Timeline until 2H/2026

Many are asking here why it takes so long — why POET’s production shipments are only scheduled for the second half of 2026. Here’s my take on what’s actually happening and why this timeline makes perfect sense. (Disclaimer: the text below has been developed with some back and forth with ChatGPT 5.)


Since March 2025, the customer has done the qualification tests on POET’s optical engines. This has been done with evaluation boards fitted with the engines. These setups are used to test the engines in isolation — measuring optical power, thermal stability, signal integrity, and overall performance under lab conditions.


Over the past months, those tests have confirmed that POET’s devices meet the technical specs and are ready to move from lab validation into real product integration. That successful evaluation phase is what led to the new $5 million production order.


Now we’re entering the industrialization phase. The customer — be it Luxshare or another systems integrator — will begin building its first pilot batches of full transceiver modules using POET’s production-grade optical engines. These are no longer the early engineering samples from March but the final, process-stable versions produced at NationGate and Globetronics.


The purpose now is to prove that the modules can be assembled on automated lines with consistent optical alignment and acceptable yields. This is something the customer has to do; POET will support if needed.


Once those pilot builds are stable, the end customer — Meta, Microsoft, or another hyperscaler — starts its Customer Acceptance Tests (CAT). That’s when the modules are tested under real data-center conditions: signal quality, temperature variation, interoperability, long-term reliability. CAT typically takes three to six months. Passing it means the modules are officially approved for deployment.


In parallel, POET and its manufacturing partners continue ramping up production readiness — fine-tuning processes, locking down QA systems, and scaling capacity for volume output. By mid-2026, everything should be ready for the production release.


Assuming CAT goes smoothly — which is highly likely, since no one places a $5 million order without already seeing strong results — POET begins volume shipments of its optical engines in 2H 2026. That’s when the customer’s transceiver modules start shipping into AI and hyperscale data centers, and when POET begins booking meaningful revenue.


From there, it’s about scaling. Once yields are stable and performance proven in the field, follow-on orders usually multiply — and next-gen products like 1.6 T or co-packaged optics can follow.


So yes, the wait feels long, but this is how advanced photonics moves from prototype to production. The next twelve months are all about execution.

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. @rainer, what you posted aligns perfectly with what Suresh said in his most recent interview,


    "Venkatesan: We’re focused on growing the business, so yeah, you can look five years out and try to make projections of what the company is going to be like. But I think we’re focused on continuing to win customers, and honestly, technology doesn’t mean anything unless you can manufacture it. So our focus really this year has been to cross that last hurdle of ensuring that the technology that we’re developing is truly manufacturable at scale and at wafer scale. That’s where our focus has been. So we’re going to transition into manufacturing next year, continuing to win more customers and really deploy our technology in the scale-out region and where we’re seeing very, very high-growth trajectories in 2027, especially for co-packaged optics. And we’ve got a technology that is resonating very strongly with customers.


  2. "The purpose now is to prove that the modules can be assembled on automated lines with consistent optical alignment and acceptable yields. This is something the customer has to do; POET will support if needed."


    Rainer, so you feel the above will be accomplished by the end of this year or very early in 2026, which then means CAT starts at that point and is finished sometime near the end of quarter 2 of 2026.  At that point, assuming CAT goes well, the end user will place the much larger order with our customer, our customer will place a much larger order with Poet, and Poet will begin mass production at that time and continually ship finished Poet devices to its customer who will assemble the completed device which is then delivered to the end user. 


    I assume something like deliveries to the end user every month or so from the time of first delivery by our customer to the end user until the order is fulfilled. 


    Rainer, is the above what you currently foresee?  

    1. Babaoriley: Rainer, so you feel the above will be accomplished by the end of this year or very early in 2026, which then means CAT starts at that point and is finished sometime near the end of quarter 2 of 2026.  At that point, assuming CAT goes well, the end user will place the much larger order with our customer, our customer will place a much larger order with Poet, and Poet will begin mass production at that time and continually ship finished Poet devices to its customer who will assemble the completed device which is then delivered to the end user.


      Yes, that’s my understanding. The pilot and line qualification phase at the custumer (e.g., Luxshare) should wrap up by late 2025 or very early 2026. CAT at the end customer (e.g., Meta) would then start immediately with module produced at the production line and run through about Q2 2026.


      During this period, POET continues producing small pre-production lots to confirm process stability and yield, while finalizing test automation and QA for full ramp-up.


      When CAT is successfully completed, the end customer (e.g., Meta) places the large production order, the module maker (e.g., Luxshare) scales up assembly, and POET begins continuous volume shipments.


      If CAT were to fail — unlikely at this point — production pauses, the module maker and POET analyze the cause, make whatever adjustment is needed (usually minor), and rerun the test. That would mean a few months’ delay, not a cancelled program.

  3. Trying to understand. 

    Poet ships to their customer 2nd half of 2026

    Their customer ships to meta etc. Sometime after.

    Meta etc spend 3-6 months doing CAT before ordering more?

    Does that put us mid 2027 for follow on order?

    1. I think Rainer is saying that all of the testing is ongoing right now, and the 5 million PO is for the production ready optical engines which will be delivered in 2H2026. 


      The customer acceptance testing will be ongoing in the first half of 2026. Maybe the 5M USD PO is from the same customer that placed the $500K USD PO? Just a guess on my part, since the customer can use the optical engines from the smaller order to do all of the required testing, and then proceed with the larger order once everyone is happy. 

      If my theory is correct, I'd expect many more smaller POs to be announced soon as all of POET's customers prepare their transceiver modules (containing POET optical engines)for mass production.