A solution to data center buildout

My caffeine induced thoughts, cleaned up, but not augmented via AI.


An alternative approach to data-center development: Repurposing abandoned mining properties.


-Remote locations, away from residential neighborhoods.

-Economically depressed regions in need of redevelopment.

-Potentially favorable environmental and infrastructure characteristics, including water availability, geothermal opportunities, and existing road systems.

-Productive reuse of otherwise underutilized or abandoned land.

-Land grants, sales, or development agreements that provide tangible benefits to rural communities.
-Reduced pressure on undeveloped land, with the potential for meaningful economic revitalization.
-An enormous inventory of potentially suitable sites throughout the country.


A brief preliminary investigation suggests this idea has merit, without having to torture AI into agreeing with me.


So my original query was: “Given the understandable resistance to ‘neighborhood’ data centers, would it be viable for abandoned mining sites to be used, given their relatively remote locations, access to water, and potentially lower environmental impact? Sites where mining for coal and other minerals took place would seem to offer possibilities, but is this too far outside the box?”


DYOAIQ (Do Your Own AI Query) if you think I’ve framed the question too favorably. I won’t post the full AI response, but I would encourage others to formulate their own queries and examine the possibilities.


The preliminary evidence suggests this is not only viable but is already being pursued, albeit on a relatively small scale, in areas relatively close to me in eastern Pennsylvania, as well as in West Virginia and Virginia.


Rather than reflexively rejecting data-center development, perhaps we should be looking more seriously at where and how it can be done responsibly. The potential advantages are compelling, but development must be subject to rigorous environmental oversight and meaningful community participation. We must avoid repeating the history of economic and environmental neglect associated with mining and fracking—experiences that understandably created and continue to sustain strong local resistance.


If successful, this could establish an entirely new category of brownfield digital infrastructure: not simply data centers built on former mines, but purpose-designed campuses integrating environmental remediation, power generation, cooling infrastructure, and hyperscale computing. That could turn a legacy environmental liability into a productive economic asset while giving communities a meaningful stake in the next generation of digital infrastructure.

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. Funny you should bring this up Outahere. I can understand why people wouldn't want these in highly populated areas and think rural industrial regions make much more sense.
    My work place here in northern Alberta produces mechanical pulp (not chemical pulp) And it requires a lot of water from a huge water source. We generate and capture bio gas from the effluent of the process before it goes to the clarifiers and back to he river.  Water returning to the river is cleaner than when we pump out of the river. (It's true) there are very rigorous environmental regulation to follow.

    From that biogas we run 3 4500 hP gas engines to produce only 9 MW of power. It take a lot of energy to produce just 3 MW. The mill requires 60 MW to run and because We have a reliable source of water, an abundance of natural gas(because it's Alberta) a large land base 20 miles away from  town in the middle of a forest and a very skilled work force in the region we have approval from govt to move forward on a data center. I don't know a lot about them but possibly more than average, they are on a closed system which once filled dont use much water. But do require a lot of electricity.

    But, There is already a lot of opposition unfortunately. This would be a big boost to our local economy and province. These people oposing the project really don't seem to know anything about data centers or this proposed project and seem to rely on old information and personal bias to base their arguments.

    i totally agree with your opinion of building these in rural areas. Plus the cold climate of Northern Alberta at least 6 months of the year has cooling advantages over warmer climates to the south. I hope the project moves forward as the pulp industry is in very challenging times these days.

    please forgive my long winded reply. I just thought I'd reply to this as it does hit home for me.

    1. People are understandably skeptical, because the evidence is all around us, currently with warehouse development, but also, when large businesses shut down operations, mines, steel mills, factories, malls etc. there is seldom any rehabilitation of the site, they just move on. 


      On a tangent, POET needs to do a better job of promoting the impact their technology has on power, heat, etc in data center interconnects; while this is dwarfed by the amount of power consumed by the servers, it is a substantial and demonstrable step in efficiency that could play into the concerns about power consumption overall if properly promoted. 



      1. Yes, I agree they do have a place for perfect synergies with other operating industries such as those that require large amounts hot water and may produce waste that can be burned to produce electricity needs for said DC. They can definitely complement each other to solve their costly bottlenecks and perhaps even share or replace older infrastructure needed for the existing business which a new dc facility would require to operate anyway. Often these are away from major population centers to. It is a good way for them to gain acceptance of them.


        Poet needs to promote something, anything. i am anxiously awaiting the 16th for some kind of flicker of light or evidence that everything is still on track. This is just ridiculous and painful to watch. If only I had waited 10 yrs before buying. At least I'm almost in the green again.


        1. I agree eaf69 , we need to be like Denmark and incinerate garbage to create power Denmark actually imports garbage because they don't produce enough to run there incinerator that produce the power. The system is all there we just need the political will to do it. 

          1. See Canadian Company Pyrogenesis they can do that and so much more. Horrible self serving CEO though.


            I think this week we will see accumulation and the price rise for Poet as the true believers start to collect shares before next Monday the 16th financials.

  2. copy and pasted your post and fed it to cgpt...


    Re: A Solution to Data Center Buildout


    Outtahere, your idea has considerably more merit than you might realize. There is already solid research and an operating example supporting it.


