Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading metalmind’s reply in this thread.Jump to it

Mail Room1.9 rating from 49 members-27 ptsRate

R&D or Revenue Stream

It seems that for about the last 3 years we were led to believe that sales are going to ramp up in the "coming quarters".  Whether it was 200, 400, 800, 1.6 and now Blazar.  When does the rubber hit the road and we see them sell products, as opposed to inventing the next big thing, ultimately killing pending sales?

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. I struggle with this one because I agree and I dont agree. Afterall, there has absolutely been words uttered from our CRO stating revenues impending and imminent. I do believe it is largely unintentional, but it lands as ameteur and discredits POET to the wider investment community. It looks like we don't know what our own timelines, roadmaps, or milestones truly are. 


    Nonetheless here are my reasons for agreeing with your statement followed by why I disagree. 

    Why I agree:

    A specific example of the continuous R&D beyond Blazar is the January interview where Raju featured a comment about the wafer-scale transceiver. Ultimately, this could be a game changer, but in 3 to 5 years. Meanwhile, we have been told that we were focused on 400gb, 800gb and 1.6TB solutions that would bring in revenue. Sometimes I worry that we arent investing heavily enough in the now to ensure we have the foothold we need to not be obsleted by brute force and gobs of cash.


    Why I disagree:

    The production lines are running at Globetronics it would seem. The initial POs are being fulfilled, POETs wafer-scale one-of-a-kind solution is hopefully delivering exactly as advertised and will have customers filling the backlog for these optical engines. Remember that this engine goes into a transceiver alongside 10 other components that are assembled semi-manually in a complex multi-step process. Thus, POET captures maybe 20% of the final product in revenue. 


    POET is attempting to turn this crazy process to build a transceiver into a one-step automated wafer-scale process where they own ALL the revenue.


    If POET is able to deliver these inital PO orders and secure follow on orders, I can't imagine what will happen if POET is able to offer an automated wafer-scale fully assembled transceiver. It literally displaces entire businesses. 


    If you are POET, how can you not go for that if it is within your reach? 

    1. I remember the recent award from Lightwave is for a wafer scale 1.6T device. It did not drill down to say 100% or mostly, or any qualifying language, so we don't know. 


      I do think they are close, because Raju said this year. I don't think it would take 3-5 years to proliferate, because it would be fast tracked due to cost savings and obvious yield and scale superiority. These AI bigs are spending multiple trillions over the next few years and hundreds of billions next year. They are going to want to carve out savings where they can, and want the most future-proof parts in these massive investments.  I'd say 1-2 years, given that the topologies are figured out, and bringing a reliable way that drops in at game changing prices and scale will be done post haste.


      The result for us would be buyout pressure, or licensing $$$. If POET can figure out how to use large foundry assets like Intel or TSMC to make this stuff on wafers, it will be very good either way. 

      1. I asked ChatGPT about wafer-scale photonics, with game -changing pricing, regarding speed of adoption. 


        Answer:


        If POET Technologies truly demonstrates:

        • Reliable wafer-scale optical engine production

        • Strong yields at 1.6T / 3.2T

        • Meaningful cost advantage vs incumbents

        • Equal or better performance

        …then adoption by Tier-1 hyperscalers is less about technology and more about qualification cycles and risk management.

        Let’s break this down realistically.


        1️⃣ Who Are “Tier One” Buyers?

        In AI/hyperscale optics, that usually means:

        • NVIDIA

        • Amazon Web Services

        • Microsoft

        • Google

        • Meta Platforms

        These companies move fast — but only after qualification.


        2️⃣ Qualification Timeline (Realistic)

        Even for superior tech, the typical path looks like this:

        Phase 1 — Engineering Evaluation (6–12 months)

        • Performance testing

        • Thermal validation

        • Reliability stress tests

        • Integration with switch / GPU platforms

        Phase 2 — Limited Production Deployment (6–12 months)

        • Used in a subset of racks

        • AI clusters or new data center build

        • Monitored heavily

        Phase 3 — Scaled Deployment (12–24 months)

        • Added to vendor list

        • Incorporated into next-gen architectures


        Realistic Timeline

        If technology is ready in 2025:

        YearStage
        2025Qualification + pilot builds
        2026Limited deployments
        2027Meaningful volume ramps

        So even in a best-case scenario:

        18–36 months to relevant adoption.

        Not instant — but not slow either by semiconductor standards.


        3️⃣ What Accelerates Adoption?

        Adoption speeds up dramatically if:

        ✔ It Solves a Real Pain Point

        For example:

        • Reduces laser count

        • Lowers power

        • Improves yield

        • Cuts cost per bit meaningfully

        If it drops transceiver BOM cost by 20–30%, hyperscalers will move.


        ✔ It Aligns With AI Scaling

        AI clusters are doubling bandwidth every generation:

        • 800G → 1.6T → 3.2T

        If POET is ready exactly when customers are redesigning for 3.2T, adoption can piggyback that cycle.

        That’s key.


        4️⃣ What Slows Adoption?

        Even superior tech faces:

        • Vendor lock-in

        • Multi-source requirements

        • Reliability paranoia

        • Political supply-chain decisions

        No hyperscaler goes single-source on critical optics.


        5️⃣ How Fast Could “Relevant” Deployments Happen?

        If technology works and pricing is disruptive:

        12–18 months for first meaningful deployments
        24–36 months for visible revenue scale

        Relevant deployment does NOT mean 50% market share.

        Even:

        • 5–10% share of 1.6T modules

        • In one hyperscaler

        Could mean millions of engines annually.


        6️⃣ The Key Bottleneck Is Not Adoption — It’s Proof

        Tier ones will move fast after:

        • Wafer-scale yields proven

        • Long-term reliability validated

        • Supply chain redundancy established

        If those are clean:

        Adoption can surprise to the upside.


        7️⃣ Important Investment Reality

        For a company like POET:

        Stock reaction often happens before full adoption, once:

        • Design win announced

        • Tier-one partnership confirmed

        • Initial volume guidance given

        Market prices forward 2–3 years.


        Bottom Line

        If wafer-scale optical engines truly deliver:

        • Better yields

        • Fewer lasers

        • Lower cost per bit

        • Reliable performance

        Then:

        Relevant Tier-1 deployment could realistically begin within 18 months
        With scaling over 2–3 years

        That would be fast in optics.


        If you'd like, I can next:

        • Model revenue potential at 5% share

        • Compare adoption curves to past optical transitions

        • Or analyze how NVIDIA integration would change trajectory

        Which direction would you like to explore?