  1. Jeez, you guys, be serious.

    319k is a normal expenditure for 165km winter road. And if anyone is talking about bridges, they mean ice bridges, which are a normal part of a winter road.

    If there was construction of an all season road, who is paying for it? A roadway capable of the kind of traffiic we are talking about to support full development of the ROF would likely cost in the neighborhood of that 319k for each km built, rather than for the whole road.

    And two bridges built already?????

    Best regards

    K

  2. "165-kilometre connector route from Pickle Lake North Road to the community"
    Connector Route is Not Winter Road as I guesstimate. If it was then they would say so, why differenciate from the other categories?

    YES, the cost assigned is very low BUT they may just be laying down gravel as a prerequisite for a proper bed. With the ground frozen it may be an ideal time to do the initial layer.

    Any how, I am just speculating and wishing, K & RH may be 100% correct. Ed.

    1. I figure,that from Pickel to Mcfalls they do not need a heavy haul road ,only a SUV road ,because this stretch will be carried by pipeline .From Pickel down to the rail head is a different story .

      BJ

      1. Seems at .71c that we are a long way from anything as yet. It is good to see more activists enter the fray. Good morning to all