Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading timotao’s reply in this thread.Jump to it

Prez3.5 rating from 98 members13.7K ptsRate

Call It POS

SPX has morphed into POS - POET Optoelectronics, Shenzen. POS should be used as the abbreviation when referencing the new subsidiary in future posts.


It was a strategic move to have gained entry into China via the opening of its product design and development center in Shenzhen in January, 2021.


The ex-SPX equipment moving to Shenzen, the hub for photonics and optoelectronics, requires a facility for assembling, testing and packaging of optical engines. A facility or a portion of one will be acquired using the extra millions (a Breeze discovery) availble to POET. 

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. Can you please elaborate on the extra millions being used to acquire a new facility? Where is This reported?? Also where is POS reported as the new name for SPX? 

    1. My question is.....what was the rush to take another financing knowing that we have cash for at least 2 years?  Lets say that the equipment that we bought for our Malysian operations is 10M. 10M is probably too much knowing that the equipment bought from Sanan for similar task cost us 3.8MUSD today.  That leaves us with 45M$USD in cash without this new 25M financing. Seems more than enought for me.  Unless...there is something other brewing that we don't know.  We should know soon enough if this is the case. 

      https://agoracom.com/ir/POETTechnologies/forums/discussion/topics/807250-Cash-on-hands/messages/2428406

       

      POET also intends to change the company name to identify it as a subsidiary of POET and may eventually merge operations with its existing wholly owned foreign enterprise ("WOFE"), POET Optoelectronics Shenzhen Co. Ltd.  


      https://www.poet-technologies.com/news/poet-completes-acquisition-of-super-photonics-xiamen

       

      This post isn’t available.
      1. Ok I saw all of that. It does not explicitly point to us aquiting a new facility. I hope some of this money is used to buy materials for mass production. Also some of this money may be used to pay for the rent at SPX and the increased burn rate with all of the employees at SPX. (Not sure though) All that really matters is that we get POs booked shortly and actually start to mass produce at SPX or WOFE whatever it will be called. 


        The rubber needs to hit the road and if so we will all be happy I believe. If they state that production will start 2H 2025 then I am not so sure as we have seen that movie before. 

      2. It appears that I am partially correct. 

        The SPX name change is up in the air for the current Xiamen location. When it is terminated, there would need to be a new facility ready in Shenzen where a merger takes place with the current operation in Shenzen - POET Optoelectronics Shenzen. 

        1. What is the reasoning why they would not want to produce out of SPX for the foreseeable future and as they grow look for a new facility? why rush to get out of the SANAN facility? As I have stated produce product to create revenue should be top priority not moving facilities and starting over. This will just delay this process. 

          1. I'm pretty confidenthe company has figured out out the best way to proceed. So I won't speculate other than to say I think a lot of equipment still needs to be bought in China.  I don't think Sanan bought nearly all that's needed. 

              1. Replying to @sunshineinthecity

                We love to specu-wait here. I love hearing the bits and pieces that some of our more connected folks let us in on. The reasonable thing is to enjoy the ramifications but wait and see what the company announces before making definitive conclusions. 


                I even enjoy the poking an questioning, just want to make the point that the bits and pieces are mentioned in good faith, and more robust news will follow in due time. 


                There are good business reasons for holding off on operational information. For example, if they need to negotiate a lease for expansion, it puts them in a tough position to have publicly announced a need and a timeline and a city. POET should keep it guarded, keep the options open, and do things in due course, then announce.  

                1. Replying to @babaoriley

                  Yeah and let's hope that is actually sooner than later. If we are still waiting for orders with everything that has been done over the last few months it could be a long wait. 


                  I definitely hope they are planning to get production going long before  1.6T with EML's from Mitsubishi is sampled and ready for production that FJ has alluded to. 


                  With them now owning SPX outright we are long overdue with an update of what is actually going on there and when they will be producing actual products for shipment and not just samples. Also are we going to be producing anything below 800G or has that all died?