Good evening everyone.
I haven't posted in a long time, but have read the board faithfully every day. I don't feel the need to post my every thought, even though my mind may be racing with what I think is really good stuff. I usually find that if it really is good stuff, someone else more worthy and respected ends up posting my thoughts, so if he/she is right, I feel good about myself, and if he/she is wrong, well, at least I haven't embarrassed myself :)

Just a few thoughts I'd like to share tonight. First of all, I have never seen so much speculation and "blue sky" enthusiasm as in the last few weeks. It does not surprise me that some are disappointed with today's news release. But it really is not all that bad. In fact it is very good, in my opinion. Not "spectacular", but very very good. Mind you, 23m of massives in a hole where massives were not even targeted is definitely attention-grabbing. I believe the analyst on BNN said he would be pleased with a couple of 5m intervals.

What we all need to do is really read the news releases. Really read them. Compare numbers. Those who have done that this evening will see that the overall tenor of the mineralization in Eagle 1C is not far off from that in Eagle 1A (see 43-101). Both calculate out to somewhere is the range of ~3% Ni equivalent. Eagle 1B is considerably lower, at ~1.6% Ni equivalent. But after all, it is just one hole so far. Hole #1 back in August 2007 was about the same caliber.
What is very encouraging is what somebody else posted earlier this evening. These two zones in Hole 49 represent the two longest intercepts we have ever had.

Perhaps someone could help me with this one. The 178.84 meters of mineralization is contiguous with another 37.47 meters right above it. This first section was reported separately as 1.77m of massives from 269.21m to 270.98m, and 35.70m of disseminated sulphides from 270.98m to 306.68m. Starting from there the "main" zone is reported as 178.84m of 1.19% Ni, etc. Why on earth would they report it this way? It makes no sense to me. 216.31m of mineralization sounds way better! The overall grade would only drop from 1.19% Ni to 1.10%. Any explanations? Is this spin? Just a little confused here.

Now for a genuine concern. Like many of you, I try to do a little due diligence before buying any security. The over-exuberance, the rumors, the over-the-top adjectives ("spectacular", "phenomenal", "amazing", etc.) get my blood pressure up just like anyone else, but I just can't bring myself to put my money on them. I work hard for it. I would like to to think I can count on the facts as presented by my company. I bought more NOT recently based largely on one fact. Like many of you serious investors, I was impressed by the length of the mineralization in Hole 49, but was more interested in getting some indication of a second dimension to round out the picture. I thought I had it in Hole 45. The June 29 NR states:

"Hole NOT-08-045 at Eagle One, deepened in 2009, intersected 46.12 metres of nickel, copper sulphides including two short intervals of high-grade massive sulphides."

It goes on to repeat the same data later on in the NR. Fast forward to the NR of today, August 5. The interval reported is not 46.12 meters. It is 14.62 meters. Furthermore, only one very short interval of massive sulphide is reported. Does this concern anyone else out there? How can 46.12 meters suddently become only 14.62 meters. Less than a third. If it is just a transpositional error, it is UNACCEPTABLE, especially considering that we retail investors hang our hats on these scraps of information, whereas others are likely privy to a lot more. If there is more mineralization, where is it? I must say, looking at the geographic models posted on the website this evening, the interval in hole 45 looks like it might be longer, but it is hidden behind the delineation lines for hole 49, so it is very difficult to discern. I don't mean to be overly meticulous, but it seems to me that this is a key piece of data that they did not diligently and properly communicate to us. I reread the June 29 release at least a dozen times. Did not anyone in the office reread it at least once?

That aside, I am still holding. Its been 16 years since I first bought a few, and I've not yet sold a single share. Despite the many disappointments over the last couple of years, I've continued to buy here and there. Keep the faith, friends. Higher valuations are coming, probably not tomorrow, maybe not next week or month. But the value is there in the ground, no doubt about it.

Join the conversation about Noront Resources.

Reply

Replies

  1. Good evening folks, Johnny I am totally blown away by your post. You have touched on some very important key elements that were not mentioned by any other poster today. Your analysis on hole 45 suggests that you have a very good understanding in the field of geology. I would strongly encourage you to keep posting as your post was probably one of the most informative and well written posts of the day. I would have to strongly agree with you that the higher valuation is coming. We all need to relax and know that our investment is with NOT not the market. Todays release only cofirms that a buyout is eminent.

    Rockstar.............................

  2. OK, I agree. A clarification of our management is surely welcome. But...

    Being an enigineer (with some logic...) If you check the print: on the right it says (to my opinion) that it's hole 09-45 instead of 08-45. But then if it is hole 08-45 and you measure the intersection in the drawing then is must be a misprint. I just measured it. It has two sections X1E (Disseminated Sulphides) which in total a more or less 45m. I'm not a geologist but...

    I would welcome justificating or opposing comments..

    Regards,

    MJL

    1. hmm ok .. I think I understand the miss understanding.

      In one document it doesn't state the 9-45 hole ... namely PR release 29 june.

      "Hole NOT-08-045, which failed to intersect the mineralized zone in 2008, was deepened in 2009 and

      intersected 46.12 metres of nickel, copper sulphides."

      The deepened section is actually 9-45 ... the 9 refers to the year it was drilled. 45 refers to the location...

      Hope that clarifies things?

      1. Okay I plead a big, duh, on this. So 08--45 was 46.12 and 09-45 was 14.62. Different drill location on same hole. I get it now. Nevermind Hoov. Thks Burn.

        strato

        1. Let's not dismiss the problem too quickly. Examining the documents, you'll see that hole 08-45 and 09-45 are the SAME hole. Furthermore, the diagram on the website says 08-45 next to the graphic itself, but says 09-45 in the table beside it. The problem persists, in my way of interpreting it: the intercept lengths reported on June 29 and August 5 are very different.

