Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading dzruk’s reply in this thread.Jump to it

Treasurer2.6 rating from 68 members5K ptsRate

Semi article

Please poet I emplore you to sell actual products. You can innovate on the side but please actually sell something at high volume before moving to the next shinny rock. We have seen this way too many times over the past few years. Everyone thinks we are close and then the rug gets pulled because there is something new you are trying to create. 


Please sell something at very large volume first. 

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. Imploring Poet to sell in volume is often done here. If it were up to Poet alone, I'm sure they would have loosed the instruments of mass production some time ago. Unfortunately, Poet has to wait for their customer to give them the green light. 


    Apparently. SPX as currently structured did not see a reason to go full speed ahead on preparing for mass production  - that would indicate to me that Sanan knew it would take time before a customer would be in a position to pull the trigger. 


    The above is a big part of the reason I am disappointed with the share price - while we did well today, it was a downer for me. 


    Some of the intelligencia here "promised" or at least forecast a happy holiday season as a result of Poet's share price.  Well....

    1. Agree Babaoriley. 


      I just don't want us to once again innovate without actually selling anything that we have created. Please sell 800G en masse before moving to the next big thing. 


      I know it is not up the POET entirely but not having an actual partner with skin in the game has been a real issue because they just keep asking for things and never actually buy anything. This needs to change somehow. 

    2. I'm not very suprised about the share price action today since we had no news. 


      Also, do we know anything about SPX's current production? I thought the Summer 2024 blog post (which I can no longer find on POET's website) talked about them working on some stuff for the Chinese customers like Zktel? I'm not sure if that was just sampling orders or mass production for some of the lower end 100G products. 


      1. It would be difficultvto believe that SPX mass produced and sold anything without us getting word.  Patience. How I hate patience. LOL

        1. Well I found the blog post, turns out I just didn't scroll down far enough!


          Here is the excerpt for SPX: 

          SPX has 38 employees as of June 2024 and is working to fulfill sampling orders for POET’s China-based customers (ZKTel, BFYY, and FiberTop). SPX is prepared to assemble, test, and package POET’s optical engines and optical transceivers as demand for volume production arrives, which is expected in 2024.


          So key word is "expected." I'm assuming POET probably would've mentioned a production order, even if POET wouldn't have seen the revenue (at the time).


          As far as why Sanan backed out, maybe because they didn't have the rights (and weren't going to get them) for the 800G modules? There probably isn't a big future for lower end stuff SPX did have the rights to. I

          1. Per the SEDAR filing from earlier this month: 


            "At the present time, the role of SPX does not include volume production of any optical engine products for the Corporation." 



            1. Replying to @digicat

              What exactly has been happening at SPX for the past few years is the big question. Would be nice to know when or if volume production is going to happen at SPX. 


              I do hope Poet becomes more forthcoming with information because as investors we should not have to be guessing at these things. 


              Always a lot of questions and not many answers. 

              1. Replying to @sunshineinthecity

                As Baba just said, looks like we will need some patience! I would say it is a matter of "when" not "if." I don't think POET would assume control of SPX and just let it sit idle. 


                Unrelated, but I did see an interesting tidbit in the SEDAR filing from earlier this month: (bold is mine)


                "Although the Corporation is not currently taking any active steps to explore potential
                acquisition opportunities, it expects to do so in the near term. Growth through acquisition is common in the technology sector, and often required in order to achieve both technical and market penetration objectives."


                What is Suresh thinking of buying? 

                1. Replying to @digicat

                  May be interesting to some but would likely require even more capital and thus more dilution. As I stated before. Please sell actual product and since we now have a Chief Revenue officer. I sure hope he has something to do and compile large revenue and not just a title to keep us from thinking we are still a ways off. 


                  Please surprise us to the upside POET. 


                  Not to mention 90k to a marketing company that needs something meaningful to market. Hopefully they have some big news coming shortly to make that worthwhile. 

                2. Replying to @digicat

                  Was that written before or after Celestial Ai acquired Rockley's IP? The second PP raise transpired before the winning bidder was announced and was a surprise as to the reason for it.  It could be that we were competing for the IP and dropped out of thr bidding.

            2. Replying to @digicat

              "At the present time, the role of SPX does not include volume production of any optical engine products for the Corporation." 


              You will recall, on October 5th 2023, POET put out a News Release proclaiming they were expanding production capacity at their Super Photonics Joint Venture in anticipation of customer demand for 2024 and beyond.  Weeks later, they went on their hands and knees to the market, where they brokered a 1.4 million dollar financing for CAD $1.22 per share.  


