This is a "stay the course" NR

Any NR that tends to increase value is a positive NR. This release has done so with respect to the conitnued infill drilling results.

This was not a sexy NR or one that is likely to light any rockets. What it did provide was some insight as to why we are where we are, and the difficulties in extending the resource estimate beyond the knwon parameters.

Deep drilling thus far has been a bust, not because there is nothing there (our various carefully rendered studies suggest that there is much there) but because of technical difficulties, broken equipmnet, lost drill heads etc.

In other words, it is no easy task to drill 2 kms below the surface. Think how difficult it is to thread a needle ( I speak as one whose eyesight is no longer that of a twenty year old!). Now imagine a length of pipe, actually many dozens of pipe segments, approximately 18 inches wide 2kms longs, trying to remain straight and true and hitting a target...through rock.

jacki has written that she believes that there amy be assay results by labour Day. with respect, I disagree (although I am a great fan of an optimistic oputlook!). I belive that these first attempts at deep drilling will expand to further attempts as the learning curve decreases, and that this will be expensive and take lots of time.

But that it will be worth it.

So, I for one will not clamour for another release any time soon. I will simply wish the drilling teams Godspeed and good luck as they try to do what must be a very difficult task, ulltimately for my benefit.

And it the meantime, the market can go --- itself! I've still got my shares, and ain't nobody taking them away until I say so.

Now...if's it's all the same to you...

ZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZ

Wake me up at $20.00

crazydik

Join the conversation about Noront Resources.

Reply

Replies

  1. 18 inches accross? Try 5 inches. H casing is being used on the deep right now. 18" would be nice as it would be easier to keep straight though haha.

    Two small drills turning, one standby. Three deep turning.

    Moose88

    1. My question is? They have been running the deep drills now from May June,and July .One drill started at the 1200 meters,were the last years drill stopped ,(hole 49)Surely there must have been some core come out of those holes ,were is it ,And the other drill ,They went to 1200 mters last year are you telling me it broke down before it got that deep this year.With all these puny excuses ,some body should start running the show up there .BP drilled down 5 miles ..what kind of a team do we have up there .

      BJ

      1. You're asking the wrong people!

        Go to SH, I'm sure you"ll get the answer you're looking for there.

        Where have you been? NOT doesn't give partial assay results. So the core you think they have aren't going to be reported, on its own.

        The other drill took a long time to get to 1200m, so yes they probably had issues with it as well.

        Maybe BP didn't report the problems they had with the drilling to 5 miles down. Our team up their is telling us they are having problems. Which is better?

        Everyone wanted news, and we got it. Now we'll spend the next little while complaining about getting news. Then we'll start complaining in a few weeks that we aren't getting news, again.

        Most investors that have strong negative issues with the managment of a company don't own it, they sell it and move own. You should consider that.

        This managment has been very consistent, get used to it. Most of us have.

        GL
        RW

      2. BJ, If you go back and read the news release, they explain hole 49, as well as a wedge off of it.

        FWIW, I believe BP took 3 years to drill that hole, with a rig and crew that had drilled many holes before this one, in familiar ground. We have been at it for 4 months, with a rig that has start up problems????

        K

      3. BJ- in regard to your question, "..what kind of a team do we have up there", I have watched the NR's about the deep drills pretty carefully, and as a result, I am not surprised by these problems. After the blockade ended and the second drill got delivered and assembled, one item that was mentioned was that new crews needed to be hired to run the deep drills. So we have a "new team" up there. AFAIK, Noront is the first company in the RoF to deploy deep drills, so these new teams would need to be imported, trained from existing crews, or trained fresh... probably a mix of these options.

        I think that seeing the bluntness of the attribution of what went wrong with the drilling is a clear indication that *nobody* at Noront is happy with this situation, and they are publicly flogging their drilling contractor to do better. I take it as Noront's "shot across the bow" at the contractor to shape up, or...

        The crews will learn or be replaced. I know that I sure as heck wouldn't want to be working in close proximity to a deafeningly loud piece of gear that could maim or kill me in a heartbeat if I made a tiny mistake. My mind fair boggles at the thought of the amount of torque that drill must generate to move 1km+ of pipe in a rock tube.

        W.r.t. BP, those oil platforms lease out at $1M/day... and it took them 3 years to drill that 5-mile-deep hole. That's over $1B in platform leasing alone, not including the labor. Suffice it to say the drillers on the oil platforms are top-notch because the industry can pay their freight. Patience, man. All this will pass, and then we'll have our assays.

        1. Sorry folks, but there is no comparison between drilling for cores and drilling for oil. In the case of oil, they just keep adding lengths of pipe as the drilling goes down. The only reason to pull up the entire rig is to change the bit. Core drills have to be pulled up more often to remove th contents of the hollow shafts.

          At least, this is what makes sense to me; I could be off base, so correct me if I am missing something.

          Shortty

          1. You're right Shortty. The targets oil crews are aiming for are usually pretty large. They know when they've hit because oil comes out. With the core drills, they constantly have to have surveying crews come in to make sure the hole is going at the correct angle, and then geophysics crews come by quite often to do surveys off of the holes. Never mind the multiple holes that are drilled off of the main hole. If you were to look at a cross section, it would resemble a tree with a larger diameter main hole, with smaller diameter branches going off in different directions. Comparing the two is not a valid argument.

            1. Replying to @Moose88

              All good posts guys ,I am glad I opened the subject .But if they have to bring up the cores every few meters ,then they must have pile of cores on top of the ground by now before any breakdown .were are they and what have they to show so far .

              BJ

              1. Replying to @B-Jay

                Hi BJay,

                I put this question to NOT a while back. The answer I got was that all cores are inspected, logged & placed in the core shack. If any cores warrant furthur attention (assays), they are then sent to the labs. In other words, many cores are not sent because there is no visual mineralization. There may be some mineralization of course, but it wouldn't warrant spending the money on assays, especially when there are many other cores that do warrant furthur attention.

                That's basically what I was told.

                strato

          2. "The only reason to pull up the entire rig is to change the bit. Core drills have to be pulled up more often to remove th contents of the hollow shafts."

            Um, Uh, I do have to correct you as you are missing something. Present day core drilling varies very little from drilling for oil, at least in the sense of the actual drilling. The core is pulled internally on a very regular basis, whereas the entire string would only normally be pulled for bit changes/rod greasing in the same fashion as oil well drilling.

            There are many, many other differences of course, but in this example they are very similar.

            K

            Best regards

            K

  2. How many drills are they using now.It only says one drill is being moved over to AT1 where they already have one, but there were 3 doing infill.Are 2 being sent back?which could save the extra money that will be needed for deep drills, or are there other plans for these 2 drills?

    Anyone?

    IAMS