Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading shoeshineman’s reply in this thread.Jump to it

Mail Room2.6 rating from 9 members35 ptsRate

New job posting

https://sg.jobstreet.com/job/90154444?type=standard&ref=search-standalone#sol=9b04393fc7bb7b7930af4a42945021d2298798ce

I read this as another sign they are preparing production ramp :


 - Perform quality assurance buy-off on finished Final Visual Inspection

 - Conduct outgoing inspections and buy-off prior shipment

 - Conduct sample measurements on outgoing inspection

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. 12 hour shifts eh? Around the clock operations aren't for science projects. They're running fabs (or trying to) 24/7.