Skip to content
Sign in

Post

Paladin Energy Ltd

You’re reading jokal’s reply in this thread.Jump to it

Jokal Appointed Hub Leader

Good Morning Jokal.

Congratulations on your appointment to HUB Leader on the Paladin Energy Ltd Hub.

As HUB Leader you have the ability to delete posts, terminate disruptive members, post a President's Video and update all editable information on the HUB which includes: Fast Facts, Corp. Profile, Photos, Management and Links Library.

Discussion forums will never be the same.

Thank you for joining the AGORACOM Community. Our goal is to make this the best PDN discussion forum on the web.

Regards,

AGORACOM

Join the conversation about Paladin Energy Ltd.

Reply

Replies

  1. Paladin Energy Ltd: Kayelekera Uranium Project, Malawi

    Mineral Resource & Ore Reserve Estimate Significantly Improved - Mineral Resource increased by 27% or 9.4Mlb U3O8 - Ore Reserve increased by 17% to 29.3Mlb U3O8 - Mine life increased by 20% - Resource still open to west and north west - Highly encouraging exploration results in surrounds



    08:49 EST Thursday, November 20, 2008

    PERTH, WESTERN AUSTRALIA--(Marketwire - Nov. 20, 2008) - Paladin Energy Ltd ("Paladin" or "the Company") (TSX:PDN)(ASX:PDN) is pleased to advise that infill and extension drilling of the Kayelekera Deposit has returned very encouraging results. This work has produced a threefold benefit. Firstly the results have added significantly to the previously stated Mineral Resource estimates for Kayelekera; secondly, this allows most of these resources to be classified into the Measured and Indicated Resource categories with a small percentage retained as Inferred Resources; and thirdly, this permits the calculation of a new Ore Reserve which will extend the life of the operation.

    The drilling programme, which was carried out during 2008, consisted of 132 RC drill holes for a total of 9,955m. An updated NI43-101 report is in preparation and will be submitted to the Canadian authorities by late December 2008.

    Mineral Resource Upgrade

    The Mineral Resource estimations are based on the use of a combination of analytical assays (XRF) and downhole gamma logging results, following the application of standard practice radiometric calibration methods for U3O8. Approximately 50% of the mineralised holes were assayed for U3O8 using analytical methods (XRF) for check purposes and to establish disequilibrium parameters for subsequent application to un-assayed, radiometrically logged drill hole intervals.

    Mineral Resource estimates conforming to both JORC (2004) and NI 43-101 codes are as follows.

    At 300ppm U3O8 Cut-off
    ----------------------
                                    Mt    Grade ppm    Tonnes      Mlb
                                               U3O8      U3O8     U3O8
    ------------------------------------------------------------------
    Measured Resources            3.42        1,211     4,141      9.1
    Indicated Resources          18.78          725    13,616     30.0
    ------------------------------------------------------------------
    Total                        22.20          800    17,757     39.1
    ------------------------------------------------------------------
    Inferred Resources             3.9          552     2,152      4.7
    
    
    The previously reported mineral resources (at 300ppm cut off) were 15.31Mt of Measured and Indicated Resources grading 886ppm U3O8 (13,573t or 29.9Mlb of contained U3O8) and 3.4Mt of Inferred Resources grading 596ppm (2,040t or 4.5Mlb of contained U3O8).
    At 600ppm U3O8 Cut-off
    ----------------------
                                    Mt    Grade ppm    Tonnes      Mlb
                                               U3O8      U3O8     U3O8
    ------------------------------------------------------------------
    Measured Resources            2.26        1,612     3,643      8.0
    Indicated Resources           8.13        1,121     9,114     20.1
    ------------------------------------------------------------------
    Total                        10.39        1,227    12,756     28.1
    ------------------------------------------------------------------
    Inferred Resources             1.0          945       945      2.1
    
    

    Following the infill and extension drilling almost all of the deposit reports as Measured and Indicated Resources giving a very high level of reliability for subsequent pit optimisation and scheduling.

    As can be compared from the above, the resources for Kayelekera have been increased substantially. At the 300ppm cut-off limit, Measured and Indicated Mineral Resources amount to 22.20Mt grading 0.08% U3O8 versus the previously stated 15.31Mt grading 0.09% U3O8.

    The increase in tonnage and minor decrease in grade from the previously stated resources is because the high grade core of the deposit was well defined by previous drilling and the new drilling focussed mostly on defining the peripheral zones of the deposit. As a consequence this work added mainly lower grade material to the resource estimations. In total, however, the new estimate has increased the contained uranium metal in the deposit by 4,239t U3O8 (9.4Mlb) or 27% which is regarded highly significant.

    Ore Reserves

    Economic analysis on this resource has indicated a break-even cut-off grade of 400ppm. This is unchanged from the previous resource due to a number of contributing factors including changing dynamics of selling price, use of RIP processing and reagent costs.

    The Ore Reserve estimate, conforming to both the JORC and NI 43-101 codes is;

    At 400ppm U3O8 Cut-off
    ----------------------
                                    Mt    Grade ppm    Tonnes      Mlb
                                               U3O8      U3O8     U3O8
    ------------------------------------------------------------------
    Proved Reserve                2.87        1,373     3,943      8.7
    Probable Reserve              9.75          959     9,342     20.6
    ------------------------------------------------------------------
    Total                        12.62        1,053    13,285     29.3
    ------------------------------------------------------------------
    
    

    Compared to the previous Ore Reserve of 25.1Mlb announced in 2007 (also reported at a 400ppm cut-off) the new 2008 Reserve estimate outlined herein represents a 17% increase in contained U3O8.