              I know A LOT has happened since then.  But I'm telling you, the market, and the industry has the memory of elephants. Once bitten, twice shy.  The only thing that moves the meter from here on is industry adoption with confirmed valuations.  The cold hard reality is the company and the stock have unfortunately earned a "false dawn" reputation.  The only thing that changes that is significant revenue.  

                1. Replying to @okiedo

                  I hear you okiedo. 


                  I actually purchased some leap options yesterday and some a couple months ago. To go along with my long position. In hope that this time we actually are on the right track. 


                  Lets hope for all our sake that this time is different than the last few years and we move forward with large revenue producing sales. 


                  Merry Christmas everyone and let 2025 by the year of POET. It is time! 

              1. Replying to @vanvillain

                For everyone's reference, the SEDAR filing from earlier this month talked about SPX's difficulty selling the lower end modules. I'm paraphrasing, but the market essentially moved too fast and the price for producing the 100g modules dropped below what they could sell them for.


                I would show the exact wording from SEDAR, but I'm currently on mobile. I'll see if I can find it tonight. 


                Regardless of this, I'm optimistic about POETs current plan. We appear to be well positioned to sell the 800G and up.

                1. Replying to @digicat

                  For those who are curious, this is the excerpt from the SEDAR filing dated 03 Dec 2024 (bold is mine): 


                  Upon the formation of SPX in 2020, the primary intention of the Corporation was to use SPX as a means to demonstrate the viability and market acceptance of its unique approach to integration and fabrication of 100G and 200G optical engines using its Optical Interposer and to establish an initial presence in the market. These objectives were largely achieved, as SPX supplied hundreds of 100G and 200G optical engines based on the Optical Interposer platform to prospective customers in China. Two major customers committed design resources to include optical engines produced by SPX in their optical modules. However, the design and qualification cycle with module endusers took well over one year, which was much longer than was originally planned. As a result, by the time those modules were available for sale, the market had substantially changed. Prices for conventional 100G modules declined precipitously, selling for under producers' cost. The 200G market also evaporated with the introduction of 400G optical engines, for which the Corporation was initially unable to supply designs for mainstream 400G applications. The Corporation has now developed this capability, and there is currently a robust market in China for 400G optical engines. The Corporation believes that it is in the functionality of 400G optical engines designed for 800G applications and in 800G and above optical engines that its unique approach to integration will provide the Corporation with competitive advantages sufficient to overcome drawbacks inherent in conventional approaches to optical engine design and fabrication.


                  Given the foregoing and in light of the advancement of artificial intelligence and the high demand for 800G optical engines among manufacturers of artificial intelligence networks and equipment, the Corporation expects the 800G and higher speed optical engines to constitute the Corporation's primary business on a go-forward basis. As a result, the Corporation's strategy will be to prioritize the development of 800G and higher speed optical engines over the 100G, 200G and 400G optical engines. In terms of production plans, with respect to 400G optical engines, only 400G Rx Optical Engines have been released to production and it is anticipated that such optical engines will be built by
                  SPX for consumption in China and potentially under a "contract manufacturing" arrangement for the Corporation for the consumption outside of China.
                  The Corporation is planning to build a 400G Tx and Rx optical engine capability outside of China for 800G applications, which is distinct from 400G optical engine production for mainstream 400G applications.

                  1. Replying to @digicat

                    Thanks digicat.

                    This clearly states the situation with the SPX and the plans for it going forward.

                    It also explains the reason for delays in production and revenue.

                    With Luxshare, Fit, Mitsubishi and other GTM partners, POET is in a completely different place today from a year ago, so I think it's more productive to look forward than backward at this point.

                  2. Replying to @digicat

                    Your post clears things up. 


                    From Francis Kong,  President of Success Options Inc, a LinkedIn comment that was liked by POET's Program Manger, Maricris Tura who is a non-poster and a "liker" for everything POET on LinkedIn:


                    What comes easy would not last long. And what lasts long does not come easy. There is no such thing as INSTANT Excellence and Success. You cannot microwave it.
                    In most cases, the way to excellence and success is achieved through slow-cooked and, in many cases - pressure cooked as well.


                    iAsk.AI: 

                    Who is Maricris Tura?

                    Location and Current Role
                    Maricris Tura is based in Singapore and currently serves as a Program Manager at Poet Technologies. In this role, she is likely responsible for overseeing various projects and ensuring that they align with the company’s strategic goals.

