the key is scale
Lets use Meta's 15M 800G transceiver module need as reference.
POET current projected optical engine capacity is 1M by EoY 2026. each 800G tranceiver requires 3 optical engines. Assume 100% output is allocated to Luxshare, which sells 100% of these modules to Meta, thats about 330k/15M, or about 2.2% of a single hyperscaler customer's need.
Yeah thats right. POET does NOT have the ability to serve as a substantial supplier to even a single hyperscaler customer within 2 years.
The good news is nobody else can meet all this demand either. The industry expects a shortage and if POET has the advantage in cost, power efficiency, and can ramp faster than conpetitors, likely everything will sell out immediately.
They must have a fully qualified and copyable process setup and running at high volumes to prove themselves as a player at big scale.