Project Scoping Letter

http://www.fs.fed.us/r1/gallatin/?page=projects/chrome_mountain

<!-- @page { margin: 2cm } H1 { margin-top: 0cm; margin-bottom: 0cm; text-decoration: underline } H1.western { font-family: "Times New Roman", serif; font-size: 12pt; font-weight: normal } H1.cjk { font-family: "Lucida Sans Unicode"; font-size: 12pt; font-weight: normal } H1.ctl { font-family: "Tahoma"; font-size: 12pt; font-weight: normal } P { margin-bottom: 0.21cm } -->

The majority of the sites are accessible by ground-based travel, while others may be accessible only via helicopter. With respect to sites that require helicopter support, Premium is proposing that the general location of the last road-accessible site be used to move equipment and personnel via helicopter. Any tree clearing or ground leveling needed for heli-spots would be pre-approved by the USFS representative.

Premium’s proposal includes setting up a camp using portable trailers and tents in a large meadow near Whitaker Cabin (Figure 1). Implementation of this exploration proposal would require approximately 15 people living and working in the area through October 2010. Bear-resistant food storage and various sanitation and environmental protection measures would be required at the camp.

Exploratory Drilling

Due to the short length of the field season, Premium anticipates utilizing up to 2 drills for the 2010 field season. The drills would be small core rigs mounted on tracks, on a trailer, modular to be carried by a specialized rubber tracked mobile unit, or modular heli-transportable drill rig. The drills have self leveling legs or blocks which would minimize the need for site leveling. In the unlikely event that site leveling is required the topsoil would be stockpiled separate from the mineral soil and utilized during reclamation.

Join the conversation about Premium Exploration.

Reply

Replies

  1. The permitting for this project @ Chrome has been delayed,,, they ''will'' be issued however not until October or a bit later,, thus meaning this exploration on Chrome MTN. may not take place until Spring do to Snow.

    It is fact about the delay however it is my speculation the testing will not be started until Spring do to Snow.. is my opinion.

    1. That is also what I have heard is that permitting will not happen till October and that would eliminate any chance of a drill campaign this year. If Premium does spin-off Montana and it looks like a done deal with Premium shareholders receiving shares in that company, a PP will still have to be done to create the cash necessary to start a drill campaign on Chrome Mountain. Remember who the Australian group is backed by, the Chinese. Didn't Ausmon have their own PP before they bought into the Premium PP, that is were the money came from. Any need for cash to purchase warrant will not be a problem for Ausmon as China will support any purchase and I would think a PP for Montana would be scooped by Chineses investors via Ausmon especially if they have members on the BOD's.

    2. Yup, it's been posted.

      I had also emailed the government.

      here is their reply:

      Dear --------

      The Plan of Operations has not yet been approved. We have indicated to Premium that the Plan could potentially be approved in October 2010 at the earliest.
      The Forest Service is currently completing environmental analysis as required by the National Environmental Policy Act and Forest Service policy. This included a 30 day public comment period, which closed August 2, 2010. We did receive several responses which will be considered in the environmental analysis.

      If you have any additional questions or information needs, please feel free to contact me. Thanks for your interest in this project.

      Sincerely,

      Dan Seifert
      Assistant Forest Geologist
      Custer National Forest
      6811 US Highway 212 S., Red Lodge, MT 59068
      (406) 446-4520, [email protected]