                    Professional Background
                    Prior to her current position, Maricris Tura gained valuable experience working at Denselight Semiconductors Pte Ltd in Singapore and Pentax Imaging Company. These roles have contributed to her expertise in the technology and manufacturing sectors.

                    Education
                    Maricris Tura holds a Bachelor of Science in Industrial Engineering (BSIE) from Cebu Institute of Technology, where she studied from 2004 to 2008. This educational background has provided her with a solid foundation in engineering principles and practices relevant to manufacturing.

                    Skills and Expertise
                    Her skill set includes advanced methodologies such as Six Sigma, Kaizen, Value Stream Mapping, and Kanban. These skills are crucial for process improvement, efficiency optimization, and effective project management. Additionally, she has experience in procurement, which involves sourcing goods and services essential for operational success.

                    In summary, Maricris Tura is a skilled professional with a strong educational background and significant experience in program management within the technology sector.

                    Me: She also has career experience with sales which is a bonus.    

                    1. Replying to @breadandcircuses

                      Our next offering closes on Dec 19th, so it will be interesting to see if POET has any updates to share within the new SEDAR filing. 


                      POET did state the 400G Rx Optical Engines are released to production, so I wonder if we will be seeing POs soon for those. We know per the SEDAR filing that POET sees robust demand for 400G within China. Granted, POET also said they want to focus on 800G and up, so maybe they won't expend precious

                      resources on 400G. 


                      It isn't quite clear to me if POET is sticking with their revenue by end of 2024 projection they made in a PR back in August 2024. I'm mainly looking at the light source product line because I wouldn't expect us to sell any of the optical engines in the next 2 weeks. The clock is ticking on that, so I'm guessing no. The SEDAR filing did show "Prototypes: Q4 2024- Q3 2025" for "Light Sources for Artifical Intelligence" so that is pointing towards no Starlight revenue. If anyone has any insight for this, please chime in. The inner optimist in me thinks Prototype may still equal revenue because we would be giving Celestial AI some initial stuff to work with. So it wouldn't be huge revenue, but still something. 


                      With all of this, POET has clearly been working in a rapidly changing landscape. Despite this, the company has still acheived quite a bit IMO. Looking forward to 2025!

                      1. Replying to @digicat

                        I'm expecting the 2024 revenues , that was a very bullish statement a little over 3 months ago.


                        Expect results. Hopefully a better day tomorrow. QUBT style wish I owned that.


                        Budfoxy

                      2. Replying to @digicat

                        "The inner optimist in me thinks Prototype may still equal revenue because we would be giving Celestial AI some initial stuff to work with. "


                        I'm an inner optimist. Your optimism shows pretty clearly. Mine is so well covered up! LOL


                        Digicat, your posts are excellent! Thank you! 


                        Are our customers telling us to prove to them we can mass produce? Or is our ramp up to mass production more or less parallel with the seeming eternity of the testing process?

                        1. Replying to @babaoriley

                          Always happy to help! I don't think I was even the first to mention the stuff from the SEDAR filings. I didn't really take the time to skim through the filing until the past day or so. 


                          We shall see if being optimistic pays off. I think I'm likely being awfully optimistic to expect any revenue for this quarter based upon everything I have learned. 


                          I know I've said this before, but I'm still wondering what POET is waiting on in order to release the news about Globetronics in Malaysia. POET doesn't seem to usually shy away from announcing anything that could be construed as positive. 

                      3. Replying to @digicat

                        Digicat : ... rapidly changing landscape ..
                        I agree 100%

                        And to hear the current (declining) 100-400 modul prices are below of there production costs.
                        Nobody will and can do/buy this.

                        This hit ALL other (traditional) modul manufacturer.
                        And it has great influence to the 800 modul price
                        If 800 price is similar to a 400 it is clear for a 800' decision.

                        POET's moduls are 20-30 below the current (traditional) - right ?
                        So POET can live with a lowered price level.
                        The other COMPETITORS NOT.

                        So I predict a huge shift from the legacy landscape directly to POET's products :
                        with the well known advantages, just because of the price.
                        May be "old" manufacturer will be become new customers for POET.
                        Or their customers will go direct to POET.
                        In China and beyond.

