Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading gubigubes’s reply in this thread.Jump to it

Treasurer2.5 rating from 86 members3.7K ptsRate

Shipments

"We expect our fourth quarter shipments to exceed our total shipments for the first three quarters of 2026"  SV


Pray tell what was the total number of shipments for the first three quarters ?

Why is it so hard for this guy to assign concrete numbers to what has already transpired ? Without knowing what the first number is, the second number is kind of meaningless. Its kind of like saying I used to drink everyday and now I drink more every day. 

Join the conversation about POET Technologies Inc.

Reply

Replies

  1. The number is undoubtedly so small, that it might be better not to expose it publicly right now 


    Listen: I'm as harsh a critic as anybody, I'm as disappointed as anybody, and I've lost more money than any of you. I guarantee it.  I don't mean I'm down, I mean I've lost it. Well into seven figures. Almost life savings. 


    I only say that to baseline my next comment. I think the second video is the best thing they've ever done. Maybe not the most encouraging, but the most honest. At least we have a sense of why they are delaying constantly. 


    1) supply chain problems 

    2) building their own equipment 

    3) 1) affecting 3)

    4) 1k clean room needing now to be 10k clean room

    4) etc.


    What makes me truly angry, raging actually, is that they represented themselves previously as much more on the cusp; had they previously communicated any of this in a reasonable way I personally would have done some very different things. I probably could have been a lead plaintiff in the lawsuit.


    Now moving on: it's good that they are being more transparent. I believe pretty much everything he said in the second video.  Extrapolating from the last few weeks, I think it's very likely that they technically redomicile to Austin TX, which I would view as an enormous positive. I actually believe that they're doing a lot of the right things in the way they are building their own manufacturing capacity. 


    However, as I've said here many times, I don't believe going it alone is the right strategy. They are plodding and precise, like engineers do. I find it hard to believe there can't be some kind of hybrid development model, where a licensee or manufacturing partner is sharing the development load.


    What seems utterly clear is that "this" window has closed.  Collette Kress is, in fact a 'deer in the headlights";  Nvidia is probably going to make a huge mistake by not bringing Jensen back. So this AI market is now a complete s*** show for the foreseeable future and it may take it until 2028 for the next wave of the AI boom to come. So Suresh probably catches a break there. 


    For investors in general, and investors in Poet, that sucks. This is dead money for a while, with one exception.  Keep in mind, it's a good thing that they're going to start doing conference calls and better quarterly reporting; but with that is going to come tougher questions from analysts, and more scrutiny. That will temper Suresh's tendency to let's just say "imprecisely estimate" timelines.  That's going to tamp down the froth a lot. 


    Certainly no one should be buying options here; based on these two videos, I can't come up with any near-term catalysts at all, except for one: being acquired.


    I think that is the most likely end game by far, say 3 years out. The list of potential suitors is lengthy. Lumentum? Coherent? Broadcom? Intel? Corning? How about another one out of left field - Texas instruments (who absorbed Silicon Labs)?


    They have a crap ton of cash on the balance sheet, that alone makes them a target.  Plus, next to zero executive ownership or control of the stock and no class B shares structure. The only thing preventing a takeover is the poison pill. Again: one of their big dogs gave them hundreds of millions of dollars @$20/sh. If someone stepped in and offered $30/sh tomorrow, are you trying to tell me they couldn't make a deal, or be under intense pressure to do so? Who knows what MMMCAP or Jane Street is Susquehanna might be cooking up. 


    IMO, "being acquired" is the near term investment rationale now, because everything else is a 2028 story.

    1. One fear I have is related to the 10k clean room now needing to be 1k. What other goal posts are going to move, which may not even be POET's fault, that will potentially further delay production? 


      I do recognize they are trying to source wafers outside of Silterra (based on previous job postings), so if the hyperscalers demand multi sourcing at least POET is working on that.


      Overall it is clear to me that whoever manages manufacturing needs to be thinking 100 steps ahead to make sure everything can actually be produced when the time comes. Hopefully Suresh, Ghazi, and Sandeep (plus many others) are up for the challenge. 

    2. Thank you for your refreshing take, Train. It brings a much needed new perspective, albeit not a great one in every way, i.e. I'm afraid my options won't recover and with them a significant part of my net worth.

    3. We seem to belong to a very exclusive club trading below market capitalization.  I did ask the question of how common it is for a pre-revenue company (although not sure if we still qualify there with our minimal revenue) with over $750 million in the treasury, no debt and multiple years of cumulative capital losses.  The answer came back as only .1% of companies on the Nasdaq fall into this category. Maybe the market will wake up to this at some point ?  Maybe something to chew on ?

    4. Thanks for being so transparent. It's been brutal and there is a lot of pain to go around the stock and space and mine is significant too.  I agree it "feels" like the communication is more honest and less flat out misleading.   I remain very wary of all information until they ship actual commercial product and show they can scale it which, at best, is mid 2027.   One thing I don't believe is that 7 products will launch with poet inside next year.  

    5. Sorry for slight typing correction 


      "3) 1) affecting 2)

      4) 10k clean room needing to now be 1k"



  2. “I don't know half of you half as well as I should like; and I like less than half of you half as well as you deserve." We are truly in the Shire.