Skip to content
Sign in

Post

Noront Resources

You’re reading bernardho’s reply in this thread.Jump to it

Replies

  1. On such a slow trading day, just a comment on this talk of winter road to Marten Falls 140km away, I don’t understand this route, so please enlighten me.

    Debeers Victor Diamond Mine is 40 km away from us, a new winter road to Attawapiskat, then existing coastal winter road to Moosonee, plus power. I see 40km versus 140km. Province of Ontario owns Ontario Northland (Railhead at Moosenee) See quote,

    “The project consists of the development of an open pit mine with an on-site ore processing plant, quarries and sand and gravel pits, workforce accommodation facilities, all-weather air strip, muskeg, overburden, processed ore and mine rock stockpiles. The project includes a number of off-site components such as, improvements to the existing coastal winter road between Moosonee and Attawapiskat, a new winter road between Attawapiskat and the mine site, new power transmission lines from Otter Rapids to Kashechewan and from Attawapiskat to the mine site, storage yard for equipment and supplies in Moosonee and office and training centres in Attawapiskat.”

    No doubt we’ll have Ontario government support on this infrastructure, that in my view is a non-issue. Whomever is eventually the major partner would also have most input into this decision, ultimately based on smelter location.

    Cheers, mark

    1. Victor Diamond Mine is 170 km east as the crow flies, most likely closer to 275 km by the time a road is mapped out

      Has any one ever been in the area? I've fished all through the area in a 185, bit tough to build a all season road I think, or a rail line for that mater.

      It's airstrip and winter roads accessible only.



      1. Your right Highgrader, had 40km in my mind to Victor??? Still think if and/or when a major producer gets involved, plans can change drastically. Still good to have the NOT go it alone plan. Cheers, Mark

        Existing Infrastructure and Access

        1. The first access to the outside world from Thompson was a railroad, completed ( as far as I can recall) in 1957. I worked on the crew that surveyed the roadway route in 1959 and the road was started the following year and completed in 1963. Prior to the railway, the start of construction was supplied via "cat trains" from the railhead at Pikwitonei (sp). A "cat train would consist of several tractors, each hauling six or seven trailers loaded with fuel and other supplies, and led by one with a blade that cleared snow only as necessary. Most of the route was over water for obvious reasons. One of the trailers held a kitchen and another a community sleeping quarters as the trip could take several days.

          An Ice road as is known today is far different, as it would be designed to allow actual truck traffic.

          Regards

          K

          1. yes i relise this as i run one of the cat trains of witch you speak.now i work on winter roads in northern ab. bc. nwt. big changes but very do able on ont. lands.

            riley

            1. Replying to @life of riley



              Please , to members of Noront forum:

              Could anyone who read the book about V.Bay has any recollection about their 43 101 indication after one year from their first discovery, any similarities between Noront and theirs.

              We have presumably hit resources that range from 20 billion to 50 billion worth after one year hard work with only 7 and half months assays results, in addition,

              Neighboring companies continuely show good visual results .

              How was V.Bay share price after a year of discovery?

              BH





              1. Replying to @bernardho

                BH,

                V.Bay was discovered prior to NI 43-101 reporting requirements.

                From page 117 of the book is the following: After holes No. 7 and 8, company geos offered preliminary estimates that the deposit could hold as much as 25 million tonnes.

                JP

              2. Replying to @bernardho

                bernardho,here is a quote from page 117 of "The Big Score"

                "The first four drill tests from October(1994)had indicated only 1 million tonnes of ore was buried at Voisey's Bay.After holes No. 7 and 8,company geologists offered preliminary estimates that the deposit could hold as much as 25 million tonnes.No other nickel mine in history had ever proven such valuable reserves after only 8 drill holes.The estimate meant that even if they did not find another pebble of nickel,Voisey's Bay would rank as the world's seventh-largest nickel mine when it went into production,even bigger than Falconbridge's planned Raglan mine in Northern Quebec.Raglan,set to begin production in 1997,was one of the largest nickel mines launched in years,with estimated reserves of 18 million tonnes in 1995.But reserves were only part of the story at Voisey's Bay.The ore was so rich and sitting so close to the surface that experts were beginning to suggest that Diamond Fields was sitting on one of the world's cheapest nickel sources."

