There are many differing opinions on this subject, which is cheaper, which is better, the list goes on. I don't dispute over time that shipping ALL (nickel and chrome) ore out by rail will be cheaper on a per lbs basis than road. What I do dispute, is for Noront specifically, over the short term, would it actually be more advantageous for shareholders to have a road?

I was told quite frankly about a month ago that the only reason Noront doesn't care is simply because of what they'll be transporting.........high grade nickel, not chrome. Seems to me much of the argument is based on what people are invested in. Many of the KWG etc folk are invested for chrome, so rail in their opinion is the only way. The chrome is going to be a much bigger burden because of the sheer quantity. Because of this I can see why these investors are pushing for rail. But after the NR yesterday that ANL posted, I think indications are that we are likely going to see the road option. IMO Noront, at this point because of eagles nest, is the only company who is in a win/win situation no matter which way the infrastructure cookie crumbles. Road is the fastest solution and would likely garner investors a quicker buck than rail, believe it or not. On the other hand, rail is the cheapest solution for the grand picture, which will net more profit per load.

I guess it all really comes down to what company you're invested in, and what your investing time frame is. I would like to say i'm in this for the long haul, but in truth, I'd like to see some returns within 2 years. I believe many are the same. I think with Noront we're sitting pretty either way, but the more I really think about my personal investment strategy, the more i'm in favor of the road. I have said for years that I don't believe any of the juniors will "mine this ourselves" like is being portrayed. I think the whole lot of us will be swallowed up. With road I believe it is the biggest short term bang for our buck which will result in a higher buyout price.

All just my opinion.

djje

Join the conversation about Noront Resources.

Reply

Replies

  1. Road yes but it will not be the only one and it will be only a partial solution in the long run.

    Granted, for Noront just a road is fine, we can live with that. Roads are needed for the natives and for service duties for the other infrastructures.

    The railway has to go in but it will take time. Not because it is a railway but because it is the final and last solution for bulk volume. However in the mean time the native communities are voting with their voices and politicians must listen. Hence roads are likely to go in before rail and looks like power lines before all else.

    Cheers.

    1. How about? With hydro now announced then will it not be imperative that along the hydro lines there will be some kind of sevice road so the lines can be maintained? Will this not to be able to act as a rudimentary supply road to the native comunities that the hydro lines pass. Saving having to fly in all consumer products. This would then open up the idea of the federal government also commiting to some kind of rail for the mines north/south??? Port authority or 3p private and or public partnership. The service road at sometime in the future when the mines are in operation and providing a tax base could then be upgraded with available money supplied from the new tax base. I think this would solve everyones immediate concerns. Natives isolation and cheaper servicing as well as mining interests with a cheaper transport of ores. just my thoughts but seems logical...

      1. Many hydro lines that I saw have been put in place with a cut through the bush and any 'road' that exists is not really practical for our needs, imho. At least I have rarely noticed any practical roads along them. Seems to me that many lines must have been put in place with assistance of helicopters.

        However having established a path through such bush and there being a need to periodicallyinspect, or even repair hydro lines, it makes sense to use that path for a service road. Further along that thought, once a precedent is made, upgrade a service road into a fully usable one.

        Any experienced people here re hydro line construction practices? Not me.

        1. I wonder too if anyone that is optimistic about a road going in beside the hydro line has considered that we're still going into the ROF, which is a big heap of muskeg. That hydro line is going to be difficult, because the towers need support. Do they get anchored through a significant amount of muskeg to the bedrock below? I presume so. It would be a nightmare trying to bring in some sort of an aggregate base to put a tower on. I can't even imagine that that would be possible. So anyway, the builders of a line can certain use assorted types of "challenging access vehicles" such as rolligons & unimogs and tracked vehicles, I guess, to get the people and supplies into place to build the towers. But that doesn't mean that there will also be a base there for a service road. Maybe they'll use rotary wing aircraft to move the supplies and people as the line is constructed? The only positive thing that I can think about relating to a project like that would be that since it's muskeg, they might not really need to send in fallers to deal with the trees underneath.

  2. Mostly agree with djje.

    I've always said that E/W would be road and N/S would be rail. Both will be developed with road being first in order to give access to the RoF and achieve FN buy-in.

    As for the others that have posted on this, I'm confused. Am I the only one that deems it obvious that the winter road will simply be upgraded along with transmission?

    1. ANL, you are not alone:

      The discussion by us of E-W route for the road probably started in late 2009 when Lavelin was awarded a study of possible infrastructures. I was in favour of the E-W from the start not for any reason for Noront BUT for the usefullness to the natives. We need them on our side to get anywhere.

      The discussion about road probably reached a crescendo in summer of 2010 when the feasibility was awarded to Micon. The only time E-W lost any preference with us is recently when Cliffs was in favour of a road beside their proposed railway route and Ontario government seemed in support of it.

      I have always said road will be needed along E-W to satisfy native complaints because the possibilities from that front are almost endless. Road along Cliffs railway is to service the rail line and of use to few locals. I assume that most here are of same opinion. Even government officials must be having second thoughts.

      Let no one despair.