    The cost parameters used in the reserve estimation are now well developed and include contracted schedules for such items as reagents and contract mining, and as such their inclusion can be reasonably justified. The revenue rate used in the estimate was US$60/lb which is regarded as conservative when compared to the Ux spot price and existing term contracts.

    The 2008 Reserve suggests an increase in mine life of 1 1/2 years to 9 years at a production rate after Year 1 of 3.3Mlb pa U3O8 when the inferred material occurring within the pit design is included. Processing of marginal ores at the end of mine life is expected to add an additional 3-4 years to the project life.

    The 2008 drilling has also shown that the mineralisation is not yet fully delineated, particularly in the north west and west, and thus potential exists to easily identify additional resources with future drilling which is expected to provide for in-pit extensions.

    Exploration Update - New Satellite Projects

    Exploration work on the Paladin tenements located immediately adjacent to the Kayelekera Mining Lease has delineated two prime targets which have strong potential to contribute additional resources to the Kayelekera mining operations.

    Mpata Prospect

    The Mpata Prospect is located 15km north east of the minesite. Consistent radiometric anomalism is associated with oxidised and reduced sandstones along a 2.5km strike length. Initial limited scout drilling of 21 RC holes identified mineralisation in a 4 hole cluster 6 holes with a maximum value of 10m at 600ppm eU3O8 in reduced and oxidised sandstone in the final hole drilled and the mineralisation remains open. This target will be followed up with further drilling in the next field season commencing April 2009.

    Juma Prospect

    The Juma prospect is located 5km south, and along strike from, the Kayelekera deposit. Geological mapping and prospecting has identified reduced and oxidised Arkose units from the prospective Kayelekera Sandstone Member. Radiometric anomalies were found in both Arkose types as well as along the contact between oxidised and reduced Arkose. These anomalies occur along a 3km strike length in a structural setting that appears identical to the geological setting seen at the Kayelekera deposit. Exploration drilling in the area will start as a matter of priority in early 2009.

    Conclusion

    The improved resource status of the Project and good exploration results overall give high confidence that, with further exploration drilling on the defined prospective targets and more pit-side drilling, the life of the Kayelekera operation is able to be expanded considerably from that which is presently indicated.

    In addition the solid improvement of the spot uranium price over the past 3 weeks together with market indicators showing evidence that the uranium price will continue to strengthen confirms that the Kayelekera Project is in a very strong position to benefit, at a time when it is getting ready to start its commissioning and ramp-up phase at the commencement of the March 2009 Quarter.

    Declaration

    The information in this announcement that relates to Mineral Resources and Ore Reserves is based on information compiled by David Princep BSc MAusIMM for the Mineral Resources and Andrew Hutson BE, M.AusIMM for Ore Reserves, each of whom have more than five years experience in estimation of Mineral Resources or Ore Reserves. Mr Princep and Mr Hutson are full-time employees of Paladin Energy Ltd. Each of the above named consents to the inclusion of the information in this announcement in the form and context in which it appears.

    Please note the above declaration is also applicable in relation to the technical information contained in the September 2008 Quarterly Financial Report and MD&A released on 10 November 2008.

    FOR FURTHER INFORMATION PLEASE CONTACT:

    Paladin Energy Ltd
    John Borshoff
    Managing Director
    +61-8-9381-4366 or Mobile: +61-419-912-571
    
    
    
    
    or
    Paladin Energy Ltd
    Greg Taylor
    Investor Relations Contact
    (905) 337-7673 or Mobile (416) 605-5120 (Toronto)
    
    Email: [email protected]
    Website: www.paladinenergy.com.au
    
      1. Uranium Price, Trading Rise for Fourth Week as Output Curbed

        By Yuriy Humber

        Nov. 24 (Bloomberg) -- Uranium gained for a fourth week, the longest winning streak this year, as producers curb development of mines and utilities bought on concern prices will keep rising.

        Uranium-oxide concentrate for immediate delivery rose $2 to $55 a pound, Denver-based pricing service TradeTech LLC said in a report Nov. 21. Weekly demand totaled 6.5 million pounds, about 2 million pounds more than supply. Last week saw nine deals for 1.4 million pounds, 8 percent more than the previous week.

        ``Spot uranium demand remains steady,'' TradeTech said. ``Negative news from a variety of producers and the increase in prices over the past few weeks have spurred a number of off- market inquiries.''

        Uranium has gained $10 a pound in the past four weeks after producers including Cameco, the world's biggest, cut output and spending on new mines because of the global credit crunch and declining prices this year.

        ``Supply is choking off and demand is rising,'' said John Wong, a fund manager in London at CQS UK LLP, which has $10 billion under management. ``The forced sellers we saw two months ago are gone. In these capital markets, the producers can't raise cash for new projects, so it'll be 2013 before we see any new supply of significance.''

        China National Nuclear Corp., the nation's biggest nuclear plant builder, said Nov. 18 that weaker spot prices will hurt the country's plans to explore for the fuel at home and overseas.

        China may raise its 2020 nuclear power capacity target to at least 70 million kilowatts from 40 million kilowatts to help cut greenhouse-gas emissions and curb the effect on power production of delays in transporting coal, the Xinhua News Agency said this month, citing a state official.

        The country was forced to shut some coal-fired plants in January after the worst snowstorms in 50 years wrecked railway lines and hampered fuel transportation, leading to electricity shortages affecting half of the nation's 31 provinces. China relies on coal for two-thirds of its energy needs.

        To contact the reporter on this story: Yuriy Humber in Moscow at [email protected]

        Last Updated: November 24, 2008 05:09 EST