  1. From the Sept 9/10 NOT NR PA (Preliminary assessment):

    Please note in the PA, the building of a ramp.

    After numerous trade-off studies and evaluations, the Project, as defined in the PA, is summarized as follows:

        <<
        -   1.0 million tonne per year throughput rate;
        -   underground mining of the Eagle's Nest Ni-Cu-PGM deposit;
        -   all major facilities (including the mill) would be located
            underground;
        -   tailings would be stored underground as cemented fill;
        -   minimal surface disturbance;
        -   construction aggregate would be sourced from underground waste rock;
        -   the existing winter road from Pickle Lake to Webequie would be
            upgraded to an all-season road;
        -   a diesel power plant would be located near Webequie and a
            transmission line would provide power to the mine site;
        -   a slurry pipeline would be used to transport concentrate from site to
            a filter plant located near Webequie;
        -   initial mine production would be from an internal ramp; and
        -   a winze (internal shaft) will be developed by year three to access
            the lower levels of the deposit;
    

    From Nov 29/NR:

    Please note from this NR :

    ..."... occur at a future date as part of advanced exploration and potentially from underground drill stations"

    In light of the inability to complete these

    deep wedge holes and the high costs associated with this type of drilling, the Company has decided

    to terminate the deep drilling program while it re-evaluates various alternatives.

    The Company is confident, based on the down hole geophysical results, that Eagle’s Nest

    mineralization remains open at depth and definition of the deposit below the 1,400 metre level will

    occur at a future date as part of advanced exploration and potentially from underground drill stations.

    and finally, please note ( as pointed out by crazytrade .... our CFO knows that dykes can be built to keep water out of ramps, such as when they were built in diamond mines in Ontario.

    Theres more than one way to get at the convergence zone in a timely fashion.

    Peter

  2. i would imagine if Noront did a feasibility study now the shareholders of this company would be pissed. Cause as i can tell buy the general sentiment of the board people just want to see some drill results to move the shareprice so they can sell. A feasibility study would eat up our exploration budget and could infact have a negative affect on the shareprice in the interim

    1. Be careful that you don't use this board as a means of determining what is happening with sentiment and with what is said and done by management. Its a great place to find places to do DD and to get news as so many are looking for something positive or negative. You have to follow up on everything that is said with your own DD to weed out the truth. In this age you can't even take the evening news as truth anymore. I do concur with you about the people want drill results to trade as they can't stand to see a loss or SP to be stagnent. We all want the high of the continuous SP rise. Some of us want to continue towards a mine for long lasting share value, some want good exploration results for quick SP jumps. A little of both is perfect. It all costs money to do and we haven't been as lucky with the drilling as we all hoped. The derisking of the mine seems to be moving along the best. A feasibility study must be done to derisk the project and to finance the mine. We can then move on to the enviormental studies which should make buyers and financers for the company participate. That will drive the SP to the highs most wish for. The complainers will have left at their break even and the rest can make the money we deseve for our wait. Of course I will be blamed for attempting to make others lose money from lost oppertunities but feel free to make up your own mind and not to use a stupid anonymous bullboard poster for your important financial decisions.

    2. "A feasibility study would eat up our exploration budget and could infact have a negative affect on the shareprice in the interim" Drilling also eats up the budget but we continue to want it. Same with the feasibility study. It should be positive instead of negative. It is done for the purpose of determining how and likely a mine could be built and as an aid for future planning. Look at it as a 'bankability study' instead. It is another rung that one takes to become more attractive to investors and financiers.
      1. It also means that instead of our in-ground assets being valued as an explorer at a maximum of 5%, with a feasibility study in place that asset becomes valued at a maximum of 10%.
        1. 8 billion $ value in ground now, JUST for Eagle's Nest. Now 185 million shares outstanding. With N.I. 43-101, (explorer status) resulting 5% valuation per share is $2.16. With feasibility study that becomes 10% and per share of $4.32. I can not state it more simply. Next stage of in ground valuation is with environmental inpact study, building permits and basic infrastructures present (road and/or rail access And power), becomes 20%. Final stage, mine completed and begining operation, = standard valuation of about 40%. With Eagle's Nest being so rich it is more likely to be 50+%. Take that 8 billion $, at 50%, over 200 million shares and it becomes $20/share. That is where the common hype comes from. Granted the shares outstanding will likely be more like 300 million ( much construction is financed by loans especially in low interest times instead of issues of more shares ) but to get there we will likely have more discoveries and even Eagle's Nest will be more proven out. I say they will probably cancel out each other, but even if worst case happens then it is 4 billion $ over 300 million shares = $13/share. Nothing to scoff about.
          1. "8 billion $ value in ground now, JUST for Eagle's Nest. Now 185 million shares outstanding. With N.I. 43-101, (explorer status) resulting 5% valuation per share is $2.16. With feasibility study that becomes 10% and per share of $4.32. I can not state it more simply. Next stage of in ground valuation is with environmental inpact study, building permits and basic infrastructures present (road and/or rail access And power), becomes 20%. Final stage, mine completed and begining operation, = standard valuation of about 40%. With Eagle's Nest being so rich it is more likely to be 50+%. Take that 8 billion $, at 50%, over 200 million shares and it becomes $20/share. That is where the common hype comes from. Granted the shares outstanding will likely be more like 300 million ( much construction is financed by loans especially in low interest times instead of issues of more shares ) but to get there we will likely have more discoveries and even Eagle's Nest will be more proven out. I say they will probably cancel out each other, but even if worst case happens then it is 4 billion $ over 300 million shares = $13/share. Nothing to scoff about. "

            Perfectly logical. I cannot argue one single point. NOT ONE!!! Everything here is an exact blueprint of how things have worked in the past, and "SHOULD" work again for our dear old Noront... There is a catch, however:

            In order to get your valuations as you described, you need 50% plus one share to think exactly like you and vote with you!!! Your valuations are dead on. But, do the institutions that hold 60ish% of the shares share your ideas, or do they want their profits NOW!!! I have learned that the hard way. You do not always get what YOU want (I am speaking about ME here!!!). You are only entitled to what the majority of the shareholders are willing to take, and if that is $3/share, that is what we will get. The truth of the matter is, it is how long the institutions want to hold that really matters. Sucks big time, I know. I would rather they started to mine Eagle 1 Level 1 ASAP in a reduced capacity over ice roads trucking out the high grade ore out with trucks for a year, STARTING NEXT WINTER!!! Maybe then those interested in making a serious offer for Noront will get the picture. Then, MAYBE, we would get a better value for your shares, again, dependant on that 50% plus 1... Until then, we will be at the mercy of those who have a TON of shares... Plain and simple...

            Herb

            1. Replying to @herbwiebe

              I'm afraid you are also right on target. Instos may go for the quick but smaller profits now to use them on other ventures. That is the heavy risk that we take with the sp being as low as now. That is why I try to emphasize the positive so much, that others not get discouraged and sell now, perpetuating the low price. (Most of my profits now are from gold stocks. They are pinned to gold price and gold is dependent on the currency, financial and political problems. Hence I keep an eye on these.) On the other hand I also try to buy up a few Noront shares so that I get some added benefit from the low sp every time it goes down a bit.