New senior Failure and Analysis Engineer Position
https://www.linkedin.com/jobs/view/4465227132/
Join the conversation about POET Technologies Inc.
ReplyYou’re reading petra’s reply in this thread.Jump to it
https://www.linkedin.com/jobs/view/4465227132/
Join the conversation about POET Technologies Inc.
ReplyIt makes sense they hire more FA engineers in Singapore with all the customer quals and early production shipments hopefully going on. According to linkedin, it seems Bill Wolfe has been training and helping with FA. POET also has a lady named Yvette Flores Dela Cruz who is the Quality/Reliability/FA manager in Singapore. And she has extensive FA experience from Seagate, STATS ChipPac, Denselight, and Toshiba. There will be failures, and yield improvements which will always need to be made. I see they also have a John Ho, Ph.D. who heads up Reliability, and he has FA experience as well. Plus an FA engineer is no good without all the designers POET has been hiring. It takes a big team to do FA and figure out did the customer damage the device, did something in the fab process shift, was there a defect, is there a test program issue, a design issue, etc. etc. Here's a short easy-to-read article from Global Foundries about FA of PICs if anyone is interested on page 23:
Hi, it's the guy you don't like.
It's Sept 14, half way through the qtr that POET is supposed to ship 30,000 units. And you don't think it's strange to hire a FA person now? You think it's normal to do so right now?
So it's the World Series, 6th inning. And the team says, hmm gee whiz, maybe we need a closer. Let's find one in the hot dog line and give him a uniform.
If they do not announce by years end that we shipped 30,000 or more units, don't worry about $5, we will be lucky to see $2.
If you want the optimistic take, POET expects to grow enough that they see the need to expand the failure analysis lab. Someone was probably already doing these job duties previously, because there is a 0% chance POET has a 100% yield rate. A quick Google search shows that even a mature semiconductor manufacturing line isn't going to hit 100% yield. You still want to hire people to figure out why things are failing (because something will fail), so you can implement process improvements to get better yield.
I don't see this as concerning, it is just POET expanding their team.
If I was on the exec staff at POET, I'd be in 100% support of directing our most experienced people to overseeing yield enhancement (which is basically what this role is focused on).
So, for a company at this stage, it's common for people in leadership roles to assume more "tacticle" responsibilities.
POETs primary objective over the past 6 months has been to prove effective yields at high volume, and to demonstrate that they can scale. They likely had leaders overseeing this AND doing hqnds in tasks to ensure they have 100% ownership of the goal.
At this point, POET has likely achieved their goals and so these leaders can begin to focus on strategic objectives. As they transition away from the hands on tasks they need to hire people now to take over these tasks and to manage quality assurance and failure analysis (Reporting to leadsrship).
Thats why the role is being filled.
imho
They specifically stated that they would ship throughout both quarters. That means it should already be happening.
If it's not, they would be behind their own proposed schedule. They should have a concrete window of completion by now. Especially if they plan on scaling up. 30k is peanuts compared to the volume they want to be handling.
Again, I am not saying it's correct - but the market expects them to nail that and be forthcoming around it. Even a PR that states that they've shipped x amount already with the remaining amount to be shipped by date x (versus the effective end of the year) shows they are on top of things.
It's silly, but it's also really easy to solve on POET's part. It's low-hanging fruit that would throw us (investors) a bone. I'm not sure why we are 2 weeks away from the end of Q3 and that guidance does not exist.
You also have to imagine what that looks like to those who are skeptical (or worse, shorting) - it goes directly against Suresh' 3 C's.
If they are truly as ready to produce as they say they are, that info should be out. If they can be specific enough about the number if units and the quarters they are shipping in, giving a narrower window should be able to be shared to. Not asking for customer info (even though we know it's likely Adtran and it would be great to have on record).
If that was followed by another PO, we would be in a great spot - but we are absolutely not right now, not in this market.
If Poet decides to wait until November ot December to release this, we are done. The stock price will be so low that it will hover around its cash and assets. I wouldn't know at that point whether it would be a buy.
And then there is this.
https://youtu.be/CthSrxds39I?is=1xIFTah0u1YdvLD_
If there is no need for higher speeds from memory to GPU, then is there a need for Poet in the data center?
Someone here with better insight, please explain whether this could be a killer for Poet in the data center business.
Also feels perhaps a bit late for it to be posted (assuming they are already shipping). Hope it doesn't mean they haven't yet.