    1. Before the rumors start I have contact management and the insider cease trade order is still in place.

      The BCSC has excepted the annuals but the 1st quarter has to be restated before the insider cease trade order is lifted. That is why the news release below was released on Aug 29th by the TSX.

      The filings haved to be ajusted for the TSX to be satisfied. And this will be very easy since the computer files have been found and the paper work has to be ajusted.

      http://infoventure.tsx.com/TSXVentur...

      Source MARKET NEWS
      Date 08/29/2008
      Time 04:22:03 AM

      Company Palladon Ventures Ltd.
      Title BCSC
      Delinquent Filer; Annual Financial Statemen


      CDNX Symbol: PLL

      Press Release

      1. UPDATE: TUESDAY, SEPTEMBER 2, 2008

        POWER

        After a long wait to get the transformer and then the time it takes to install power poles, we finally activated the power (Figure 1) at the mine site on Thursday August 28, 2008. The power-up process started at 6 a.m. and by 2 p.m. we were testing secondary power to the individual pieces of equipment. Start-up was smooth and there were absolutely no glitches in the system.


        Figure 1: Substation Being Activated

        With the activation of the substation there will be no need to use generators for the crushers, conveyors or stacker seen in the background of the substation in Figure 2.


        Figure 2: Operating Facilities at the Mine

        BELTING

        This past week has been spent putting belts on all of the conveyors systems at the site. This has been a huge task as all of the belts have to be vulcanized once they are stretched over the systems. Belting was installed in the tunnel under the stockpile (Figure 3), and to the main conveyor system for the load-out facility. With secondary power now in place, these should be operational later this week.


        Figure 3: Stockpile Tunnel Conveyor System

        CRUSHING

        Installation of the 84-inch primary crusher was completed this week (Figure 4) as the final springs were installed and the support wall completed.


        Figure 4: 84-inch Primary Crusher

        The crushing pad is now being built behind the crusher (Figure 5) where the run-of-mine ore will be dumped from the mine prior to crushing.


        Figure 5: Building Pad Behind Crusher

        TIPPLE

        The top section of the tipple, which measures 23-feet in diameter, was moved on Friday August 29, 2008 from Gilbert’s Crusher manufacturing facility 40 miles south of the mine to our site. Figures 6 and 7 show the top section being put into place.


        Figure 6: Lifting the Top Section of the Tipple Into Place


        Figure 7: Top Section In Place

        Figure 8 shows the entire tipple structure in-place and ready to be welded and painted. The control equipment will have to be installed and the tipple will not be fully functional until the end of September. Note the feed conveyor system the background. Rail will also have to be installed under the tipple along with the weigh-scale.


        Figure 8: Entire Installed Tipple Structure

        ANNUAL GENERAL MEETING

        Just a reminder that the annual general meeting of Palladon Ventures Ltd. will be held September 17, 2008 at our offices in Salt Lake City, Utah. If you are planning on attending, or wish to tour the mine on September 18, 2008 in Cedar City, please send an email to [email protected].

        1. UPDATE: MONDAY, SEPTEMBER 8, 2008

          TEST CAR

          A test car containing 100 tons of run-of-mine ore was shipped from Iron Mountain to the Port of Long Beach to evaluate how the material dumps from the car and how the belts handle the material. After a few problems encountered with the door linkage of the test car, it dumped successfully. There are no pictures available as the 100 tons of material was dumped in approximately 2 seconds. Based on these tests, fabrication of the new cars will begin shortly with cars expected to start coming off production in about 16 weeks.

          SECONDARY POWER

          Secondary power is currently being connected to all of the equipment on the site (Figure 1). All equipment will be operational and tested this week.


          Figure 1: Secondary Power Being Installed on Stacker

          RAIL REFURBISHMENT

          The refurbishment project at the site is progressing rapidly. Rail ballast (Figure 2) is being added for the top curves 1, 2 & 3, with nearly 1/2 of the 5400 ties now in place. Seventeen hundred and fifty feet of 90 lb. rail, out of a total 2140 feet, has now been replaced with new 133 lb rail.


          Figure 2: Ballast Being Spread on Curves of Rail

          EQUIPMENT TESTING

          We are now into the final testing phase of the equipment at the site. This week we will feed run-of-mine ore through the crusher (Figure 3). This material will be added to the stockpile after crushing.


          Figure 3: Crusher Being Readied for Start-up

          In anticipation of start-up and continuous mining, Gilbert Development is now installing their offices at the site (Figure 4).


          Figure 4: Gilbert Development's Office at the Site

          ANNUAL GENERAL MEETING

          Our Annual General Meeting for shareholders will be held on Wednesday September 17, 2008 at the corporate offices in Salt Lake City, Utah. We are pleased to announce the following schedule:

          Wednesday September 17, 2008
          9:00 a.m. – Annual General Meeting
          10:30 a.m. – Closed Palladon Ventures Board Meeting
          12:30 p.m. – Iron Mountain Mine Presentation with light lunch provided

          Thursday September 18, 2008
          9:00 a.m. – Mine Tour Available
          1:00 p.m. – Mine Tour Available


          If you plan to attend the presentation and light lunch on the 17th, or either mine tour on the 18th, please RSVP to Bob Banish at 1.801.521.5252.
          The mine is located approximately 3 hours from either Las Vegas, Nevada or Salt Lake City, Utah. The address of our office at the mine is 2708 Comstock Road, Cedar City Utah, 84720.