                        This scenario will be emphasized with the 1,6 moduls and even more with the 3,2
                        Which other manufacturers can achieve POET's price and technic right now, the next few years ?
                        There is a white paper as an answer - IMO

                        I hope and expect this alltogether will the transceiver market change in a huge and dramatic way :
                        There is now way but POET


                        POET go, go , go !

      2. I think that many of us have questions regarding Zktel and especially since SPX is on its way to Malaysia.

        China is supposed to be a heavy user of 100G and POET seemed like a good fit with their optical engines.


        “We have been working with ZKTel for more than a year and are pleased to announce a design win for POET with another module supplier that will go into production in 2024,” said Dr. Suresh Venkatesan, POET’s Chairman and CEO. Through this collaboration, POET and SPX have a roadmap with ZKTel that goes beyond the initial 100G CWDM optical engine sales.”


        In the production phase, SPX assembles and tests the optical engines at its state-of-the-art facility and ships optical engines to customers such as ZKTel. Customers use optical engine production samples to complete their internal qualification and start sampling modules to their end customers. This cycle typically takes 6 to 9 months before high-volume production can be expected. However, since ZKTel is in advanced stages of its module development, ZKTel expects to ramp to volume production in the second half of 2024.


        https://www.poet-technologies.com/news/2024-jan-3

        1. Since ZKTel expected to ramp to volume production in the second half of 2024 I’d say we (they) are still more or less on schedule. In case there are any delays (Aren’t there always delays?) we cannot tell at this point in time whether they are insignificant or not.


          By the way, SPX isn’t going to Malaysia. SPX will stay in China and produce for the Chinese market.

          1. My misunderstanding.  I thought we were moving production to Malaysia, but it does make sense to have some manufacturing presence in China, though I only question the political matters that could affect outsiders.  I do wish we could find out details as to what SPX is actually producing.  Possibly with consolidated financials we will have a better idea.

              1. Replying to @chunkycurd

                Yes, the part I missed.  Makes perfect sense.  I made a strange connection between Vivek leaving POET and buying 100% ownership of SPX and starting production in Malaysia to mean something else.



    3. Apparently. SPX as currently structured did not see a reason to go full speed ahead on preparing for mass production  - that would indicate to me that Sanan knew it would take time before a customer would be in a position to pull the trigger.



      Hi Baba, I don't see it this way, in fact the opportunity is enormous at 800g and beyond ....but when Sanan realized they were snookered by only having a white elephant sale at 400 and below, they had to either sell or become a outsourcer for Poet. They probably mulled their position and decided to sell. Imo

      1. The market is at 800G and above now. That is where the money is. Suresh was clear that he did not want to expand the agreement with Sanan for advanced optical engines. This ultimately resulted in an uncertain future for SPX customers. Removing this uncertainty would have been a big step in giving those customers confidence that POETs roadmap will be available to Chinese customers,

        Obviously POET has shared their plans with the funds that have taken big positions in the recent financing. And obviously the technology is what is needed by industry to advance the com requirements for AI. as indicated by Foxconn, Luxshare and Mitsubishi.

        If you believe in Occam's Razor this would appear to make the most sense.



        1. Amazing post FJ. i wholeheartedly agree.


          dare I say, but it really does seem like the time is now...im greatly Encouraged that China manufacturing will be a wholly owned sub of poet as opposed to the other way around (poet holding minority stake)

        2. FJ, if we were to apply Occam's Razor, it is telling us that the simple explanation to POET's price action is that they don't have anything to sell yet. It appears that the company seems content to continue to develop newer, ever better products but doesn't seem at all concerned with keeping the investors informed of the company's progress toward sales, or even firm agreements with the collaborators.
               ...imo, the problem with the POET SP languishing is that they apparently don't have anything ready to sell, and that they have too many people in the wrong positions. Lab people should be in the lab, and experienced business managers should operate the firm. There have been so many swings and misses by POET that it has become our favorite piñata. 
               I greatly appreciate the information provided by the more informed members of our group, and thank you for it. 

          1. doesn't seem at all concerned with keeping the investors informed


            I seriouslly doubt that applies to the two recent $25 Million investors.

          2. Gents,


            Please listen over again the video with Raju... he explains clearly what SPX (China) and Malaysia (Rest of the World) manufacturing capabilities plans are.


            He finished by we fell we answered all the questions the industry has have of us...


            Purchase orders are the next logical step



          3. It has taken a long time, no question about it. Silicon photonics has been around for decades. Why isn't Mitsubishi using a traditional Silicon Photonics to deliver an integrated EML. Because they can't. POET can and has already as demonstrated at OFC with only 5 months from start to finish with a small team.

