Extraction

??Extraction...I doubt it...no permits..no enviromentals..no infastructure..Possibly extraction to accomadate deep drilling..IMHO....Merry Ho Ho to everyone..stay safe

Join the conversation about Noront Resources.

Reply

Replies

  1. An exploration shaft straight down the throat of Eagle1, for further exploration at depth? What would it cost? 40-50mill to a depth of 1300m? If there was an winter road to accomodate heavy traffic, they could probably recover 10-15mill by selling the ore, and save the rest in reduced drilling costs,as they could then prove up at depth by drilling from the 12-1300m level.The cost would then be recovered a second time as it would greatly improve the logistics of a permanent shaft, as all waste rock could be removed from below, at least to the 1300m mark and then it could be utilized further as a ventilation shaft or an orepass or something once regular production started. And the permitting required for an exploration shaft would be miniscule compared to full mining permits.

    The powers that be are aware of scenarios such as this, along with many others. How much objection would they encounter if they suddenly announced a 60m financing for just such a purpose. If there was some sort of agreement between the parties on infrastructure financing, which I suspect is already in place, or soon to be so, and they then announced such a financing, I would opine that NOT would suddenly regain it's position as "King of the ring".

    The winter road concept is not such a far fetched idea either. Regardless of how this plays out, whether a railroad, slurry pipeline, or highway, a winter road is the first requisite, as they need to bring in the heavy euipment to do the job, and nothing else is practical. Another thought would be to stockpile the ore on site once the infrastructure was announced. They could presell a lot of ore for delivery in 3 years at a good discount, and likely finance the initial shaft from the proceeds.

    Best regards

    K

    1. As a person with little actual knowledge of mining, this to me sounds like constructive thinking outside the box. By such, we may get on the road to success much earlier than through the conventional process.

      Question: is this underway or actively being considered? Or a kite-flying expedition? Either way, it's a breath of fresh air!

      Thanks, K!

      O.F.

      1. "is this underway or actively being considered?"

        Considered by whom? To answer in the affirmative would suggest I have access to managements thought processes, which I do not. I do though know that this, along with a good many other possibilities have undoubtedly been under consideration for some time now, and that the best possible one has been selected, although I cannot say for certain what that is. Actually I would guess this one didn't even make the final cut, but who knows.

        I also believe that special financing has been discussed with appropriate parties, and is close to conclusion, meaning we will have an especially active winter season beginning soon. Possibly enough action to make up for the nonexistant season last year.

        I am generally a positive thinker on this forum as well as others, but unlike many longtime posters, I am especially upbeat of late.

        All the best

        K

        1. "Considered by whom" -- not much encouragement for us unless considered by our worthy Bof D. Looks like the answer is: that something major is in the wind. This is much better than what we have been doing, namely "slowly twisting in the wind". I, for one, welcome any iniative that will move us off dead centre.

          Cheers,

          O.F.

        2. Well presented Khareema. The winter road I believe was brought up by Richard Nemis and often mentioned by our Herb Wiebe? The slurry pipe to nearest rail was most likely proposed by consultants to the company management. But I consider both of them, while likely, as intermediate solutions. To me rail, with preprocessing on site to lower volume and transportation cost, is the final solution.
          1. "To me rail, with preprocessing on site to lower volume and transportation cost, is the final solution."

            Right on, Ed. IMHO; There is absolutely no way the ROF will be developed without rail service. Just too much material to be moved in, then out for any other possibility.

            That being said, there is no way a railroad will be built over +200km without some sort of supply line to service the construction, and that has to be a winter road, period. No other way of doing it. Once the pertinent authorities announce some sort of agreement on winter access, you can take it to the bank that a permanent supply line is coming, and it won't be a slurry line to Webequie when it comes.

            I do find it comical that by end of January, this conversation will seem so immaterial.

            Best wishes to all

            K

          2. I believe the plan is to truck the concentrate out on permanant road. It does not say but is the normal way of doing it, The rail would be needed for chromite and not for the high grades of Noront. If noront was going open pit with raw unprocessed low grade ore being transported to somewhere like Thder Bay or Sudbury, then rail would be needed. The rail is Cliffs propaganda.

