Cliffs NEWS .. Good stuff..

BMO InvestorLine Alerts

Cliffs Natural Resources Inc (CLF:NYSE) - News Alert

Cliffs Natural Resources Releases Northern Ontario Chromite Project Information to Facilitate Stakeholder Discussions


<<


>>

Cliffs Natural Resources Inc. (NYSE: CLF) (Paris: CLF) today, in connection with its ongoing discussions with stakeholders, released preliminary project information for potential development of its Black Thor chromite deposit in the McFaulds Lake or Ring of Fire area of Northern Ontario.


<<

(Logo: http://photos.prnewswire.com/prnh/20101104/CLIFFSLOGO )

>>

Cliffs Chromite Project involves the largest known North American chromite deposit, located in one of the most remote areas of Ontario, the Far North. Exploration to date has consisted of geophysics and diamond drilling to delineate the Black Thor chromite zone. The current inferred mineral resource estimate indicates the Black Thor deposit contains approximately 69.5 million tonnes at a grade of about 31.9% Cr2O3.

The project information released today presents a 'base case,' which reflects one set of realistic options for the major inter-related components of the project - from mining of the chromite ore to ferrochrome production. These 'base case' project components do not necessarily represent the final design, location or scope of the project. During the course of prefeasibility, feasibility and detailed design studies, other viable options may be identified and considered.

"Cliffs is currently conducting pre-feasibility studies to more accurately determine the viability of this project," stated Bill Boor, President, Ferroalloys. "Our work has progressed to a point that enables more detailed and meaningful stakeholder discussions that will impact our decisions about the project."


<<

The 'base case' includes the following major inter-related components:

-- An open pit chromite mine with associated housing and other proposed
infrastructure located at the site. The mine may transition to
underground mining in 10 to 15 years after mining begins. Further
testing and mine planning is required to determine the timing of a
transition to underground mining.

-- An ore processing facility to produce concentrate and associated
load-out facility located at the mine site.

-- An integrated transportation system to link all project components.
This transportation system will include a permanent all-season road to
allow the movement of people, equipment, supplies, lump ore and
concentrate to and from the proposed mine site and the existing Ontario
rail infrastructure. The evaluation to date has included a comparison
of road and rail options within several transportation corridors. The
northern extension of Road 643 from Nakina has been identified as a
realistic and viable option. Accordingly, an all-weather road in this
corridor was included in the 'base case.'

-- A ferrochrome production facility (FPF) utilizing closed electric arc
furnaces to manufacture ferrochrome. The availability of a large,
reliable, long-term and cost-competitive supply of electricity is a
requirement for the FPF. Current estimates of the furnace requirements
are approximately 300 MW. The Company has identified only a few places
in Northern Ontario where this power requirement can be met. A
brownfield site within the City of Greater Sudbury was identified as
the 'base case' location for the FPF. Cliffs has plans to continue to
meet with other northern municipalities, including Thunder Bay,
Greenstone and Timmins, to continue discussing the potential of
locating the FPF in their community.

>>

"At current provincial power rates, there isn't a location in Ontario that is economically viable for Cliffs to build the FPF. Despite this, we have named Sudbury as the 'base case' location, which we believe is representative of a technically feasible site," said Boor. "The viability of an Ontario-based FPF and final selection of the location are still being evaluated."

The pre-feasibility study for this chromite project is expected to be completed by September 2011. If the pre-feasibility report is favorable, a full feasibility study would begin immediately afterward and is expected to be completed in late 2012.

"Assuming prefeasibility and feasibility studies are favorable, we expect to begin production in 2015," Boor noted. "In order to achieve this target, we will continue our discussions with First Nations, interested individuals and all levels of government. We continue to be very excited about the potential to develop this project for the mutual benefit of Ontario, the First Nations communities and Cliffs."

Join the conversation about Noront Resources.

Reply

Replies

  1. All I can say is WOW!

    Cliffs rips a press release off at 7:30 p.m. and schedules a conference call for 8 a.m. tomorrow complete with slideshow included.

    This must be hitting the digestive tracts of a few Ontario politicians tonite. Oh ya.... these guys had something they were just dying to announce, didn't they?

    Too late... the cats out of the perverbial bag.

    My shares and I will be watching the soap opera unfold from here. LOL

    Best to all,

    mynot :)

  2. This transportation system will include a permanent all-season road to
    allow the movement of people, equipment, supplies, lump ore and
    concentrate to and from the proposed mine site and the existing Ontario
    rail infrastructure.

