ReplyI have also not looked at it until now.
What cought my attention is page 9:
Noront Financing Requirements $CDN(000)
Pre-Production Capital
Mining $ 195
Processing 113
Site-Infrastructure 100
In-directs 158
Contingency 44
Initial Working Capital 30
Interest and Fees 40
Total $ 680
This is thousands of $s, did they not mean millions? I think so.
Also if so, then In-directs of 158 million, does that not mostly represent the road costs?.
The heading is "Noront Financing Requirements $CDN(000)"
Then...."Pre-Production Capital"
Total $ 680
Edgy...you ask...
"This is thousands of $s, did they not mean millions? I think so."
My guess....and I havn't looked at the report....is it is in fact 000's...and that once they get into the actual production capital phase, then, you could add a few 0's
But for now, there is no current Financing Requirements for production as the environmental approval phase has not been completed yet
It will be a hard sell from here where capital requirements will be multiples of our current market cap. Let's hope that the environmental approval, agreements with the various FN groups, and specific commitments by the government will greatly enhance our market cap. A turnaround in the nickel/copper/PGM's markets will help as well.
Sudbury, I still think they are missing 3 zeros, meaning millions of dollars because:
1. Preproduction to me means construction of mine and ramp and both are unusable for any extended time without road transportation.
2. The dollar numbers as to costs seem dead on IF they are in millions.
I interpret:
Mining = actual mine construction & equipment for processing of ore (crusher etc.).
Processing = equipment for digging and handling of ore
Site-Infrastructure = construction of ramp, i.e. underground access
In-direct = roads and clearing of terrain
Working Capital = salaries
Contingency = margin for what ever could come along
Anyone agrees or am I lost in the woods? Ed.
EdG
1. Slide 9: 3 zeros are missing, they could have labelled it as (M) rather than (000). Go back one slide, slide 8 says Initial Capital (2012) = $609M, the slot for 2014 is left blank, presumably this is the $680M (Million) due to inflation, or for some extra items?
For sure it's millions on slide 9.
2. Your interpretation looks reasonable as a first guess.
Got a few comments
- Wish that they could give a bit more details, since it is not clear if NOT still goes for the slurry pipe or build a permanent road from Webequie Jct to the site @ 100% cost, and the portion from Webequie Jct to Hwy 808 would be 50% share with others (Prov, other miners). According to the KWG map showing NOT EW road and KWG Alternate EW, the 200km initial section from Hwy 808 to Webequie Jct would cost some $80M, and the last 80km portion to the site would cost from $14-18M for an ice road, and perhaps quite a bit more (~$80M?) since it is in the swamp. In addition, it's not clear which route NOT will use, since they recently announced a new section from Marten Falls to the RoF. Hence, the road cost (In-direct cost) is difficult to determine.
- The $44M contingency looks reasonable
- Interest and fees: $40M is lucrative for some financial institutions.
- IMO, NOT Nickel project is a nice a neat and profitable package. If NOT would trim down some of the costs, e.g the permanent roads and the pipeline, and just produce the concentrate, stockpile it and take it down to civilization on ice roads. Let the governemnt sand the FNs sort out the permanent road since the project could be fast tracked without having to wait for this road item to be resolved. Because of the relatively smaller volome of the 10% Ni concentrate compared to chromite, it should be possible to transport the stuff out by trucks.
- As far as power is concernned, the fastest route is to go for the conventional diesel generator (would require some ~25MW to power the site?). It would take years to get the power line up. Wind and solar power sound nice but they cannot provide base load to support a mining operation. Webequie has experience with diesel power plant, it has a good facility near the airport. If additional power is required they can expand the facility, or the government can string a ~80km line from NOT 25MW generator to Webequie for some back-up power (to be paid on a as needed basis) to the community, a win-win situation for everyone.
goldhunter
Edgy,
I am 99% sure the numbers would have to be in millions. Although not important your breakdown for the costs centers are a little.
