on HBay/James Bay to the "greater ROF area" would provide Artic security/military installation/mining shipping/rail infastructure via NW passage; and form basis for backing up government sovereignty actions in near future. Not to mention northern jobs, as pointed out.

                    Peter

                2. Replying to @geoprof

                  Thanks for response.

                  My point about the winter road to Webequie is that some or the prep work has already been done for an all season road so there will be some cost savings in comparison to starting with nothing.

                  Also if we are arm waving, a potential mine could start off with a winter road access and only ship concentrate out during the winter months. From a cash flow perspective most smelters will advance a portion of the con value before shipping as well as bridge financing would not be a problem. Example is the Nanisivick Mine. An all season road could then be done over time.

                  Yes I think one of the great comparables is FNX for what could be the first stage of development at NOT.

            3. Replying to @geoprof

              Great post Prof. Welcome to the board as well. I, like many here, are long on NOT and really look forward to reading the posts every day and eventually (not too long) seeing the rewards from the ROF. having you here is great, keep up the informative posting and don't get too discouraged if we make you feel like a teacher in grade school rather than a prof.

              I also think that your estimates are conservative, but I don't mind that as it gives me a stake in the gorund (pun intended) in regards to my costs in and where this thing can go.

              God Bless all NOT shareholders.

              Jeeper

            4. Replying to @geoprof

               

              Good to see your post.

              Concise and to the point.

              You have helped to quench our thirst for knowledge... for today. Thirst needs constant maintainance so keep posting!

              What a great board!

              BK

              1. Replying to @bravekind

                BK, very appropriate observation for a Friday evening. Thirst does need constant maintenance.

                With that in mind I am going to do a little maintenance.... perhaps with a Lowen, Moson, or Heiny.

                Have a great weekend all!

                God Bless all NOT shareholders.

            5. Replying to @geoprof

              O.K. I found the post and your introduction Geoproof and there is the Raglan I was referring to in one of my previous posts.

              Welcome to the board.

              Sorry for ragging on this road issue but it happens to be an issue tossed at the board by negative posters and to be hones a thorn in my side. I believe the road is the least of our problems at this point in time although it would be nice to have one.

              You have qualified your figures with "Assumptions for DE1".

              If you don't mind I will refer to them as your assumptions. You see there are assumptions such as road maintenance that you factor in yet we don't know who will maintain it yet. Will it be declared a highway for government care? Or will agencies chip in for the cost of maintenance? This road issue is all so speculative as to be, a non issue at this time nor will it be one later on. The Government will build or pay for the road.

              I believe your mileage is off by quite a bit from what I've been told although Don Hoy from FWR has informed me that it will be expensive none the less when I discussed this with him the last time this came up.....Don

    1. PM, I am not exactly sure what RN meant by a PGM mine. That was relayed by Glorieux.

      In my weighted average calculation of 2.92 NI equivalent, it really does not include the "IUM's" as there has only been 1 hole assayed. The purpose of my post was to demonstrate what the "IUM's" might be worth if what Richard stated comes to fruition.

      I completely understand that ALL minerals will be viewed by ANY type of mining company.

       

      Cheers,

       

      Milsy1

       

       

      1. Remeber that we were comapring our cores to PGE world class mines. So we would like to know when you inculude the P's and the IUM's. how that compares to the world class chart that we had posted a while back.
      2. Hi Millsy,

        When PGM mines come in, they add together the values for Platinum, palladium, rhodium, iridium, osmium and rhutenium to get a valuation. In your calculation, you omitted the platinum and the palladium. If we are talking about a PGM mine, we need these included in the calculation. So could you see what your model would give if you add these 2 metals. Thank you for doing such a great job with these calculations.

        Glorieux

  2. ...milsy,

    that doesn't really burst the bubble too bad as $133,916,412/134,000,000 shares outstanding (the last number i remember!!) is still an extra $0.99/share in situ that isn't currently in our SP or the target from Genuity (somebody correct me if i'm wrong there) bringing the target to $6.50....sound right??  either way, I'M LONG!!!

    cheers,

    reg

    1. Actually Reg, if we are to be ultimately bought out by a major, 40% of in situ is likely the number. So:

      133,916,412 x .4 / 134,500,000 = $0.40 per share.

       

      Milsy1

  3. You have done an excelent job with your charts.

    Is it true that they will mine Nickle at approx $15 per ton and be profitable under the right circumstances. So to me having $27 of PGE's not including the nickle, copper, gold, silver... sounds to me like we have a mine here and a pretty proffitable one considering some of the ground we where sitting on was estimated at $5000 per ton at one point if I remember correctly. I would think this combined with previous results from other companys along with BMK's recent results we deffinatly have a MINE HERE but thats just my opinion.

    Ricter

    1. Thanks Ricter.

      I am not sure the answer to your question. Maybe somebody else can help you out with it.

      With respect to our current mineralization, it is fantastic. I think it's just a matter of time until we are able to prove up more tonnage.

       

      Cheers,

       

      Milsy1

  4. Now in those values, you did not include palladium and platinum which when Richard talked about a PGM mines, it included these.  I know those are already included in our Ni equivalent valuation model but just had to mention that the PGM mine would be for all these metals. 

    Gl.

      1. The reason for doing the excersise is to assess the project form the perspective of a PGE moning comapny. That would include the vaule of PD, PT's and iums all together.