    If Cliffs thinks an all-season road is economical for chromite, it is extremly economical for Noronts concentrated ore.

  3. ...don't like this part though:

    "At current provincial power rates, there isn't a location in Ontario that is economically viable for Cliffs to build the FPF. Despite this, we have named Sudbury as the 'base case' location, which we believe is representative of a technically feasible site," said Boor. "The viability of an Ontario-based FPF and final selection of the location are still being evaluated."

    Timmins chamber president issues dire warning about Ontario energy costs

    Updated 6 days ago

    Gary Marriott says Ontario will continue to lose economic development opportunities unless something is done to bring energy costs down

    By Len Gillis / [email protected]

    The president of the Timmins Chamber of Commerce said electrical energy pricing needs to be used as an economic development tool in Ontario.

    "Energy costs are quickly becoming inhibitive to doing business in Ontario," Chamber president Gary Marriott told the Ontario Government standing committee on Finance and Economic Affairs. The committee held hearings at Cedar Meadows resort in Timmins Thursday morning. Marriott used last year's shutdown of the Xstrata Canada Met Site smelter as an example.

    "Here in Timmins we were once home to the largest single-site electricity consumer, the Xstrata metallurgical site," Marriott told the hearings.

    He said that in the years leading up to the closure, "they often cited energy costs as one of their greatest challenges to doing business in Ontario."

    Marriott said the ore coming out of the ground in Timmins now finds it way to processing plants outside of Ontario.

    Marriott also mentioned that the much vaunted Ring of Fire Chromite deposit will not provide much benefit if the ore cannot be processed economically in Ontario.

    He said the concern was not only for mining and forestry but also for energy users in downtown Toronto. Marriott quoted a report that showed a large energy user in Toronto will pay two times more for electricity than a business in Winnipeg and 1.6 times more for electricity than a business located in Montreal.

    "Our neighbouring provinces are looking more and more attractive to businesses, Marriott warned.

    "Until this is addressed in a very serious way, Ontario will continue to lose manufacturing and refining operations," said Marriott, adding that if the trend continues, Ontario will miss out on "the lucrative opportunities" of the Ring of Fire mining and refining developments.

    Marriott's statements were made in the same conference room at Cedar Meadows where Xstrata CEO Charlie Sartain predicted in August 2007 that the operation of the Met Site was in danger unless something was done about energy costs.

    1. Ontario Power Generation will produce more clean, renewable electricity by adding generating units at existing stations in Little Long, Harmon, and Kipling. It will also replace the existing Smoky Falls Generating Station (GS) with a new three-unit station at the same site.

      In total, the project will produce approximately 440 megawatts (MW) of new hydro power without creating new dams on other rivers. This reduces the environmental impacts that would otherwise be caused by new developments.

      The stations are located approximately 70 kilometres north of Kapuskasing and 200 kilometres south of Moose Factory.

      Hydro stations typically remain in service for 90 years or more. Hydro electricity is crucial to the electricity system because it can provide renewable energy on demand when it’s needed most.

      First Nation Partners
      Construction of the $2.6-billion Lower Mattagami Project is underway. OPG's Partner in the project is the Moose Cree First Nation, which will have up to a 25 per cent equity share in the project.

      For more information on the Moose Cree First Nation, visit their website at www.moosecree.com.

      Also

      Ontario Power Generation Inc. (OPG) is proposing to develop approximately 100 megawatts of renewable hydroelectric power through the construction of two generating stations on the Little Jackfish River, which drains into Lake Nipigon (Proposed Undertaking). There is no existing hydroelectric development on the river. Each generating station will include a dam with a water intake and by-pass structures, a powerhouse and a tailrace channel. Associated facilities include access roads, borrow areas for construction materials and a large temporary construction camp. Transmission facilities to connect the Proposed Undertaking to the provincial grid will be required by a separate transmitter.

      OPG is committed to consulting with the respective First Nations and Métis, government agencies, the public, and other interested stakeholders on the Proposed Undertaking. Input and comments will be considered during the environmental assessment process.

  4. We continue to be very excited about the potential to develop this project for the mutual benefit of Ontario, the First Nations communities and Cliffs."

    Hey Cliffs is coming to the ROF to benefit Ontario,the First Nations, and oh yeah! Cliffs

    Sidethree