Typically for an Underground Ramp mine the breakdown in costs would be the following
Mining Capital costs would include: All underground mining equipment, Portal Development, Ventilation fans and raises (heaters if required), All underground Electrical Infrastructure Underground Capital development (typically all development in waste required to produce tonnes in the following year), Underground Infrastructure (refuge stations, Shops, escape ways etc), All underground Dewatering and Process water, Backfill infrastructure (although this can be covered by the Processing side) etc. 195 Seams very low in my opinon
Proceessing: Crushing, Grinding, Flotation, Dewatering, Electrical, Process water and Con Storage etc. 113 seams low considering the concentrator is underground.
Site-Infrastructure: Road Access, Landing strip, Housing , Explosives plant, Sewage treatment plant, Effluent treatment plant (although this can be included in the processing) etc.
In-Directs: EPCM (usually 15%-20%), Freight, First Fills, Vendor Reps,etc
Working Capital: Cash on hand for operating costs between end of project phase and sale of con (usually 3-6 months)
"...Not me, I just know what a shovel is..."
Just to be sure, Edgy...
Skill testing:
1- Which end of the device is required to hit the ground? a) the tip ending with a flared hole; b) the end with a curved blade; c) none of the above; d) either end is ok
GLTA!
:D
This one I for sure do not know:
"a) the tip ending with a flared hole"
So it must be d), electronic engineer retired speaking here, lol.
But the last time I tried to plant a few shrubs I managed to swing the handle end between my legs. Needless to say it was umcomfortable. Understand am 65+ and on occasion before difficult or undesired tasks I do imbibe into flavourfull wines so some tasks do not go as smoothly as they should but am always in good humour. Even unpleasant tasks have their pleasant sides.
( sorry I can not attend the annual Classic and meet many of you because I spend end of summers in Europe.)
I wish to all of you plenty of patience and good humour with you investments. Still more trying times ahead but many of you must be seeing the light at the end of the tunnel, Cheers. Ed G.
Replying to @Edgy
"But the last time I tried to plant a few shrubs I managed to swing the handle end between my legs. Needless to say it was umcomfortable."
I can easily feel the incomfort ... greeting yourself with a self-imposed "Lucic"... Ouch!
Take care and have a good week-end!
GLTA :D
I like the comparison between the two company's too. The only real difference between the two projects that i notice is the infrastructure to suite . And of course the valuation. Can the infrastructure make that much of a valuation change if every thing is similar, what are we missing here? Why would we not enjoy the same or simular valuation, whats wrong with this picture?
Infrastructure, or lack of, means as much of a difference as we were with and without a blockade by the natives.
Just look at the life of a mine chart and note the valley between discovery and production. The cause of that valley is lack of infrastructures such as mines, transportation, communication and power, and of course it also means the lack of cash to pay for them.
Once the confidence arrives that such infrastructures will happen, they do not need to exist by then, enough that permits and financing is arranged without any expectant incumberences, the share price flies.
By the time the mine is operational most of the sp gains are usually there. What adjustments in sp occur afterwards is due to the actual profitability of those operations, ex. metal prices, strikes, etc.
Just my observations. Ed.
Thanks for this Cupper.....
Here's what I got from that, besides the current finances....
- Eagles Nest will be in production in 2018 ; in late 2019 there will be furthur expansion at Eagles Nest ; in 2020 the first stage of Chromite production ; in approx. 2022, furthur expansion of Chromite ; in 2024 Thunderbird begins production ; and in 2025 new Nickel exploration.
- Eagles Nest will produce approx. 10.2% Nickel grades, 5.7 Copper grades, 5 gpt Platinum, 19 gpt Palladium and 1 gpt Gold.
- Bulk materials will be mobilized to Eagles Nest over winter road this winter
- Blackbird will have shared infrastructure with eagles nest and will produce approx. 1-2 million tonnes per year in an underground chromite project ; 600-1200 kilos per ton of high grade concentrate which may become 300-600 kilos per ton of high carbon ferrochrome.
- Infrastructure will kickstart round two of a claims and exploration rush. ROF is currently poorly explored.
This is all from the corp. presentation. Thanks again Cup !