    A January 2026 Penn State study examined 5,586 abandoned Pennsylvania mining sites and identified 160 with mine pools potentially suitable for data centre cooling.


    At the Morea mine, researchers calculated potential cooling capacity of 9.5 MW using conventional cooling and 30.6 MW using liquid cooling.


    Even more interesting, Iron Mountain has operated a data centre 220 feet underground in a former Pennsylvania limestone mine since 2013. Its 15.5 MW facility uses an underground reservoir for energy-efficient cooling.


    The U.S. Department of Energy has recognized the facility as a Better Buildings Showcase Project.


    The biggest obstacle may not be the land or cooling, but sufficient electrical capacity, fibre connectivity and environmental remediation. Not every abandoned mine would qualify.


    The POET connection: Responsible expansion of AI data centre infrastructure potentially increases demand for the high-speed optical interconnects POET is developing. More computing capacity means more networking infrastructure, although there is no confirmed direct POET involvement in these projects.


    What I particularly like is the potential to turn environmental liabilities into productive infrastructure while giving economically depressed communities a stake in the AI economy.


    This isn’t science fiction. It’s already happening.


    Sources:


    Penn State — January 2026 peer-reviewed research:
    https://pure.psu.edu/en/publications/repurposing-abandoned-mine-lands-for-cooling-data-centers/


    Iron Mountain — Operating Pennsylvania underground data centre:
    https://www.ironmountain.com/data-centers/locations/na/western-pennsylvania


    U.S. Department of Energy — Geothermal cooling showcase:
    https://betterbuildingssolutioncenter.energy.gov/showcase-projects/iron-mountain-data-centers-geothermal-cooling-system/printpdf


    Inside Climate News — September 2026 investigation into abandoned mine redevelopment:
    https://insideclimatenews.org/news/22092026/building-data-centers-on-pennsylvania-abandoned-mines/

    1. I have a friend who has spent his career as a scientist and a business executive with companies focused on environmental assessments.  Over the past 5-10 years he's been working for a large venture capital firm, primarily identifying companies for acquisitions.  The focus of these acquisitions has transitioned to data centers, so he has been very closely involved with analyzing how data centers can be built and expanded in envornmentally sustainable ways.


      I asked my friend this morning about this question regarding placing DC's in old mines.  He offered a long response, which I'll summarize here:

      First, data centers are not going away.  Site locations will migrate to remote areas in places like Wyoming, as opposed to "neighborhoods".  The industry is already working toward making data centers energy self sufficient.  This is happening now, so the public outcry about energy consumption will quiet over time. There are also already technologies for cooling systems without the need for huge amounts of external water.  


      This guy has direct experience in this industry.  It's people like this who understand what is happening with DC construction and the direction for future progress.  The venture capital firms investing billions of dollars do thier research to ensure a positive ROI.  They don't just read headlines and they aren't influenced by the political noise of the day.  Data Center build-outs have just begun.  

  3. Funny you mention that walconst.  It's being done in Finland.  Microsoft and Fortum are developing a system to recycle data centre waste heat into district heating for several municipalities. 

  4. Is there any merit to upgrading/retrofitting/reengineering existing data centres to bring them into the photonic world much like telcos did in the 80's converting from analog to digital?  

    1. if It already fits you just remove the old section and use poet.  If it doesnt use charge for an nre and and put that in. Poet addresses one section of the rack. No need to retrofit an entire Data center

    2. This is why we charged the one company 1m for custom work.  And I hapoen to know Nvidia did not fit and would need nre.  I'm hoping/guessing Foxconn sent Nvidia our OI and they ordered the nre 

    3. When servers can be reduced to the size of cell phone I suppose, and not tongue in cheek. 50+ years ago a computer room would have been thousands of square feet to produce less than .001% the throughput of a single server today. My guess, by 2050 data centers will be like shopping malls today, another good reason to place them in already abandoned sites. The biggest obstacle, as DJ Dan pointed out, is power. 

  5. Outtahere do you remember around a year ago they were floating the idea of Small Modular Reactors when the data center controversy was just starting out. There was quite a bit of talk about it then but seems to have fizzled out. I wonder if it may be revisited?

    1. To your question check out two companies addressing the question of modular (small) nuclear reactors. One is obtaining approval for a "safer" and more efficient fuel type to generate greater power utilizion and safer fuel - Lightbridge (LTBR)


      The second company; Nano Nuclear Energy (NNE) provides onsite nuclear power systems at a fraction of traditional massive size and costs.  Suggesting on site power systems for data centers and military bases.


      They both are being "fast-tracked" by government for testing and regulatory approval.

  6. A lot of Mines generate(d) their own power, which is the biggest complaint about data centers.

    The Natives have a lot to say about remote land with lots of water.

    Go Birds!

    1. We need to use the heat off of these DC's to regain some of the cost for power,  build green houses, heat homes and towns with water circulation systems, anything that can use heat.  In northern climate where DC's should be the heat used to heat entire towns would be very welcomed. 

  7. You only need a large tank of water that gets corculated over and over. A second tank of water that needs to be filled periodically for employee use, and a septic tank. 

  8. I was looking at Oklo $OKLO and NuScale $SMR a while back dakiss.  I'm gonna have another look and see how far it's come.  This is definitely something to keep an eye on ;)