      1. Agreed that much discussion has been had over the years in favour of E/W road.

        What was causing my previously mentioned confusion was that some posts were obfuscating the installation of transmission by suggesting that it would be separate from the current winter road.

        ... and I'm still not clear about it. ha!

        1. i dont know what the road looks like but the transmission lines will be in as strait a line as possible to shorten distance...ken

        2. The important aspect is that the transmission line is going in. Whether it is along the road or in the straightest route is secondary. No need to be concerned much about which path. The path for it is determined on what is most expedient cost and service wise.

          Even though my background is electric engineering, I have nothing significant to add regarding economics of transmission line path. In other words benefits of shortest path vs easy access by road towards future servicing.
          I lean towards path along road because wind and ice damage over the life of the line probably will more than offset the cost saved by shortest path, all just my guessed at opinion.

          I also think that because the transmission line is going in, the path must have been already decided. With the decision of the transmission path they must also know that the road is also going in beside it. Ice road access is not likely to be adequate for servicing the line.

          1. "Agreed that much discussion has been had over the years in favour of E/W road.

            !. What was causing my previously mentioned confusion was that some posts were obfuscating the installation of transmission by suggesting that it would be separate from the current winter road".---ANL's post"

            2. "I also think that because the transmission line is going in, the path must have been already decided. With the decision of the transmission path they must also know that the road is also going in beside it. Ice road access is not likely to be adequate for servicing the line." --

            from Edgy's post Mar 17 (this am)

            My comments:

            The Pickle Lake Transmition Project is NR'd as $250M (phase 1 of 2 phases; - doesnt say what phase 2 is) 300km line which will follow hwy 599 from Ignace to Pickle Lake. A combination of APUC (Algonquin Power) approved financing and the Sagatary Transmition LLP (partnership of FN communities along the route) will build the line "expeditiously' (timing) and will be funded by the $3B asset (in mostly power station assets) APUC. and connect with the ON energy grid "quickly" (timing).

            Conclusion; So, the road exists; route is known; timing start is known.

            -line ends at Pickle Lake (so far); Pickle lake to NOT's Eaglesnest is another apprx 60 km and is the route?? of the proposed EW road : I assume this last apprx 60 km is the NOT FS proposed EW route???- (please comment/confirm) to the eagles nest (NOT) mine site. AND/OR a CLF/KWG mine site.

            The EW route already has the approval of six FN communities affecting NOT's published 43-101 bankable FS study. It is the financing of this FS plan that NOT/Paul Semple et al) are waiting for, subject to infastructure 'CERTAINTY' announcements (ie. government-Fed and/ON $ support) (per Paul Semple to me); and the EA approvals ((aug/sept'ish).

            It seems that the Phase 2 of the transmition project could be EW road route to Noronts mine site meaning it would be an all reason road.

            Also, as it has been pointed out by some, that this phase 2 power line route/road would lower NOT's FS costs materially and provide land transport for mine build eguipment/materials/people; and accomodate/ensure the mine build/production timeline for a end of 2016 start date.

            Its (the pwer line corridor announcement) is a start for the "certainty" statements by government(s); but more "certainty" announcements will be needed (such as the commercial cost of power; CLF's contribution; FED $ contribution; EA approvals (timely); FN legislation//FN approvals. The $$ money alone will do it for sp blockers, imo.

            I dont expect anything in the mar 21 fed budget re RoF specifics, but hope there will be money allocation placeholder space for FN/north-ont and RoF references- ie.(details to follow for local FN/Prvincial and Fed photo op announcements to follow the budget/sell the budget phase).

            Given Clements Fednor point man roll, recent speaches/innuendos, i am optimistic for some certainty announcements. As i said prviously, the pwer lines NR was a manditory, tangible "certainty " announcement start.

            The "Bridges" NR realeased a couple of days ago was a re-release of old news for the repair and maintenance of 11 bridges and some roads which have fallen into disrepair due to lack of ON maintenance funds. No new money was anounced; ie no new bridges. politicians always re-announce already committed funds as new funds/new tangible action. It was a bit interesting that a minor Fed Minister of Transportation was in attendance to assit the local MP and Ont's Gravelle make it look like that somethig tangible (ie "certainty") was actually happening. The Fed guy was there to protect/get credit for his half of the Fed funds already announced over two years ago. Provides optics of actual "certainty" action? No.

            Gravelle knows a provincial election is coming soon, and he is already in re-elction mode, and his party will lose power, The competing ON parties elctioneering promises dont count as "certainty". Especially the lberals.

            Peter


  3. "Ignace to Pickle Lake is 300 km and from Pickle lake to Webequie Staging area is at least another 300km."-- Bennett

    Your right, my bad.

    The Pickle Lake to Webequie is about 300km and could be the tba Phase two portion of the NR announced transmition line. The Webique to mine site was the apprx 60km road i meant to refer to,- to complete the Hydro Line. My "certainty" premis still stands, and I hope the Phase 2 APUC announcement is the second 300km leg, and could even include the remaining 60 km segment,....... Maybe in the ON budget (April.?? according to Wynne.

    Thanks for correcting my error. Peter