            After numerous trade-off studies and evaluations, the Project, as defined in the PA, is summarized as follows:

                <<
                -   1.0 million tonne per year throughput rate;
                -   underground mining of the Eagle's Nest Ni-Cu-PGM deposit;
                -   all major facilities (including the mill) would be located
                    underground;
                -   tailings would be stored underground as cemented fill;
                -   minimal surface disturbance;
                -   construction aggregate would be sourced from underground waste rock;
                -   the existing winter road from Pickle Lake to Webequie would be
                    upgraded to an all-season road;
                -   a diesel power plant would be located near Webequie and a
                    transmission line would provide power to the mine site;
                -   a slurry pipeline would be used to transport concentrate from site to
                    a filter plant located near Webequie;
                -   initial mine production would be from an internal ramp; and
                -   a winze (internal shaft) will be developed by year three to access
                    the lower levels of the deposit;
                >>
            

            The planned infrastructure includes an all-season road, power line, and winter roads during construction. This infrastructure will benefit other companies and local communities. Although the Project could carry 100% of these costs, the PA assigned 25% of the all season road, 50% of the power line and 50% of the winter road costs against the Project.

            The submerged slurry pipeline and power transmission line will greatly reduce traffic between Webequie and the Project site, eliminating the need for all season road access. This, in turn, significantly reduces the Project's environmental impact on the wetlands. The Company believes that all construction materials can be transported to site utilizing a winter road network and critical spares can continue to be transported by air.

  2. You have written another good peice of information anout winter roads and isolated places. As a young teen one of my interests was watching the planes fly in and out of Kenora to supply northern communities. The main one being Red Lake. Then came the highway north from Vermillion Bay. There was talk that the air lines would fold. They didn't. There was a big growth in the tourist industry and fishing camps became a big thing. The planes continued to fly and supply these isolated places. These winter roads you describe also sprang into use just as you describe so well.

    This puzzles me " (alas, resource extraction people think that the best winter is the coldest winter... sorry folks). " You do not explain this statement. From my experience, this is both right and not so right. It depends how that coldest winter comes. Snow is the big factor. As our lakes freeze, the worst thing that can happen is a lot of snow as the ice is forming. The snow weighs the ice down and water flows up along the ice and makes a lot of " slush " ice. This is not strong ice. If we get a lot of cold snow free weather and we get a strong measure of ice before the snow, then ice roads are much better. The same is true with swampy or boggy areas. Too much snow acts as an insolator and no matter how cold it gets after a heavy snow, the frost does not penetrate deep enough to support heavy vehicles. Even snowbobilers have trouble with these areas under these conditions early on. So snow before the cold isn't so good but cold before the snow is ok. Since a lot of our snow early on is lake effect snow, we tend to have less snow when the cold comes first. But those Colorado lows can also mess that event too.

    How does this tie in with your comments? I realize your explanation may not tie in with what I am saying.......sincerely, Liz

  3. And "cold is better" as a generalization is also pretty accurate in the sense that snow doesn't generally form in large quantities when the temperature drops under about -18 to -20 Celsius. To be clear, it IS still possible for it to snow, but the chances are significantly reduced. The amount of water vapour in the atmosphere at saturation drops quickly as it gets colder than that, so traditional snow becomes less likely as it gets colder. Of course, at temperatures even lower, you can still get a different type of snow from clear skies when dust acts as the catalyst and ice crystals form around the dust.

    But the biggest, fluffiest snow tends to fall when it is below -15 and freezing.

    1. I do believe this year will be one of the better ones as regards ice and snow in the ROF. I have been following the weather in webequie, and we had little snow cover and temperatures to -35 for a good portion of the last month, and the temperatures still remain in the minuses. Ideal weather for our purposes.

      Best egards

      K

    1. Just having a little fun with you. A few years back I worked in Fort McMurray during the winter. It was always below-30 and one morning -42. There were about 6 or 8 construction carpenters from Vancouver. I asked one of them why they were working up here when they could be working in vancouver. The weather would be better and no -42. He told me this was better working weather than in the rain. Until you work in the wet stuff, you don't know how cold wet can be. I got his point.

      I have no doubt those people working in the Ring of Fire would rather drill in the winter any day. I know there are no black flies......Liz

      1. He told me this was better working weather than in the rain. Until you work in the wet stuff, you don't know how cold wet can be.