Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading poet 2020’s reply in this thread.Jump to it

VEEP3.1 rating from 232 members5.2K ptsRate

Burn Rate Clarification

Some people on this board do not understand that Cash burn rate and Operating Loss are totally different.

See below :-

Q1 Loss was $3.2MM, but you need to back-out non cash compensation ($792K) and amortization ($596K) to get the actual cash burn rate = $1.8MM

Q2 Loss was $4.6MM, but again back-out non cash compensation ($1MM) and amortization ($650K) = actual cash burn rate of $2.95MM. Note also the capital spend in Q2 for equipment and patents was just over $1MM.

So actual average cash burn rate for Q1+Q2 was circa $2.37MM per quarter.

At current burn rate  we have a cash runway into Q3 2019.

Sales start in early 2019.

One (1) $30MM sales agreement (a drop in the ocean for our products) at 50% full margin would make POET break-even which equates to zero cash flow burn rate.

Then there is the warrant money; one can expect a good chunk of that to flood in on a NR of a decent Sales agreement.

I am not concerned about cash in the near term.

 

 

 

 

Join the conversation about POET Technologies Inc.

Reply

Replies

    1. What is the most important reason to own POET right now? It is because they have a platform that will provide a new way of building optical interfaces at lower cost, at lower loss, at lower power and can be performed in a CMOS fabrication flow without manual alignment. The process allows for very high volume production without the multiple steps that are required today to build an OE interface and this also means that installed capacity to meet global demand can be placed on line very quickly.

      So we have all been waiting to hear that they can build it but until they have it built the market is reluctant to give them credit for the disruptive process. You don't have to read between the lines to see that they are on track with this statement

      We anticipate demonstrating the superiority of our solutions with the shipment of prototypes to customers later this year.