                By August 1995 after 150 drill holes all they had to show was more ore at the original"ovoid" and the shareprice passed $70.Hole 166 hit massive sulphides for the first time outside of the "ovoid" at a depth of 500 meters and they were away.On Sept.21,1995 with the shareprice near $100 Diamond Fields stock split on a four-for-one basis giving each of the new shares a market value of $24.There doesn't seem to be mention of how many shares were outstanding at that time but I recall someone posting here gave us that info and it was between 25 and 30 million shares.GLTA.

                cs.

                1. Replying to @cappysmart

                  Nickel - LME Price Charts

                  LME Nickel - Charts ... Place mouse over price line to see data points. ..... Jan 1996. US$3.727 37952 MT Feb 1996. US$3.640 35493 MT Mar 1996. US$3.644 ...Today ~10.00/lb

                  Raglan,set to begin production in 1997,was one of the largest nickel mines launched in years,with estimated reserves of 18 million tonnes in 1995 ( from Cappysmart)

                  The above is the criteria set.

                  As of today, Noront has >1.8 million to NI and

                  Multimillion ton of CR which is = 3.5 % of NI...( from Noront report)

                  if >1.8 + 5 million ( assume) CR = 6.8 million ton but our current NI price is > 3 times more than in 1996 then it means 6.8 x 3= 20.4

                  our in situ resources in monetary term for sure is better than Raglan mine at the time of 1996....besides our % of NI is richer..and our report was based on assays results up to July 3rd...

                  Hope this DD may help, correct me if I am wrong...



            2. Replying to @life of riley

              Hello Riley

              Sorry I missed the fri evening musings. (I am still in summer vacation mode)

              As a consolation I would suggest that as Saturday is also a slow day here, how about swapping some lies re: winter roads.

              As a youngster, my extended family was deeply involved in several aspects of "winter roads" in northern Manitoba/ Ontario. As well I, myself was involved to some extent in the same services in N/E BC/NW alta during the 70/80 ies. There honestly is no comparison.

              Regards

              K

  2. Content of first post did not show...

    Community of Marten Falls 115 km

    south of discovery, or 190 km by

    proposed winter road (discussion

    underway)

    The Tibbitt to Contwoyto winter road’s route — a distance of 568km travels 87% of the way over frozen lakes.

    Joint venture is a partnership between Echo Bay Mines Ltd., BHP Billiton, and Diavik Diamond Mines Inc.

    Nuna reported an annual operational cost of $10,000.000 for 600 km

    aprox $17000.00 / km

    Ice road to Martin Falls from McFaulds Lake

    200 km @ $17,000 = annual operational cost of $3,400,000.00 / year

    Initial construction cost ?

    See this report, c/o Northern Gas Project Secretariat's

    its quite involved of land portions

    http://www.ngps.nt.ca/Upload/Propone...

    History of ice road construction

    http://www.thedieselgypsy.com/Ice%20...

    Nuna Logistics:

    http://www.nunalogistics.com/project...

    RTL ice road:

    http://www.rtl.ca/index.php?option=c...

    1. Bit misleading as the costs would be considerably higher in the Northwest Territories. James Bay lowlands is more favourably placed if not ideal.

      Expensive but a lot easier for building 'permanent' road or rail access.

      1. Also pretty smooth sailing. They can avoid some big rivers for less cost. It doesn't matter. From what I am hearing the road is in, its just not built yet and there will be government $$$.

        Don

      2. The road is inevitable to make the quantum leap in value, so we should probably ask who in the NOT "New Management" crew is in charge of logistics, and I bet we could get into some enlightening conversations.

        Additionally, Boats are slow, Helicopters scarcer and more expensive than planes, and there are certain CEO's and investors with their own planes who are adverse to flying in helicopters. Getting in the simple airstrip will accelerate our exposure at a surprising rate, and provide better support on all time-critical elements within the camp.