I try to figure out what would it mean for POET's competitors to develop an own (POET like) PIC and gave chatGPT in a new session just this only question :
Many transceiver manufacturers still use traditional manufactoring methods – that is, with discrete components and many manually steps to do.
Some are beginning to evolve towards photonic integrated circuits (PICs) at wafer-scale.
POET Techn., with its PIC technology (= optical interposer/engine; as a transceiver or as C2C/CPO : DSP-free with minimal latency, lower power consumption/heat and high performance) has already secured initial production orders for its wafer scalable manufacturing process.
How long does it take for a traditional manufacturer or even a BIG like BROADCOM/LUMENTUM/AMD/INTEL/NVIDIA/GOOGLE/MICROSOFT to provide a PIC for transceivers and - even more importantly for the future - a C2C solution with 1.6 Tb and above with a high volume ?
The three stages are:
1. Prototype development
2. Production equipment setup
3. Long-term testing and qualification (including production and supply chain)
chat GPT ANSWER :
This is a very good and realistic framing of the question, because the bottleneck is not whether PIC-based or CPO/C2C solutions will dominate, but how fast large incumbents can industrialize them at scale.
Below is a grounded, industry-typical timeline, separating traditional optical transceiver vendors from hyperscalers / big silicon players, and explicitly mapping to your three stages.
Executive summary (short answer)
From “serious internal commitment” to high-volume, qualified 1.6T+ PIC-based C2C/CPO:
| Company type | Time to high-volume C2C |
|---|---|
| Traditional transceiver vendor | 6–10 years |
| Big silicon (Broadcom, Intel, Nvidia, AMD) | 4–7 years |
| Hyperscalers (Google, Microsoft, Meta) | 5–8 years |
| PIC-native players (e.g., POET-like) | Already there / 1–3 years scaling |
The key reason POET-style platforms matter is manufacturing maturity, not just device physics.
Stage-by-stage breakdown
Stage 1 – Prototype development
(Concept → working silicon → lab demo)
Traditional transceiver manufacturers
(e.g., II-VI/Coherent, Lumentum, Innolight, Accelink)
Typical duration: 2–4 years
Why it takes so long:
-
Legacy culture optimized for discrete assembly
-
PIC design is not just photonics – it’s:
-
Wafer-scale yield engineering
-
Thermal management
-
Electrical-optical co-design
-
-
Often still dependent on external foundries with limited customization
For C2C / DSP-free optics, add:
-
New packaging philosophy
-
Tight electrical-optical co-optimization
-
Co-development with switch/ASIC vendors
➡️ Net: 3–4 years before a credible prototype
Big silicon players (Broadcom, Intel, Nvidia, AMD)
Typical duration: 1–3 years
Advantages:
-
Existing PIC or silicon photonics programs
-
Advanced EDA flows
-
Strong system-level modeling
-
Access to cutting-edge foundries
Constraints:
-
Internal competition for capital
-
Reluctance to cannibalize electrical I/O roadmaps
-
PIC teams often isolated from main ASIC teams
➡️ Net: 1.5–2.5 years to working prototype
Stage 2 – Production equipment setup
(Pilot → volume manufacturing)
This is where most projects fail or stall.
Traditional manufacturers
Typical duration: 2–3 years
Challenges:
-
Wafer-scale optics requires:
-
New tools
-
New test methodologies (wafer-level optical probing)
-
New yield models
-
-
Transition from:
-
“Assembly yield” → “die yield”
-
-
Often requires:
-
New fabs or foundry partnerships
-
Re-training workforce
-
Re-qualifying suppliers
-
Many vendors stop here and revert to semi-integrated solutions.
➡️ Net: 2–3 years (if they commit fully)
Big silicon players
Typical duration: 1–2 years
Advantages:
-
Existing wafer fabs or deep foundry relationships
-
Capital expenditure is not the constraint
-
Can parallelize equipment setup and design revisions
Constraints:
-
Need extremely high yield for hyperscale economics
-
Internal qualification standards are brutal
➡️ Net: ~18–24 months
Stage 3 – Long-term testing, qualification & supply chain
(Reliability, volume ramp, hyperscaler approval)
This stage is non-negotiable, especially for CPO/C2C.
All players (no exceptions)
Minimum duration: 18–36 months
Includes:
-
Telcordia-level reliability testing
-
Thermal cycling at system-level
-
Optical aging
-
Co-packaged thermal interactions
-
Field trials in real data centers
-
Multi-source supply chain validation
For 1.6T+ C2C, add:
-
Switch-ASIC co-qualification
-
Board-level + system-level testing
-
Software and monitoring integration
Hyperscalers often require multiple years of field data.
➡️ Net: 2–3 years
Putting it all together (realistic timelines)
Traditional transceiver manufacturer
Stage 1:3–4yearsStage 2:2–3yearsStage 3:2–3years-------------------Total:7–10years
Most will never fully reach C2C at scale; they will:
-
Buy PIC platforms
-
License interposer technology
-
Partner or acquire
Big silicon (Broadcom / Intel / Nvidia / AMD)
Stage 1:1.5–2.5yearsStage 2:1–2yearsStage 3:2–3years---------------------Total:4–7years
Even here:
-
First gen will be low volume
-
High-volume 1.6T+ comes one generation later
Why POET-style PIC platforms change the game
What POET (and very few others) already solved:
-
Wafer-scale optical assembly
-
Passive alignment at scale
-
DSP-free optical engines
-
Thermal decoupling
-
Manufacturing repeatability
This effectively compresses Stage 1 + Stage 2 into ~1–2 years, because:
-
The platform is already qualified
-
Customers focus on productization, not invention
That’s why:
-
Initial production orders matter more than demos
-
Hyperscalers prefer platforms over bespoke designs
Bottom line
CPO / C2C at 1.6T+ is not a technology race anymore — it is a manufacturing race.
-
Traditional vendors are structurally late
-
Big silicon will arrive, but slowly and cautiously
-
PIC-native, wafer-scale platforms have a 5–7 year time advantage