In POET's prospectus filing (which you can find on their SEDAR page), they stated back in Sept. 2024 that they anticipated "module development" to start production in Q1 2025. They also anticipated to deliver 800G tx prototypes by Q42024. 


When they updated the filing in early December 2024, the new timeline is Q2 2025 for module production and Q2 2025 for 800G tx prototypes. 


Was SPX causing the delay? I did notice another excerpt from the Sept 2024 which I have below


The Corporation is focusing its short-term development resources on completing an 800G Tx (transmit) optical engine. Once the development is completed, which is scheduled for Q3 2024, samples will be provided to customers on "evaluation boards," followed by individual optical engines for use in prototype optical modules and then, assuming that the evaluation / qualification process is successful, production orders. Several companies in addition to Luxshare, Inc., including Foxconn Optical Interconnect Technologies, Inc., have expressed interest in receiving 800G Tx samples from the Corporation as soon as they are ready. Initial production of samples of 800G Tx (transmit) optical engines are being assembled in a pilot line in Singapore by POET Singapore. The Corporation expects revenue in late 2024 and much of 2025 to be the result of the sale of such 800G transmit and receive optical engines samples to customers. (bold is mine)


Given the above statement, I can't tell if SPX was or was not the issue since the engines are being assembled in Singapore? My main reason for wondering about SPX is because up until we took full control it was unclear who was going to have rights to 800G revenue. So maybe with that issue behind us, POET can utilize SPX to it full ability now that it is clear they have rights to 800G revenue? I would imagine that the pilot line in Singapore has way less capacity than SPX, which could have been causing issues for making prototypes and planning mass production. 


To sum everything up... was uncertainty around SPX causing development delays, and more importantly does our total control over SPX mean that we now have a clear path towards producing the 800G products? 


My own personal opinion is the joint venture was holding us back, and we should be in the clear now. And most importantly, POET's projected timeline that I mentioned in the first two paragraphs should be a realistic goal. 

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. I think your assessment is spot on. I believe the background was the lack of significant sales of the 100G and 400G modules that the SPX partnership targeted initially. Suresh had wisely kept the partnership away from the 800G products, which he knew would be higher margin and the way of the future. They may have discussed including these, but couldn't make a deal, so they decided to call it a day on the initial partnership, and Sanan walked away. It looks like a win-win, and Sanan can convert debt to equity in POET, and the cash to acquire SPX was minimal. 


    The new partnerships with FIT and Luxshare and Mitsubishi may have created pressure for POET to show manufacturing capability to hold up their end oaf these collaborations. Coming to the table with pilot-made optical engines is not the same as demonstrable throughput in a high production setting, which is what the SPX and Globetronics deals will prove. From there it is a copy and paste to raise the capacity to whatever the big partners need. Big partners love predictability from their shiny but small collaborators.  Nobody wants to write checks without predictable costs in focus.

    1. Sanan was an obvious heel-dragger.  You could sense that very early as they fiddled on making their cash contributions. 


      I've been watching a lot of TV over the past 5 years or so.  Lots of recording. I often wish we could record the Poet story and run it back with the use of fast forward!!!!  

    2. Sanan got a pretty good deal in my opinion when you consider that they were likely never going to get the rights to 800G and up. Sanan doesn't have to do anything at this point, and they can still benefit from the 800G and up sales if they decide to convert the payments into POET shares.