Skip to content
Sign in

Post

POET Technologies Inc.

You’re reading cmos_r_us’s reply in this thread.Jump to it

Treasurer2.8 rating from 166 members2.1K ptsRate

Big Picture

Although I rarely post here anymore, I thought it may be a good time to chime in with a few comments.

It's been a brutal few months for shareholders and it clear emotions are running a bit hot.  Based on recent posts I think there's an opportunity to step back and look at the big picture as I think some may be a little too focused on the immediate pain and disappointment we're experiencing.


Whenever posts appear challenging the viability of POET's technology compared to some established "competitor", one should always consider that in most industries, semi and photonics included, there is rarely (if ever?) only one solution.  In fact, we know there are typically a handful or more viable competitors supplying hardware covering every level of the supply chain.  Remember this: POET doesn't have to be the best in absolutey everything, they will have specifc strengths as will their competitors.  This Is not a simple binary all or nothing situation.  In the current topic of conversation, Tower may be well positioned to compete, good for them.  Are they capturing 100% of the photonics market, absolutely not.  So, how much do they capture? Better question for us, what % of market does POET need to be commercially successful?  I'd be willing to bet 10-20% to start would be more than fantastic, and would set themselves up for a promising future.


Lots of room for more than one solution folks, so let's concentrate on what's important for POET and us:  prove to your customers you can provide a solution that can meet their needs, scale and be cost competitive, and the rest should take care of itself.  Of course, jmho.


Join the conversation about POET Technologies Inc.

Reply

Replies

  1. Great post. I fully agree, with one major exception: POET FAILED to execute on what should have been a relatively modest target of shipping 30K+ optical engines in 2026.


    That's a horrendous execution failure, and I believe it will further undermine institutional confidence in the company.


    POET has been successful in garnering retail investor support, but I question how much of that support is based on a realistic understanding of the competitive landscape and the goliaths POET is up against.

    1. No no no no no read the report. Did that company cancel. They pushed it out due to changing what they wanted 

    2. Thanks CMOS,


      Agree that there are likely very few who were not disappointed with the apparent miss, myself included.  And you're absolutely right that on the surface it's not a good look, even if there were extenuating circumstances we are not aware of.  While such "misses" may negatively impact our perception of things and perhaps even institutional sentiment, I would suggest the only thing that really matters to the company at this point is how the customer feels about it.  That's where you make or break your reputation.  What caused the delay?  Did they disrupt the custome's timeline?  questions we'll likely never know the answer to.  Projecting our emotions without full knowledge of the circumstances may make us feel better (or worse) but serves no real purpose.  Make no mistake, the company has lots to prove, and while its fair to voice our opinions, absolute judgement can be a bit trickier when not armed with all the facts.

    3. The execution has failed up to this point because of yield issues and not having production lines set up. I'm surprised that no one has done the simple math with the latest information about wafer deliveries. 50 per month in 2025 and over 100 per month for 2026? Assuming 500 die per wafer, we're talking about upwards of 1 million OEs worth of wafers...and an inability to provide 30,000 OEs as projected. 


      Why is there such a disconnect? 


      Why is it after all this time, SilTerra is the only foundry partner? Because making these optical interposers and what comes along with it...passive alignment functions, embedded waveguides, etc...is EXTREMELY difficult. Far more difficult than standard SOI wafers that the rest of the world is using. 

      1. What makes you think metal/oxide "back end of the line" processing is so difficult?  Pretty sure they aren't using geometries required by "front end of the line" processing required to manufacture transistors. 

      2. I don't know if there's is a bunch of god damn retards on this boardor what. Read the report. The 30k wikl be delivered when the cimpany wants them. Read the phuching report. i mean is everyone idiots on this board. They are getting 1250 

        wafers and that goes up to 1500 a month in April. That's about 1 million chips a month  They have 16 projects with 7 companies going Inti production starting now. You people shove the measley 30k engines where the sun doesn't shine. That's nothing. And again if that unknown  company had demanded delivery by oct 30, they would have been delivered you can take that to the bank.  If you don't believe, sell your shares as piss off. Oh and laser components locked in for all of 2027 and two tier 1 laser companies who are putting in orders for the OI who will supply the lasers. 

  2. Many of Spectra7 investors had view too, myself included. "We only need to capture a fraction of the market", etc. It never worked out, unfortunately. And for almost all of us at the time the biggest mistake was hanging tight to the end, and having no exit strateg. Enthusiasm and optimism often become your worst enemies. It was a good lesson though.