Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading digicat’s reply in this thread.Jump to it

Replies

  1. nice bit of info. I could only give cgpt the pic. The X file is missing...


    That picture is enough to identify the important point. It's slide 9 from a Celestica presentation at the October 2026 OCP Global Summit, titled The Squeeze: Tech Acceleration Coupled with Faster Qualification.


    And it contains something particularly relevant to our discussions about POET's customer qualifications.


    What Celestica is saying


    QUALIFICATION WINDOWS SHOWN ON THE SLIDE

    -36 months 100G / 400G

    -24 months 800G

    -18 months 1.6T


    Celestica's message is that the industry's technology cycles are accelerating, leaving less time for qualification and redesign.


    An important distinction: These figures appear to represent the available qualification or product-development windows, not a requirement that every 1.6T optical engine must undergo 18 months of reliability testing.


    That distinction matters enormously for POET.


    What this means for POET


    The slide supports three useful conclusions:

    -Qualification is becoming a competitive bottleneck. Companies have less time to finalize designs, resolve problems and reach production readiness.

    -POET's manufacturing expansion makes more sense in this context. Its hiring in quality assurance, production planning, supply-chain engineering and manufacturing systems is consistent with preparing to handle tighter customer schedules.
    -The 18-month figure is not necessarily bad news for POET. It does not mean POET must wait another 18 months before shipping 1.6T products. A customer qualification could already be underway, and different stages may overlap.


    Celestica's broader OCP material also emphasizes the importance of integrating and validating complete AI systems, not simply producing faster components. 


    My assessment: Importance to POET — moderate to high. This is a useful industry-level discovery, but not evidence of a specific POET qualification milestone.


    I would flag it as NEW, SEND TO ANALYST: YES, specifically to investigate how Celestica defines those qualification windows and whether POET's current customer programs can fit within them.


    We have the photographed slide as evidence. I couldn't independently locate the full presentation, so I wouldn't attribute more precise qualification requirements to Celestica than the slide actually states.



    1. I remember Suresh mentioning the interposer as a "known good die (KGD)" product, as an advantage. 


      So as companies come up with their various configurations to acheive the speeds they need, POET becomes a Lego block they can put into their system without starting from scratch on the items already. This fits right in with compressed product testing cycles that are trying to keep up with the hardware. 


      I believe Suresh is a visionary, and I now want to get paid for recognizing that some time ago. I believe it will come. 

      1. I think it will come in due time (us getting paid). Way too many signs that the company is actively expanding and preparing for the manufacturing ramp to ignore. We saw none of this in previous years when we (or at least I) thought that mass production was just around the corner. 


        They are hiring for Supply Chain, ERP/netsuite rollout, finance, IT, procurement, yield management, along with various other positions that are all pointing towards production company, not a science experiment company. In years past past I don't remember POET hiring for any of these positions, it was usually just R&D engineering or similar. 


        I know the news has been sparse lately, and quite frankly I don't expect hear anything until earnings on 11/16. But pay attention to the hiring and you'll see they are busy behind the scenes. I'm not happy with the current stock price, but I fix that by just not looking at the account LOL!