        2. Hmm let me think... no I think its not exactly like you put it... its confusing, but simple.

          8-45 ... hit nothing...

          Then they re drilled it... bang, it hit ...

          9-45 ... hit 46.12 metres of nickel, copper sulphides (June 29th) (VISUALS)

          9-45 ... update (today)... so the whole thing was assayed in a lab. and then turns out, 60% of the 46m intersection was actually a bit misleading (not very abundant in metals...)

          9-45/8-45 are drilled through the same hole, same direction / elevation etc etc...

          One thing I'm trying to understand is the following:

          "Hole NOT-08-46, drilled beneath hole 045 failed to intersect any significant

          mineralization." June 29th

          When did that happen???

          http://norontresources.com/find/id/15/rb

          Look at the diagram...drill intersections. And you'll see 46 drilled above 45 ??

          Ok that's really confusing me. Maybe someone can explain.

          Maybe I'm just tired though.


  3. I'm a bit behind with my reading so let me try to answer about this one paragraph as I understand it:
    <
    Perhaps someone could help me with this one. The 178.84 meters of mineralization is contiguous with another 37.47 meters right above it. This first section was reported separately as 1.77m of massives from 269.21m to 270.98m, and 35.70m of disseminated sulphides from 270.98m to 306.68m. Starting from there the "main" zone is reported as 178.84m of 1.19% Ni, etc. Why on earth would they report it this way? It makes no sense to me. 216.31m of mineralization sounds way better! The overall grade would only drop from 1.19% Ni to 1.10%. Any explanations? Is this spin? Just a little confused here.>

    By example:
    Small residential apartment building with three floors,
    Floor one (street level) has three apartments, remainder offices etc.
    Floor two has five apartments.
    Third floor has one - A Penthouse.
    But the Average Floor for the bulding has three appartments.

    So it is with mineral deposits. They are NEVER homogenious.
    To describe them, a report will give an average for the whole thing but on occasion will highlight low and most often high concentrations to give one an idea of the deposit's distribution.

    With the 216 meter B interval they first divided it into three sections similar to my apartment example.
    This shows that the first two meters have a high (over 5%) nickel content (8 grams of silver not impressive, imo.).
    The second has low nickel but good palladium content.
    And the last and largest has adequate nickel content high palladium.
    The "AND"s following break it down further, but you should get the general idea.
    No spin, that is how most reporting is done.
    Also , That is how I prefer to see it.
    Cheers.

  4. Respect for staying with us that long already...

    We need to email the Board on a couple of things.

    1. Visuals of hole 50+

    2. And the previous in accurate description of hole 45.

    I suggest a couple of people email the board of Directors/PR... Especially the people who were aware of it before posting on this forum/board. They know what they are talking about. Do this respectfully...

    Regards,Bernhard

  5. This is from Johnny's post. Very astute of him to pick this up. What he says in exactly what's in the the release from June 29th and from yesterday's news. I have re-read yesterday's charts and NR and can find nothing to explain the difference in numbers. Clearly, yesterday's NR states only 14.62 metres, overall, in hole # 45.

    The only common theme with these two numbers, 14.62 and and 46.12 reported on June 29th, are that each of them have a 1,2,4 & 6 in them. Could NOT have made a mistake with the numbers in print ? I doubt it very much.

    So as Johnny said, it is unacceptable and we need an explanation from management on this. Thanks for digging this up, John.

    strato

    The two short intervals in hole # 45, reported on June 29th, are the 14.62 metres.

    "Hole NOT-08-045 at Eagle One, deepened in 2009, intersected 46.12 metres of nickel, copper sulphides including two short intervals of high-grade massive sulphides."

    It goes on to repeat the same data later on in the NR. Fast forward to the NR of today, August 5. The interval reported is not 46.12 meters. It is 14.62 meters. Furthermore, only one very short interval of massive sulphide is reported. Does this concern anyone else out there? How can 46.12 meters suddently become only 14.62 meters. Less than a third. If it is just a transpositional error, it is UNACCEPTABLE, especially considering that we retail investors hang our hats on these scraps of information, whereas others are likely privy to a lot more. If there is more mineralization, where is it? I must say, looking at the geographic models posted on the website this evening, the interval in hole 45 looks like it might be longer, but it is hidden behind the delineation lines for hole 49, so it is very difficult to discern. I don't mean to be overly meticulous, but it seems to me that this is a key piece of data that they did not diligently and properly communicate to us. I reread the June 29 release at least a dozen times. Did not anyone in the office reread it at least once?

  6. Hi Johnny,

    I'm a newbie here too, but already lurking here since the great august 2007 holes and holding shares since beginning 2007. But I'll come with a introduction later on.

    I've tried to see where in the Aug 5 NR the statement about hole NOT-08-045 is, but I can't find it and I've painstakingly read it. Could you help me/us out here?

    Regards,

    MJL

    1. http://norontresources.com/find/id/15/rb

      on the right info on the intersections... also 45

      http://norontresources.com/News/getDocument/notpr-2009.06.29.pdf/147

      2nd page 2nd paragraph...

      info on 45 ... but different numbers.

      Come on mate ;) don't give up...

      Anyway, this might be a big mistake. We'll find out soon enough. Buy guys, focus on the great results. hole 49 is absolutely amazing... I'm surprised frankfurt/noront is dropping slightly... But I'm sure that will change...