Skip to content
Sign in

Post

Noront Resources

You’re reading BertaCurry’s reply in this thread.Jump to it

Treasurer2.4 rating from 195 members4.9K ptsRate

How much do you think...

How much tonnage do you think Noront has when including triple the amount at eagles nest, and what they say they have in chrome(that had to be retract in their PR).

30 mil? 35 mil?

Join the conversation about Noront Resources.

Reply

Replies

      1. All of the time, instead of sleeping, sigh, Of course my wonderful, faithful, Ouiji Board reviews all incoming information for my safety. durn it. As bad as some in here.

        Don Jose de La Mancha

    1. Packsackman, you say 'minable' but I interpret that as the profitable portion from presently known.
      Resulting share price must be at the core as to why the question was asked.

      From Dec.9,2009 news Highlights regarding chromite:
      < - Measured and indicated resource of 8.9 million tonnes sufficient for
      a 15 year project producing 200,000 - 225,000 tonnes of ferrochrome
      annually and a further inferred resource of 6.0 million tonnes with
      the potential to add an additional 10 years to the project.
      Mineralization remains open at depth;>

      On Nov.23 I posted following:
      <
      From drill news released on November 19,2009:
      "Our geological team currently estimates between 10 and 15 million tonnes of mineralized material at Eagle's Nest averaging approximately 2.0% nickel, 1.0% copper, 1-2 grams per tonne platinum and 3-5 grams per tonne palladium"
      Using:

      2.0% Ni = 44lbs.@$7.57 = $333
      1.0% Cu = 22lbs.@$3.11 = $68.42
      1.5g/t Pt = 0.052oz.@$1453 = $75.56
      4g/t Pd. = 0.138oz.@$370 = $51
      ==============================================
      Total $528

      Shares = 164 million Discount to 5%
      10 million tonnes = $5.28 billion = $32.19/share $1.61
      15 million tonnes = $7.92 billion = $48.30/share $2.41
      >

      With both projects not completed with regard to drilling and reporting, we have to assume that the larger quantities are there and that there is a possibility for way more.
      However in today's words, 15 million tons for Eagles and 15 million tons for Balckbird's chromite.
      I discount to 5% due to both just being at exploration stage but with a bankable resource estimate.

      The chromite at say $150/ton = $2,250,000,000 and represents $13.72/share. Discounted to 5% =$0.686.
      Add the two up (2.41+0.68) and you have an estimated real price of $3.09 per share.
      Not far from what some prognosticators recommend for Noront's price Today.
      E.G.

      1. Edgy, nice; a rock value of 500 $/tonne is indeed very economic to mine.

        We also have to include rhodium(Rh) since it will recovered together with Pt and Pd, and its price is also very high, up to 10 grand/ounce.

        Things like titanium, vanadium etc do not add any value and will not be mined, their processing is very different.

        Basically in order of importance, Ni, then Pt-Rh-Pd, then Cu, then Co and maybe some gold and silver, the rest does not really count except if you have enough chromites and grade to have a separate chomite mine.

        Cu-Zn also do not add much value except if we find lots at very good grades.

        The main isssue for NOT is that we need to find probably something above 50 million tonnes nickel ore to justify all infrastructure and processing facilities. With a couple of more eagle discoveries we will be very close and you will see a rapid increase in share price. This is where any input from Cliff could be of great help in getting us going.

        1. You wont here me complain if they hit a wack of that platinum, rather than nickel.

          Just like the last platinum press release.

        2. The copper is just as valuable as either the platinum or palladium.

          It is the thorium that we can not say much about at this stage because it is just an
          indicator with no substasntive quantity reported. That is why some here are getting impatiant with the additional assays of old cores for the other rare earth's ( these assays need more time to do?).
          Processing may be different for Vanadium but I expect that some day it will also become a
          mine, it is just a matter of time. I have plenty of faith.

          The price of $3.09 should be the minimum imo at this time if one adds remaining bits and pieces PLUS the hype factor for potential with our land holdings.

          Cheers.

          1. Sure copper also pays the bills, but ideally you want higher nickel and higher platinum group metals. Copper comes as CuFeS2 and all that sulfur should end up as sulfuric acid. This has to be sold or given away and shipped somewhere. The same is the case of nickel, it is just that nickel pays better. So if your production capacity is limited by SO2 regulations, you are better off producing nickel. From far up north selling and shipping acid is always an issue. Where are the buyers and how far do you have to ship, plus nobody likes having trains or tankers of acid passing their neigbourhoods

            SO2 emissions, government regulations and transport of sulfuric acid are the big drivers for all sulfide based mining operations.

            Long term, Sudbury should be the spot to ship nickel concentrate from the ROF since they got all the processing and infrastructure needed, and in spite of strikes etc they will not shut down permanently. Sudbury may actually become the central hub for all nickel processing in Canada; already now concentrates from Ragland, Voisey's Bay and various mines in Sudbury all end up there.

            One thing about the economics of nickel is that NOT as well as anyone else will have to pay custom fee treatment charges wherever they ship the concentrate, so when doing the economics you will never get the full value of the nickel when selling it as concentrate. Typically the mining costs are in the 50 to 60% range of the total cost of overall processing. I suspect that either Vale or Xstrata(or joint "Sudbury Nickel") will eventually buy up NOT as well as anyone else with nickel in the ground.

    2. The P.E.A. for Eagle One that Noront released October 20, 2008 with a signing date of December 4, 2008 (covers only the first discovery down to about 300m depth) showed 1.8MT indicated and 1.0MT inferred (page 20). We're down past 1100m now with the further discoveries, with what was called Eagle 1b and 1c, which are described as a conduit and now called "Eagles Nest". We don't have any more data *yet* from Noront from further drilling of the Eagles Nest. For now the 6-8MT looks pretty accurate for this one deposit (no AT12 or Eagle 2), but it's still open at depth.

      Add in the bonanza platinum find in the area of Eagle 1b... 84oz/ton.

      Add in the triple J gold zone

      Add in the Vanadium and Titanium

      1. Thats what i'm talking about.

        Brain storm the tonnage is what i am really interested right now.

        Voisey's bay was like 169 mil tons.

        I figures 30 mil to 35 mil in minable resource.

        We still have lots of land to cover.