            What do you think gave Mitsubishi the confidence to trust POET? 

            Again silicon photonics can't do it with all the years and money they have spent on the problem.

            I would love for them to be able to achieve this in a much shorter time frame but it takes time to develop these solutions.

             Complaining about it does not make it go faster.  The amount of time it takes has been conveyed by POET management. You can choose to believe in the amount of time it takes to develop and put production into place or live in an alternate reality. You seem to be making the same complaint every day. I would ask you to please stop it.




            1. Replying to @fairchijisback

              Up until this point in time POET has been constrained in their spending. I know that there are technical approaches that Suresh had to put on the back burner while cash was a problem. But I can just imagine how hard he is on the gas pedal right now. Suresh is a visionary in every sense of the word.

              1. Replying to @fairchijisback

                Do you not agree that they need to stop moving to the next iteration without selling the one prior. It is the perpetual r&d loop. 


                That is why we need to see them to cross the finish line on a product and get it to volume sales before we move to the next shinny rock. 


                We need big POs and actual revenue. Until that happens we are not going to move very far IMHO


                1. Replying to @sunshineinthecity

                  They are moving to other interations because that's what customers want, this has been explained.  Would you prefer they focused on products that are outdated and will bring little revenue, allthewhile the markets moving on and leaving us behind?  We have to trust managements judegment on this.  They are in a far better position to make this call than anyone of us on this board.


                  Right now, POET are pushing the boundaries and are quickly moving ahead of the industry.  This will be far more lucrative than focusing on selling a few 200G, 400G products just to book revenue.  Besides, lets wait to see what's going on with SPX, since I believe the Chinese market will or even has been procuring these products.





                2. Replying to @sunshineinthecity

                  A perpetual R&D loop? We are not talking about decades of development are we? But the short span that POET has been at it has brought this company to a position that others do not have a pathway to. I do not understand how some people like yourself can't see this?

                  OK so let me ask you one simple question.

                  Why is POET now producing modules and do you consider this as a shiny rock?  Will that speed up time to market or slow it down? Your response should include customers internal to China and customers outside of China.



                  1. Replying to @fairchijisback

                    Us now making modules was Stated because the costs to market for the module makers to bring our product into their fold was not benefial for them. 


                    As for whether this speeds the process we really have no idea because we have not sold any products yet or so it seems. 


                    I guess you do not agree that we need POs and volume production to get this moving to where we all hope it will go. 


                    Why we were not able to sell 100/200/400G is anyone's guess but we need to sell 800G before moving to 1.6T. This is what I mean by the perpetual r&d loop. 


                    1. Replying to @sunshineinthecity

                      Maybe go back and read up on the Poet/SPX deal, I believe we were able to produce and sell 100/200 and 400G but this was produced and sold by SPX, who had the rights to produce and sell in China and who also received the revenue for these products due to the agreement made, that they would reap the revenue in order to pay back what they had provided to poet.  This revenue did not have to be reported so what it was or is will not be known until Poet has 100 percent ownership, then all the revenue data moving forward will have to be exposed.  I could provide links to the information but I don't really want to spend the time finding the links, as I already understand the jist of it.  

                      1. Replying to @pw1

                        I completely understand this was through SPX. As others than me have stated. It does not sound like SPX ever got to more than sampling. If they come out with a report stating they have been in volume production at SPX I will eat those words but it certainly does not seem to be the case. 


                        I do hope that we have orders in China for SPX to stay busy but those POs remain to be seen. 

                        1. Replying to @sunshineinthecity

                          A simple AI search uncovers ZKTel, also Fibretop comes to mind but unfortunately we were not privy to the information about production size and revenue and may never be.


                          "Several Chinese companies have purchased POET Technologies products through Super Photonics Xiamen (SPX) in China. - ZKTel: A major Tier 1 module supplier, ZKTel has ordered POET's 100G optical engines for their optical transceiver modules ¹."

                          1. Replying to @pw1

                            As Digicat pointed out, there have been SEDAR filings in the last few months that explain SPX in great detail along with historical financial information. Revenue was neglible across all products and they were giving away samples for free, which is normal practice. Most of the revenue to SPX was actually POET purchasing engines from SPX. 


                            I posted links to the filings on this forum when it happened, but I can't seem to access my old posts with the new website. 

                            1. Replying to @photonics enthusiast

                              It is my understanding that the sales made through SPX that were not sold to Poet are not required to be publicly disclosed, so I don't believe they would appear on Sedar, I guess time will tell.

                              1. Replying to @pw1

                                So, if in fact SPX did have sales of legacy products throughout China and you're POET, why wouldn't you want to publicly disclose them?


                                Would that not be helpful in supporting acceptance of the underlying and overall technology that has and is being developed?


                                Wouldn't it also possibly support the underlying market capitalization of the company thereby enhancing the ability to raise funds at rates that mitigate overall dilution and transactions that are more palatable to shareholders?


                                The sp has shown nice recovery during 2024 but I am confused on the communication policies that are in place. Just don't get it for a publicly traded entity.

                                1. Replying to @hogan

                                  The clear conclusion is that they never sold mass produced legacy products.  Otherwise we would have heard. That's Understandable if the legacy products became so cheap as to no longer be economically feasible to mass produce and sell. 


                                  I just hope what we're producing NOW don't turn into legacy products. Given the companies were currently engaged with, I think we're fine. Speculative, but fine. 

                    2. Replying to @sunshineinthecity

                      Sunshine says

                      I guess you do not agree that we need POs and volume production to get this moving to where we all hope it will go.


                      I say, the writing is in the wall.... we have new manufacturing capability in Malaysia, why? Because the customers will not even give you an order if you don't have the wherewithal to produce it.


                      We also have a newly appointed position of  Chief Revenue Officer, what the heck is that for?

                      If he doesn't do his job..........get rid of him!

                      I think Raju wants to hang around. Just my 1.5 cents.




                3. Replying to @sunshineinthecity


                  sunshineinthecity asks:

                  Do you not agree that they need to stop moving to the next iteration without selling the one prior. It is the perpetual r&d loop. 


                  Interesting view.

                  Let me try an analogy: we are hungry (for orders), so we must eat. There is enough time for breathing after lunch...

                  Okay, we won't die hungry but our future is zero. We must eat and breathe at the same time and we can!

                  You eat with your mouth and put food in your stomach, but that must not keep you from breathing through your nose into your lungs.

                  So does POET - offer what they have while working on the future. No use in closing down the labs until outdated 100G products are sold in millions.


                  Don't let the daily SP-gazing bring you down!

                  Cheers

                  Germiston





                  1. Replying to @germiston

                    This analogy makes zero sense, eating food. Poet is in a race to the next level of development 800 and greater, they are trying to position for market share, potentially a massive share. Recent added dollars will allow for resources to capitalize 100, 200 and 400, I'm confident these will be the first products seeing POs, soon (sorry couldn’t resist that one). We all want to see sales, but the leadership in the company, the executive and the board steer the company. They will be operating with short, intermediate and long-term goals, they are having the conversations with large industry players who can move the stock tenfold. We do not want them to ignore these conversations, because they are only focused on short term goals. Short- and long-term goals are both important in a race of this nature and can go on in parallel.

                    1. Replying to @dzruk

                      I doubt we see any purchase orders for 100 and 200, the market has moved past them. Maybe 400G, the SEDAR filing said their is "robust" demand for them in China. Per the SEDAR filing, POET is placing all of their chips in the 800G and up space. 


                      The good news is none of us need to guess POET's next steps. POET has plan and they are executing on it. SPX didn't work (so far) because there was no demand for their low end products by the time they were ready for production. Suresh has said POET is finally ahead of the curve with their current designs, and we now have the ability to make 800G in China for China, and in Malaysia for everyone else who doesn't want China sourcing. 


                      POET could throw us a bone and give us an updated timeline on when everything will be ready for production. Someone has already said this before, but the SEDAR filing shows Q2 2025 as a production date for modules. POET probably hasn't advertised this because people would rather see now LOL. 


                      Overall, I think POET is doing fine. We have a plan in place to produce our products, and we had no issue getting a substantial amount of money raised to do so. I think the recent fundraising efforts speak for themselves, we aren't the only ones who think POET will eventually reach production! 

              2. Replying to @fairchijisback

                I was disappointed that the sp didn't move considerably after the rush of promotional videos over the past few days.  So, I understand frustration.  However, the 12.5% drop in sp over the past week still has POET at over a 20% increase in the past month and 477% over the past year, so I find it easy to temper my brief frustration.

                It's a lot of fun to watch the sp rise every week, but we can't expect that to always happen.

                There are SO many positive things that POET is lining up for production and revenues, I enthusiastically HOLD.